Attachment of Brick Veneer in High-Wind Regions Table 1. Brick Veneer Tie Spacing Wind Speed (mph)(3-Second Peak Gust) Maximum Vertical Spacing for Ties 16" stud spacing 24" stud Protecting Against Hurricanes spacing 90 18.0a 16.0a 100 18.0a 16.0a 110 18.0a 14.8 120 18.0a NAb 130 15.9 NAb 140 13.7 NAb 150 10.2 Nab 

Wind Pressure (psf) Maximum Vertical Spacing for Ties 16" stud spacing Protecting Against Hurricanes 24" stud spacing 17.8 18.0a 16.0 a 22.0 18.0a 16.0 a 26.6 18.0a 14.8 31.6 18.0a NA b 37.1 15.9 NA b 43.0 13.7 NA b 49.4 10.2 Na b Notes: 1. 

The tie spacing is based on wind loads derived from Method 1 of ASCE 7-02, for the corner area of buildings up to 30' high, located in Exposure B with an importance factor (I) of 1.0 and no topographic influence. For other heights, exposure, or Protecting Against Hurricanes importance factor, an engineered design is recommended. 2. 

Fastener strength is for wall framing with a Specific Gravity G=0.55 with moisture contents less than 19% and the following adjustment factors, Protecting Against Hurricanes Ct=0.8; and CD, CM, Ceg, and Ctn=1.0. 3. 

Nail embedment depth of 2" for 2.5" long 8d common (0.131" diameter) ring- shank fasteners a Maximum spacing allowed by ACI 530-05 b 24" stud spacing exceeds the maximum horizontal tie spacing of ACI 530-05 prescribed for wind speeds over 100 mph [End table] Attachment of Protecting Against Hurricanes Rooftop Equipment in High-Wind Regions

Hurricane Katrina Recovery AdvisoryMay 2006, Revised July 2006FEMA Purpose: To recommend practices for designing and Protecting Against Hurricanes installing rooftop equipment that will enhance wind resistance in high-wind regions. [Begin text box]

Note: For attachment of lightning protection systems, see Hurricane Katrina Recovery Advisory on Protecting Against Hurricanes Rooftop Attachment of Lightning Protection Systems in High-Wind Regions. [End text box] Key Issues Rooftop equipment frequently becomes detached from rooftops during hurricanes. 

Water can enter the building at displaced equipment (see Figure 1); displaced equipment can puncture and Protecting Against Hurricanes tear roof coverings (thus allowing water to leak into the building). Equipment blown from a roof can damage buildings and injure people. Damaged equipment may no longer provide service to the building. Figure 1 caption. 

This gooseneck was attached with only two small screws. A substantial amount of water was able to enter the building during the hurricane. [end of caption] Construction Guidance Mechanical Penthouse: Protecting Against Hurricanes By placing equipment in mechanical penthouses rather than being exposed on the roof, equipment within penthouses is shielded from high-wind loads and windborne debris. 

Therefore, use of mechanical penthouses designed and constructed in accordance with a current building code are recommended, Protecting Against Hurricanes particularly for critical and essential facilities.Design Loads and Safety Factors: Loads on rooftop equipment should be determined in accordance with the 2005 edition of ASCE 7. Figure 2 caption. 

This 30’ x 10’ x 8’ 18,000-pound HVAC unit was attached to its curb with 16 straps (one screw per strap). Although the wind speeds were Protecting Against Hurricanes estimated to be only 85 to 95 miles per hour (3-second peak gust), it blew off the building. [end of caption] 

Note: For guidance on load calculations, see "Calculating Wind Loads and Anchorage Requirements for Rooftop Equipment,” ASHRAE Journal, volume 48, number 3, March 2006. A minimum safety factor of 3 is recommended for critical and essential facilities, and Protecting Against Hurricanes a minimum safety factor of 2 is recommended for other buildings. 

Loads and resistance should also be calculated for heavy pieces of equipment (see Figure 2). Simplified Attachment Table: To anchor fans, small HVAC units, and relief air hoods, Protecting Against Hurricanes the following minimum attachment schedule is recommended (see Table 1) (note: the attachment of the curb to the roof deck also needs to be designed to resist the design loads):   

Number of #12 Screws for Base Case Attachment of Rooftop Equipment Case No.: 1 Curb Size and Equipment Type: 12”x 12” Curb with Protecting Against Hurricanes Gooseneck Relief Air Hood Equipment Attachment: Hood Screwed to Curb Fastener Factor for Each Side of Curb or Flange: 1.6 Case No.: 2Curb Size and Equipment Type: 12”x 12” 

Gooseneck Relief Air Hood with Flange Equipment Attachment: Flange Screwed to 22 Gauge Steel Roof Deck Fastener Factor for Each Side of Curb or Protecting Against Hurricanes Flange: 2.8 Case No.: 3Curb Size and Equipment Type: 12”x 12” Gooseneck Relief Air Hood with FlangeEquipment Attachment: Flange Screwed to 15/32” OSB Roof Deck 

