Attachment of Brick Veneer in High-Wind Regions Table 1. Brick Veneer Tie Spacing Wind Speed (mph)(3-Second Peak Gust) Maximum Vertical Spacing for Ties 16" stud spacing 24" stud Protecting Against Hurricanes spacing 90 18.0a 16.0a 100 18.0a 16.0a 110 18.0a 14.8 120 18.0a NAb 130 15.9 NAb 140 13.7 NAb 150 10.2 Nab 

Wind Pressure (psf) Maximum Vertical Spacing for Ties 16" stud spacing Protecting Against Hurricanes 24" stud spacing 17.8 18.0a 16.0 a 22.0 18.0a 16.0 a 26.6 18.0a 14.8 31.6 18.0a NA b 37.1 15.9 NA b 43.0 13.7 NA b 49.4 10.2 Na b Notes: 1. 

The tie spacing is based on wind loads derived from Method 1 of ASCE 7-02, for the corner area of buildings up to 30' high, located in Exposure B with an importance factor (I) of 1.0 and no topographic influence. For other heights, exposure, or Protecting Against Hurricanes importance factor, an engineered design is recommended. 2. 

Fastener strength is for wall framing with a Specific Gravity G=0.55 with moisture contents less than 19% and the following adjustment factors, Protecting Against Hurricanes Ct=0.8; and CD, CM, Ceg, and Ctn=1.0. 3. 

Nail embedment depth of 2" for 2.5" long 8d common (0.131" diameter) ring- shank fasteners a Maximum spacing allowed by ACI 530-05 b 24" stud spacing exceeds the maximum horizontal tie spacing of ACI 530-05 prescribed for wind speeds over 100 mph [End table] Attachment of Protecting Against Hurricanes Rooftop Equipment in High-Wind Regions

Hurricane Katrina Recovery AdvisoryMay 2006, Revised July 2006FEMA Purpose: To recommend practices for designing and Protecting Against Hurricanes installing rooftop equipment that will enhance wind resistance in high-wind regions. [Begin text box]

Note: For attachment of lightning protection systems, see Hurricane Katrina Recovery Advisory on Protecting Against Hurricanes Rooftop Attachment of Lightning Protection Systems in High-Wind Regions. [End text box] Key Issues Rooftop equipment frequently becomes detached from rooftops during hurricanes. 

Water can enter the building at displaced equipment (see Figure 1); displaced equipment can puncture and Protecting Against Hurricanes tear roof coverings (thus allowing water to leak into the building). Equipment blown from a roof can damage buildings and injure people. Damaged equipment may no longer provide service to the building. Figure 1 caption. 

This gooseneck was attached with only two small screws. A substantial amount of water was able to enter the building during the hurricane. [end of caption] Construction Guidance Mechanical Penthouse: Protecting Against Hurricanes By placing equipment in mechanical penthouses rather than being exposed on the roof, equipment within penthouses is shielded from high-wind loads and windborne debris. 

Therefore, use of mechanical penthouses designed and constructed in accordance with a current building code are recommended, Protecting Against Hurricanes particularly for critical and essential facilities.Design Loads and Safety Factors: Loads on rooftop equipment should be determined in accordance with the 2005 edition of ASCE 7. Figure 2 caption. 

This 30’ x 10’ x 8’ 18,000-pound HVAC unit was attached to its curb with 16 straps (one screw per strap). Although the wind speeds were Protecting Against Hurricanes estimated to be only 85 to 95 miles per hour (3-second peak gust), it blew off the building. [end of caption] 

Note: For guidance on load calculations, see "Calculating Wind Loads and Anchorage Requirements for Rooftop Equipment,” ASHRAE Journal, volume 48, number 3, March 2006. A minimum safety factor of 3 is recommended for critical and essential facilities, and Protecting Against Hurricanes a minimum safety factor of 2 is recommended for other buildings. 

Loads and resistance should also be calculated for heavy pieces of equipment (see Figure 2). Simplified Attachment Table: To anchor fans, small HVAC units, and relief air hoods, Protecting Against Hurricanes the following minimum attachment schedule is recommended (see Table 1) (note: the attachment of the curb to the roof deck also needs to be designed to resist the design loads):   

Number of #12 Screws for Base Case Attachment of Rooftop Equipment Case No.: 1 Curb Size and Equipment Type: 12”x 12” Curb with Protecting Against Hurricanes Gooseneck Relief Air Hood Equipment Attachment: Hood Screwed to Curb Fastener Factor for Each Side of Curb or Flange: 1.6 Case No.: 2Curb Size and Equipment Type: 12”x 12” 

Gooseneck Relief Air Hood with Flange Equipment Attachment: Flange Screwed to 22 Gauge Steel Roof Deck Fastener Factor for Each Side of Curb or Protecting Against Hurricanes Flange: 2.8 Case No.: 3Curb Size and Equipment Type: 12”x 12” Gooseneck Relief Air Hood with FlangeEquipment Attachment: Flange Screwed to 15/32” OSB Roof Deck 

