Attachment of Brick Veneer in High-Wind Regions Hurricane Katrina Recovery Advisory FEMA December 2005 Purpose: To recommend practices for installing brick veneer that will enhance wind resistance in high-wind areas. Key Issues. Brick veneer is frequently blown off Recovering Hurricane Katrina walls of residential and commercial buildings (Figure 1). 

When brick veneer fails, wind-driven water can enter and damage buildings, and building occupants can be vulnerable to injury from windborne debris (particularly if walls are sheathed with plastic foam insulation or Recovering Hurricane Katrina wood fiberboard in lieu of wood panels). Pedestrians in the vicinity of damaged walls can also be vulnerable to injury from falling veneer (Figure 2). 

Figure 1. Failed brick veneer. Plastic foam wall sheathing was Recovering Hurricane Katrina installed over the wood studs (plywood was temporarily installed after the brick failure). Figure 2. The upper portion of the brick veneer at this apartment building collapsed. 

Pedestrian and vehicular traffic in the vicinity of the damaged wall were vulnerable to injury and Recovering Hurricane Katrina damage if remaining portions of the wall were to collapse during subsequent storms. 

Common failure modes include tie (anchor) fastener pull-out (Figure 3), failure of masons to embed ties into the mortar (Figure 4), poor bonding between ties and Recovering Hurricane Katrina mortar and mortar of poor quality (Figure 5), and tie corrosion (Figure 6). Figure 3. This tie remained embedded in the mortar joint while the smooth-shank nail pulled from the stud. 

These four ties were never embedded into the mortar joint. Figure 5. This tie was embedded in the mortar, but the bond was poor. Figure 6. There were several ties in this portion of the wall, Recovering Hurricane Katrina but they failed due to severe corrosion. Ties are often installed before brick laying begins. When this is done, ties are often improperly placed above or below the mortar joints. 

When misaligned, the ties must be angled up or down in order for the ties to be embedded into the mortar joints (Figure 7). Misalignment not only reduces embedment depth but also reduces the effectiveness of the ties because Recovering Hurricane Katrina wind forces do not act parallel to the ties themselves. Figure 7. Misalignment of the tie reduces the embedment and promotes veneer failure. 

Corrugated ties typically used in residential veneer construction provide little resistance to compressive loads. Use of compression struts would likely be beneficial, Recovering Hurricane Katrina but off-the-shelf devices do not currently exist. Two-piece adjustable ties (Figure 8) provide significantly greater compressive strength than corrugated ties. 

Figure 8. Examples of two-piece adjustable ties, one showing base and vee anchor and the other showing eye and Recovering Hurricane Katrina pintle anchor Many buildings that exhibited damaged veneer were not in compliance with current building codes. Building code requirements for brick veneer have changed over the years. 

Model codes prior to 1995 permitted brick veneer in any location, Recovering Hurricane Katrina with no wind speed restrictions. Wall area per tie in some model codes was greater than the current maximum. 

The current masonry code referenced in model building codes, Building Code Requirements for Masonry Structures, ACI 530/ASCE 5/TMS 402 (ACI 530) addresses brick veneer in two manners: Recovering Hurricane Katrina rational design and prescriptive requirements. Essentially all brick veneer in residential and low-rise construction follows the prescriptive requirements. 

The first edition of American Concrete Institute’s (ACI’s) 530 limited the use of prescriptive design to areas with a basic wind speed of 110 mph or less. The 2005 edition of ACI 530 extended the prescriptive requirements to include a basic wind speed of 130 mph, Recovering Hurricane Katrina with lower area per tie limits. 

In locations with a basic wind speed above 130 mph, the rational design approach must be used. Compliance with ACI 530-05 should reduce wind damage. The following Brick Industry Association (BIA) Technical Notes Recovering Hurricane Katrina provide guidance on brick veneer: Technical Notes 28 – Anchored Brick Veneer, Wood Frame Construction, Technical Notes.

Brick Veneer/Steel Stud Walls, and Technical Notes 44B – Wall Ties (available online at www.bia.org). These Technical Notes provide attachment recommendations, Recovering Hurricane Katrina but the recommendations are not specific for high-wind regions and are, therefore, inadequate. Construction Guidance The brick veneer wall system is complex in its behavior. 

There are limited test data on which to draw. The following guidance is based on professional judgment, wind loads specified in ASCE 7-02 "Design Loads for Buildings and Recovering Hurricane Katrina Other Structures,” fastener strengths specified in the American Forest and Paper Association’s (AF&PA’s) National Design Specification for Wood Construction, and brick veneer standards contained in ACI 530-05. 

In addition to the general guidance given in BIA Technical Notes 28 and 28B, the following are recommended: Note: In areas that are also susceptible to high seismic loads, brick veneer should be evaluated by an engineer to ensure it can resist seismic and Recovering Hurricane Katrina wind design loads. Stud Spacing: For new construction, space studs 16" on center, so that ties can be anchored at this spacing. 