Fastener Factor for Each Side of Curb or Flange: 2.9 Case No.: 4Curb Size and Equipment Type: 24”x 24” Curb with Gooseneck Relief Air HoodEquipment Attachment: Hood Screwed to Protecting Against Hurricanes Curb Fastener Factor for Each Side of Curb or Flange: 4.6 Case No.: 5Curb Size and Equipment Type: 24”x 24” Gooseneck Relief Air Hood with Flange

Equipment Attachment: Flange Screwed to 22 Gauge Steel Roof Deck Fastener Factor for Each Side of Curb or Protecting Against Hurricanes Flange: 8.1 Case No.: 6Curb Size and Equipment Type: 24”x 24” Gooseneck Relief Air Hood with Flange Equipment Attachment: Flange Screwed to 15/32” OSB Roof Deck Fastener Factor for Each Side of Curb or Flange: 8.2 Case No.: 7

Curb Size and Equipment Type: 24”x 24” Curb with Exhaust Fan Equipment Attachment: Fan Screwed to CurbFastener Factor for Each Side of Curb or Protecting Against Hurricanes Flange: 2.5 Case No.: 8Curb Size and Equipment Type: 36”x 36” Curb with Exhaust FanEquipment Attachment: Fan Screwed to Curb

Fastener Factor for Each Side of Curb or Flange: 3.3 Case No.: 9Curb Size and Equipment Type: 5’-9”x 3’- 8” Curb with 2’- 8” high HVAC UnitEquipment Attachment: HVAC Unit Screwed to CurbFastener Factor for Each Side of Curb or Protecting Against Hurricanes Flange:  

Case No.: 10Curb Size and Equipment Type: 5’-9”x 3’- 8” Curb with 2’- 8” high Relief Air HoodEquipment Attachment: Hood Screwed to CurbFastener Factor for Each Side Protecting Against Hurricanes of Curb or Flange: 35.6* Notes to Table: 1. The loads are based on the 2005 edition of ASCE 7. The resistance includes equipment weight. 

The Base Case of the tabulated numbers of #12 screws (or ¼ pan-head screws for flange-attachment) is a 90-mph basic wind speed, 1.15 importance factor, 30’ building height, Protecting Against Hurricanes Exposure C, using a safety factor of 3.

Ceiling Leak Under Bathroom

For constant boundary conditions, a homogeneous material, and a fully developed moisture profile, the signal velocity of this profile inside the material is constant over the square root of time. This is well known and frequently observed for water absorption, Structural Drying Ceiling Leak Under Bathroom but it applies similarly  read more..

Lead Paint Removal Methods In California

It should be kept in mind that this is not a rigorous comparison; it is not based on a staged side-by-side use of the different methods to remove the same mass of paint containing the same percentage weight of lead. This lack of strict methodological control somewhat weakens the case for substitutio  read more..

Lead Can Hurt Your Child

Lead can hurt your child. Take these steps to keep your child safe from lead. Keep your home clean and dust free. Wet mop floors, wet wipe window sills, vacuum, and wash all surfaces often. Use household cleaner and rinse with clean water. This keeps lead in dust from spreading in the house. Do not   read more..

Carpet Steam Cleaning Tips

Run the system fans continuously to encourage air movement throughout the facility and in rooms housing wet materials All wet carpeting and furniture should be removed from areas where materials are airdrying and/or being packed for drying offsite.. Use of fans and dehumidifiers Water-soaked mater  read more..

Certified To Do Lead Removal

If you wish to become certified to do lead-related construction work in California, you must take training from one of the Department of Public Health's (CDPH) accredited training providers. To find out where you can take the this training, go to this link to see the list of approved lead-related co  read more..

What Does Asbestos Look Like

What programs are available to help individuals with what does asbestos look like-related diseases? Some people with what does asbestos look like-related illness may be eligible for Medicare coverage. Information about benefits is available from Medicare's Regional Offices, located in 10 major citie  read more..

Grants For Asbestos Removal

Because asbestos was used so frequently and because of the dangers of asbestos it is possible to secure grants for Asbestos Abatement Grants For Asbestos Removal. Now the cannot be used in every case it only a select few will be eligible and the regulations will be different depending on which state you live in and which area of the   read more..

Lead Disclosure

All renters who live in Lead Paint Removal Lead Disclosure buildings that were built before 1978 must be provided two copies of the Tenant Lead Law Notification and Tenant Certification Form. If any of the following official papers exist for the rental, renters must also be provided a copy of those as well. Lead exam  read more..

Structural Drying

In homes that have a basement or a slab-on-grade foundation, Radon Mitigation Structural Drying is usually reduced by one of four kinds of soil depressurization: sub slab depressurization, drain tile depressurization, sump hole depressurization, or block wall depressurization.
Active sub slab depressurization (al  read more..

Lead Paint Removal Health Risks

The zinc protoporphyrin test, unlike the blood lead determination, measures an adverse metabolic effect of lead and as such is a better indicator of lead toxicity than the level of blood lead itself. The level of ZPP reflects lead absorption over the preceding 3 to 4 months, and therefore is a bette  read more..