Wind Damage >> Recovering Hurricane Katrina

Attachment of Brick Veneer in High-Wind Regions Hurricane Katrina Recovery Advisory FEMA December 2005 Purpose: To recommend practices for installing brick veneer that will enhance wind resistance in high-wind areas. Key Issues. Brick veneer is frequently blown off Recovering Hurricane Katrina walls of residential and commercial buildings (Figure 1). 

When brick veneer fails, wind-driven water can enter and damage buildings, and building occupants can be vulnerable to injury from windborne debris (particularly if walls are sheathed with plastic foam insulation or Recovering Hurricane Katrina wood fiberboard in lieu of wood panels). Pedestrians in the vicinity of damaged walls can also be vulnerable to injury from falling veneer (Figure 2). 

Figure 1. Failed brick veneer. Plastic foam wall sheathing was Recovering Hurricane Katrina installed over the wood studs (plywood was temporarily installed after the brick failure). Figure 2. The upper portion of the brick veneer at this apartment building collapsed. 

Pedestrian and vehicular traffic in the vicinity of the damaged wall were vulnerable to injury and Recovering Hurricane Katrina damage if remaining portions of the wall were to collapse during subsequent storms. 

Common failure modes include tie (anchor) fastener pull-out (Figure 3), failure of masons to embed ties into the mortar (Figure 4), poor bonding between ties and Recovering Hurricane Katrina mortar and mortar of poor quality (Figure 5), and tie corrosion (Figure 6). Figure 3. This tie remained embedded in the mortar joint while the smooth-shank nail pulled from the stud. 

These four ties were never embedded into the mortar joint. Figure 5. This tie was embedded in the mortar, but the bond was poor. Figure 6. There were several ties in this portion of the wall, Recovering Hurricane Katrina but they failed due to severe corrosion. Ties are often installed before brick laying begins. When this is done, ties are often improperly placed above or below the mortar joints. 

When misaligned, the ties must be angled up or down in order for the ties to be embedded into the mortar joints (Figure 7). Misalignment not only reduces embedment depth but also reduces the effectiveness of the ties because Recovering Hurricane Katrina wind forces do not act parallel to the ties themselves. Figure 7. Misalignment of the tie reduces the embedment and promotes veneer failure. 

Corrugated ties typically used in residential veneer construction provide little resistance to compressive loads. Use of compression struts would likely be beneficial, Recovering Hurricane Katrina but off-the-shelf devices do not currently exist. Two-piece adjustable ties (Figure 8) provide significantly greater compressive strength than corrugated ties. 

Figure 8. Examples of two-piece adjustable ties, one showing base and vee anchor and the other showing eye and Recovering Hurricane Katrina pintle anchor Many buildings that exhibited damaged veneer were not in compliance with current building codes. Building code requirements for brick veneer have changed over the years. 

Model codes prior to 1995 permitted brick veneer in any location, Recovering Hurricane Katrina with no wind speed restrictions. Wall area per tie in some model codes was greater than the current maximum. 

The current masonry code referenced in model building codes, Building Code Requirements for Masonry Structures, ACI 530/ASCE 5/TMS 402 (ACI 530) addresses brick veneer in two manners: Recovering Hurricane Katrina rational design and prescriptive requirements. Essentially all brick veneer in residential and low-rise construction follows the prescriptive requirements. 

The first edition of American Concrete Institute’s (ACI’s) 530 limited the use of prescriptive design to areas with a basic wind speed of 110 mph or less. The 2005 edition of ACI 530 extended the prescriptive requirements to include a basic wind speed of 130 mph, Recovering Hurricane Katrina with lower area per tie limits. 

In locations with a basic wind speed above 130 mph, the rational design approach must be used. Compliance with ACI 530-05 should reduce wind damage. The following Brick Industry Association (BIA) Technical Notes Recovering Hurricane Katrina provide guidance on brick veneer: Technical Notes 28 – Anchored Brick Veneer, Wood Frame Construction, Technical Notes.

Brick Veneer/Steel Stud Walls, and Technical Notes 44B – Wall Ties (available online at www.bia.org). These Technical Notes provide attachment recommendations, Recovering Hurricane Katrina but the recommendations are not specific for high-wind regions and are, therefore, inadequate. Construction Guidance The brick veneer wall system is complex in its behavior. 