Fastener Factor for Each Side of Curb or Flange: 2.9 Case No.: 4Curb Size and Equipment Type: 24”x 24” Curb with Gooseneck Relief Air HoodEquipment Attachment: Hood Screwed to Protecting Against Hurricanes Curb Fastener Factor for Each Side of Curb or Flange: 4.6 Case No.: 5Curb Size and Equipment Type: 24”x 24” Gooseneck Relief Air Hood with Flange

Equipment Attachment: Flange Screwed to 22 Gauge Steel Roof Deck Fastener Factor for Each Side of Curb or Protecting Against Hurricanes Flange: 8.1 Case No.: 6Curb Size and Equipment Type: 24”x 24” Gooseneck Relief Air Hood with Flange Equipment Attachment: Flange Screwed to 15/32” OSB Roof Deck Fastener Factor for Each Side of Curb or Flange: 8.2 Case No.: 7

Curb Size and Equipment Type: 24”x 24” Curb with Exhaust Fan Equipment Attachment: Fan Screwed to CurbFastener Factor for Each Side of Curb or Protecting Against Hurricanes Flange: 2.5 Case No.: 8Curb Size and Equipment Type: 36”x 36” Curb with Exhaust FanEquipment Attachment: Fan Screwed to Curb

Fastener Factor for Each Side of Curb or Flange: 3.3 Case No.: 9Curb Size and Equipment Type: 5’-9”x 3’- 8” Curb with 2’- 8” high HVAC UnitEquipment Attachment: HVAC Unit Screwed to CurbFastener Factor for Each Side of Curb or Protecting Against Hurricanes Flange:  

Case No.: 10Curb Size and Equipment Type: 5’-9”x 3’- 8” Curb with 2’- 8” high Relief Air HoodEquipment Attachment: Hood Screwed to CurbFastener Factor for Each Side Protecting Against Hurricanes of Curb or Flange: 35.6* Notes to Table: 1. The loads are based on the 2005 edition of ASCE 7. The resistance includes equipment weight. 

The Base Case of the tabulated numbers of #12 screws (or ¼ pan-head screws for flange-attachment) is a 90-mph basic wind speed, 1.15 importance factor, 30’ building height, Protecting Against Hurricanes Exposure C, using a safety factor of 3.

Find Out If A Neighbor Is Running A Meth Lab

 
Evaluation and remediation of chemical spills and residuesIf any liquid or powder residues remain after DEA removal, contact Meth Lab Cleanup Find Out If A Neighbor Is Running A Meth Lab the DEA  read more..

What Are Molds?

What are molds? Molds are microscopic organisms that live on plant or animal matter. They aid in the break down of dead material and recycle nutrients in the environment. Present virtually everywhere, they can be found growing on organic material such as soil, foods, and plant matter. In order to re  read more..

Calculate Space In A Water Damaged Room For A Dehu

Compression Ratio Dehumidification APPLICATIONS OF TECHNOLOGY: Commercial and residential buildings ADVANTAGES: Reduces indoor moisture to inhibit mold growth and moisture damage Energy efficient—air does not have to be reheated prior to delivery No refrigerant Dehumidification Calculate Space In A Water Damaged Room For A Dehu or desiccant material   read more..

Cleaning Up Water In Carpet

Daily wear and tear means that materials, furniture and furnishings require periodic replacement.Following are Sustainable Strategies to consider as you replace MATERIALS, FURNITURE AND FURNISHINGS. Refer to the Share Section for a representative project Case Study to discover key practices, benefit  read more..

How To Test The Air After Asbestos Has Been Remove

Route of Entry Inhalation, ingestion. II. Toxicology Clinical evidence of the adverse effects associated with exposure to asbestos is present in the form of several well-conducted epidemiological Asbestos Abatement How To Test The Air After Asbestos Has Been Remove studies of occupationally exposed workers, family contacts of workers, and persons living  read more..

How To Restore Flood Soaked Books

Microfilming and other types of photo duplication are a cost-effective alternative for preserving information when extensive treatment of the original is not practical. Copying also has advantages when combined with treatment; by eliminating the need to handle fragile materials, copying makes minima  read more..

Lead Poisoning Causes Health Problems

Current Cal/OSHA (California Division of Occupational Safety and Health) and Federal OSHA (Occupational Safety and Health Administration) regulations tie BLL testing requirements to air monitoring. Employers must do initial air monitoring and, if air lead concentrations are above 30 µg/m3 more th  read more..

How Does A Dehumidifier Work

Principal Findings and Significance This experimental study focuses on parametric trends in the freshwater-production rate, i.e., how the production rate of freshwater is affected by changes in the various thermal/fluid parameters. We are particularly interested in how the freshwater-production rate  read more..

Animal Damage

Skunks are very well-known, nocturnal residents of most of the country. The common striped skunk, is characterized by prominent, lateral white stripes that run all the way down its back. Otherwise, the skunk’s fur is jet black, the body of the adult striped skunk is about the same size o  read more..

Tenant Trash Removal

BEFORE YOU RENT Before signing a lease agreement, prospective tenants should carefully read the lease and be sure they understand all of the requirements, provisions, rules, addendums, and laws that apply. If you have a question, ask the landlord and make sure you understand the answer, Tenant Move Out Cleanup Tenant Trash Removal and tha  read more..