Wind Damage >> Recovering Hurricane Katrina

Attachment of Brick Veneer in High-Wind Regions Hurricane Katrina Recovery Advisory FEMA December 2005 Purpose: To recommend practices for installing brick veneer that will enhance wind resistance in high-wind areas. Key Issues. Brick veneer is frequently blown off Recovering Hurricane Katrina walls of residential and commercial buildings (Figure 1). 

When brick veneer fails, wind-driven water can enter and damage buildings, and building occupants can be vulnerable to injury from windborne debris (particularly if walls are sheathed with plastic foam insulation or Recovering Hurricane Katrina wood fiberboard in lieu of wood panels). Pedestrians in the vicinity of damaged walls can also be vulnerable to injury from falling veneer (Figure 2). 

Figure 1. Failed brick veneer. Plastic foam wall sheathing was Recovering Hurricane Katrina installed over the wood studs (plywood was temporarily installed after the brick failure). Figure 2. The upper portion of the brick veneer at this apartment building collapsed. 

Pedestrian and vehicular traffic in the vicinity of the damaged wall were vulnerable to injury and Recovering Hurricane Katrina damage if remaining portions of the wall were to collapse during subsequent storms. 

Common failure modes include tie (anchor) fastener pull-out (Figure 3), failure of masons to embed ties into the mortar (Figure 4), poor bonding between ties and Recovering Hurricane Katrina mortar and mortar of poor quality (Figure 5), and tie corrosion (Figure 6). Figure 3. This tie remained embedded in the mortar joint while the smooth-shank nail pulled from the stud. 

These four ties were never embedded into the mortar joint. Figure 5. This tie was embedded in the mortar, but the bond was poor. Figure 6. There were several ties in this portion of the wall, Recovering Hurricane Katrina but they failed due to severe corrosion. Ties are often installed before brick laying begins. When this is done, ties are often improperly placed above or below the mortar joints. 

When misaligned, the ties must be angled up or down in order for the ties to be embedded into the mortar joints (Figure 7). Misalignment not only reduces embedment depth but also reduces the effectiveness of the ties because Recovering Hurricane Katrina wind forces do not act parallel to the ties themselves. Figure 7. Misalignment of the tie reduces the embedment and promotes veneer failure. 

Corrugated ties typically used in residential veneer construction provide little resistance to compressive loads. Use of compression struts would likely be beneficial, Recovering Hurricane Katrina but off-the-shelf devices do not currently exist. Two-piece adjustable ties (Figure 8) provide significantly greater compressive strength than corrugated ties. 

Figure 8. Examples of two-piece adjustable ties, one showing base and vee anchor and the other showing eye and Recovering Hurricane Katrina pintle anchor Many buildings that exhibited damaged veneer were not in compliance with current building codes. Building code requirements for brick veneer have changed over the years. 

Model codes prior to 1995 permitted brick veneer in any location, Recovering Hurricane Katrina with no wind speed restrictions. Wall area per tie in some model codes was greater than the current maximum. 

The current masonry code referenced in model building codes, Building Code Requirements for Masonry Structures, ACI 530/ASCE 5/TMS 402 (ACI 530) addresses brick veneer in two manners: Recovering Hurricane Katrina rational design and prescriptive requirements. Essentially all brick veneer in residential and low-rise construction follows the prescriptive requirements. 

The first edition of American Concrete Institute’s (ACI’s) 530 limited the use of prescriptive design to areas with a basic wind speed of 110 mph or less. The 2005 edition of ACI 530 extended the prescriptive requirements to include a basic wind speed of 130 mph, Recovering Hurricane Katrina with lower area per tie limits. 

In locations with a basic wind speed above 130 mph, the rational design approach must be used. Compliance with ACI 530-05 should reduce wind damage. The following Brick Industry Association (BIA) Technical Notes Recovering Hurricane Katrina provide guidance on brick veneer: Technical Notes 28 – Anchored Brick Veneer, Wood Frame Construction, Technical Notes.

Brick Veneer/Steel Stud Walls, and Technical Notes 44B – Wall Ties (available online at www.bia.org). These Technical Notes provide attachment recommendations, Recovering Hurricane Katrina but the recommendations are not specific for high-wind regions and are, therefore, inadequate. Construction Guidance The brick veneer wall system is complex in its behavior. 

There are limited test data on which to draw. The following guidance is based on professional judgment, wind loads specified in ASCE 7-02 "Design Loads for Buildings and Recovering Hurricane Katrina Other Structures,” fastener strengths specified in the American Forest and Paper Association’s (AF&PA’s) National Design Specification for Wood Construction, and brick veneer standards contained in ACI 530-05. 

In addition to the general guidance given in BIA Technical Notes 28 and 28B, the following are recommended: Note: In areas that are also susceptible to high seismic loads, brick veneer should be evaluated by an engineer to ensure it can resist seismic and Recovering Hurricane Katrina wind design loads. Stud Spacing: For new construction, space studs 16" on center, so that ties can be anchored at this spacing. 