Tie Fasteners: Ring-shank nails are recommended in lieu of smooth-shank nails. A minimum embedment of 2" is suggested. Ties: For use with wood studs: two-piece adjustable ties are recommended. However, Recovering Hurricane Katrina where corrugated steel ties are used, use 22-gauge minimum, 7/8" wide by 6" long, complying with ASTM A 366 with a zinc coating complying with ASTM.

A 153 Class B2. For ties for use with steel studs, see BIA "Technical Notes 28B – Brick Veneer/Steel Stud Walls.” Stainless steel ties should be used in areas within 3,000 feet of the coast. Tie Installation Install ties as the brick is laid so that the ties are properly aligned with Recovering Hurricane Katrina the mortar joints. Install brick ties spaced per Table 1. 

Studs should be installed at 16" spacing. Veneer tie locations for 24" stud spacing are included for repairing damaged veneer on existing buildings with the wider stud spacing. Locate ties within 8" of door and Recovering Hurricane Katrina window openings and within 12" of the top of veneer sections. Bend the ties at a 90-degree angle at the nail head in order to minimize tie flexing when the ties are loaded in tension or compression (Figure 9). Figure 9. 

Bend ties at nail heads Embed ties in joints so that mortar completely encapsulates the ties. Embed a minimum of 1.5" into the bed joint, Recovering Hurricane Katrina with a minimum mortar cover of 5/8" to the outside face of the wall (Figure 10). Figure 10. Tie embedment [Begin table]

Flood Runner

46. Is there a waiting period for Flood Damage Flood Runner insurance to become effective? Yes. There is a 30-day waiting period before flood coverage goes into effect. The effective date of a new policy will be 12:01 a.m., local time, on the 30th calendar day after the application date and the presentment of premium.&  read more..

Contaminated Sewage Water

DEALING WITH WATER DAMAGE When should clean up begin? Clean up should begin as soon as it is safe to return to the building. Prompt and proper clean up is important for your health. Flood waters can contain microorganisms (such as bacteria, molds, and viruses), raw sewage, dead animals, Water Damage Contaminated Sewage Water&nb  read more..

Hoarding And How To Get Started Cleaning Your Place

How to use the mop 1. Fill bucket or kitchen sink with warm water.2.Add 1 cup of vinegar to one gallon of warm water for vinyl floors.3. Add 1/4 cup of Murphys Oil soap to one gallon of warm water for wood floors.4.Wet mop head in prepared water.5. Use handle to wring mop as dry as possible 6.Mop a   read more..

How To Contract FEMA For Debris Removal

The alternative procedures authorized under the law pertain to debris removal (emergency work)and repair, restoration, and replacement of disaster-damaged public and private non profit facilities(permanent work). This guide outlines the alternative Debris Removal How To Contract FEMA For Debris Removal procedures for debris removal o  read more..

How To Promote Emergency Preparedness

Bomb Threat If you receive a bomb threat telephone call:Remain calm.Listen carefully. Be polite and show interest.Try to keep the caller talking to learn more information. If possible, Emergency Board up How To Promote Emergency Preparedness write a note to a colleague to call the authorities or, as soon as the caller hangs up, immediately   read more..

Toxic Mold

Mold gradually destroy the things they grow on. Prevent damage to building materials and furnishings, save money, and avoid potential health risks by controlling moisture and eliminating mold growth Concern about indoor exposure to mold has been increasing as the public becomes aware that exposure  read more..

How To Remove Structural Lead Paint

Return of the Employee to Former Job Status. (A) The employer shall return an employee to his or her former job status: 1. For an employee removed due to a blood lead-level at or above 80 µg/100 g when two consecutive blood sampling tests indicate that the employee's blood lead level is at Lead Paint Removal How To Remove Structural Lead Paint o  read more..

Dust From Removing Lead Paint

Get Ahead of Lead! Encapsulants: A Teachnique to Control Lead Paint Hazards A complete copy of the Get Ahead of Lead! Encapsulants: A Technique to Control Lead Paint Hazards brochure is available in Adobe Portable Document Format (PDF, 175 KB). Lead-based paint is a health hazard to children and adu  read more..

Testing Your Home For Lead In Paint And Soil

Testing Your Home For Lead In Paint and Soil Why should I test my home for lead? If you have children, lead in your home can cause serious long term health and behavior problems for them. Lead is a hazard to children under 6 years of age in particular. Lead in paint, dust and soil is a problem for c  read more..

Forensics

Human remains are treated as a separate and unique type of Crime Scene Cleanup Forensics evidence. An autopsy of the remains is completed to determine the cause and manner of any death that is violent, unusual or untimely. A pathologist will examine the human remains (post-mortem examination) and consider death scene fin  read more..