Tie Fasteners: Ring-shank nails are recommended in lieu of smooth-shank nails. A minimum embedment of 2" is suggested. Ties: For use with wood studs: two-piece adjustable ties are recommended. However, Recovering Hurricane Katrina where corrugated steel ties are used, use 22-gauge minimum, 7/8" wide by 6" long, complying with ASTM A 366 with a zinc coating complying with ASTM.

A 153 Class B2. For ties for use with steel studs, see BIA "Technical Notes 28B – Brick Veneer/Steel Stud Walls.” Stainless steel ties should be used in areas within 3,000 feet of the coast. Tie Installation Install ties as the brick is laid so that the ties are properly aligned with Recovering Hurricane Katrina the mortar joints. Install brick ties spaced per Table 1. 

Studs should be installed at 16" spacing. Veneer tie locations for 24" stud spacing are included for repairing damaged veneer on existing buildings with the wider stud spacing. Locate ties within 8" of door and Recovering Hurricane Katrina window openings and within 12" of the top of veneer sections. Bend the ties at a 90-degree angle at the nail head in order to minimize tie flexing when the ties are loaded in tension or compression (Figure 9). Figure 9. 

Bend ties at nail heads Embed ties in joints so that mortar completely encapsulates the ties. Embed a minimum of 1.5" into the bed joint, Recovering Hurricane Katrina with a minimum mortar cover of 5/8" to the outside face of the wall (Figure 10). Figure 10. Tie embedment [Begin table]

Radon Remediation

To assist you to protect your own health and the health of your loved ones, you must take action to repair your home if the outcome of one long-term test or even the average of two short-term tests are 4 pCi/l or more, and not on a single short-term assessment only. The more the radon level i  read more..

Carpet Stains From Storm Damage

Because both characteristics vary broadly in lumber cut from different species and trees of the same species, they account for much of the normal variations encountered in the character of wood and its response to cure or use. 'As an archetype, the time needed to dry wood under a given set of condit  read more..

Asbestos Flooring

Question 1: Are we correct that Asbestos Abatement Asbestos Flooring floor tile cleaning activities (normal maintenance such as stripping and buffing operations) are covered under both the Asbestos flooring General Industry Standard (§1910.1001) and the Asbestos flooring Construction Standard (§1926.1101)?  <  read more..

Flooded Areas With Lead based Paint Tennessee

(ATLANTA – May 26, 2010) – Due to recent flooding in western and central Tennessee, the U.S. Environmental Protection Agency (EPA) in Region 4 wants to ensure that families are not at increased risk for lead poisoning, because of clean up and/or Flood Damage Flooded Areas With Lead based Paint Tennessee repair work. 

  read more..

Mold Inside The Wall From A Plumbing Leak

By The Post-Standard Syracuse, NY -- The daily doses of rain that have fallen on Central New York this spring may have some Syracuse area residents ready to call Noah for a reservation. The region has received at least a trace of rain every day since April 16. Since then, Mold Remediation Mold Inside The Wall From A Plumbing Leak about 8 inch  read more..

Storm Damage

If you live in a part of the country that have storms on a somewhat regular basis, like if you live in an area that constantly has hurricane damage. You might be able to prepare yourself and your home for the ensuing storm by protecting the most vulnerable areas like your doors and windows. T  read more..

Wet Carpet From Toilet Leak

Open all windows for 3 to 5 minutes to ventilate the home and remove stale air without cooling down the house. This should be done in the morning and the evening, if possible. Discontinue the use of humidifiers in all rooms, Water Damage Wet Carpet From Toilet Leak especially in the participant's bedroom. 

  read more..

How To Restore Furniture From Smoke Damage

A review is presented of the state of the art of smoke production measurement, prediction of smoke impact as part of computer-based fire modeling, and measurement and prediction of the impact of smoke through deposition of soot on and Smoke Damage How To Restore Furniture From Smoke Damage corrosion of electrical equipment. 
  read more..

Animal Hoarders

BEHIND CLOSED DOORS: THE HORRORS OF ANIMAL HOARDERS By Rebecca Simmons To someone desperate to find a home for a litter of kittens, the Chubbers Animal Rescue would have appeared to be the perfect haven. Nestled in a wooded lot in Caroline County, Maryland, the former home of Linda Farve and Ernie M  read more..

WATER DAMAGE AND MOLD FROM FLOOD RESPONSE

WATER DAMAGE AND MOLD FROM FLOOD RESPONSE FLOOD RESPONSE - WATER DAMAGE AND MOLD HOW DO I PROPERLY CLEAN UP MY HOME IF IT HAS BEEN FLOODED OR HAS WATER DAMAGE? First, Water Damage WATER DAMAGE AND MOLD FROM FLOOD RESPONSE make sure electricity and natural gas or propane tanks are shut down. 

The Centers fo  read more..