There are limited test data on which to draw. The following guidance is based on professional judgment, wind loads specified in ASCE 7-02 "Design Loads for Buildings and Recovering Hurricane Katrina Other Structures,” fastener strengths specified in the American Forest and Paper Association’s (AF&PA’s) National Design Specification for Wood Construction, and brick veneer standards contained in ACI 530-05. 

In addition to the general guidance given in BIA Technical Notes 28 and 28B, the following are recommended: Note: In areas that are also susceptible to high seismic loads, brick veneer should be evaluated by an engineer to ensure it can resist seismic and Recovering Hurricane Katrina wind design loads. Stud Spacing: For new construction, space studs 16" on center, so that ties can be anchored at this spacing. 

Tie Fasteners: Ring-shank nails are recommended in lieu of smooth-shank nails. A minimum embedment of 2" is suggested. Ties: For use with wood studs: two-piece adjustable ties are recommended. However, Recovering Hurricane Katrina where corrugated steel ties are used, use 22-gauge minimum, 7/8" wide by 6" long, complying with ASTM A 366 with a zinc coating complying with ASTM.

A 153 Class B2. For ties for use with steel studs, see BIA "Technical Notes 28B – Brick Veneer/Steel Stud Walls.” Stainless steel ties should be used in areas within 3,000 feet of the coast. Tie Installation Install ties as the brick is laid so that the ties are properly aligned with Recovering Hurricane Katrina the mortar joints. Install brick ties spaced per Table 1. 

Studs should be installed at 16" spacing. Veneer tie locations for 24" stud spacing are included for repairing damaged veneer on existing buildings with the wider stud spacing. Locate ties within 8" of door and Recovering Hurricane Katrina window openings and within 12" of the top of veneer sections. Bend the ties at a 90-degree angle at the nail head in order to minimize tie flexing when the ties are loaded in tension or compression (Figure 9). Figure 9. 

Bend ties at nail heads Embed ties in joints so that mortar completely encapsulates the ties. Embed a minimum of 1.5" into the bed joint, Recovering Hurricane Katrina with a minimum mortar cover of 5/8" to the outside face of the wall (Figure 10). Figure 10. Tie embedment [Begin table]

Flood Water Extraction And Mold Cleanup

Molds are microscopic organisms found everywhere in the environment, indoors and outdoors. When present in large quantities,Flood Damage Flood Water Extraction And Mold Cleanup  molds have the potential to cause adverse health effects. 

Health Effects of Mold Exposure Sneezing Cough and congestion Runny   read more..

Water Damage

In the case of a severe storm like a tornado or hurricane, the relentless pounding of the wind can cause Emergency Board up Water Damage sometimes allowing the water to come in, through either a broken window, a splintered door or maybe some roof damage. Being proactive and planning ahead by the use of installing plywo  read more..

Know If A Radon Mitigation System Is Working

Administrative Procedures for Mail-In Tests After EPA accepts an Application for a mail-in device, the applicant will be scheduled for his or her device performance test. The RQAC will send a notice to the applicant requesting the appropriate device(s) prior to the performance test date. Applicant f  read more..

The Tenant Who Leaves Trash Behind

If circumstances change Once the tenant and the landlord make a rental agreement, the tenant may NOT have the right to get back full deposits or prepaid rent if he or she decides not to move in.In a month-to-month tenancy, the tenant is responsible for as much as one month's rent, or Tenant Move Out Cleanup The Tenant Who Leaves Trash Behind   read more..

Structural Drying

Convalescent heat substitute is a worldwide skill appropriate to vapor-density, direct-growth, and cooled-water air-handling-unit (AHU) coils; heat-driven desiccant Dehumidification Structural Drying equipment; dehumidifiers; supermarket, ice-rink, and natatorium air-conditioning and dehumidification systems; and bundled   read more..

Chemicals Used In Meth Labs

Another meth cooking method that is not that common, but can be found is the Amalgam or P2P method,which primarily uses phenyl-2-propanone (P2P) and methylamine along with lead acetate and mercuricchloride. Other chemicals used in this method include Meth Lab Cleanup Chemicals Used In Meth Labs aluminum, hydrochloric acid, isopropyl   read more..

Water Extration Equipment For Roof Leaks

Does the State have a list of professional mold contractors?New York does not certify or license building contractors, Water Extraction Water Extration Equipment For Roof Leaks including mold contractors. 

If youhire a contractor to work on your flooded home and your home was built before 1978, checkwhether t  read more..

Grants For Flood Damage Tree Removal

By the end of the program, the city had recycled almost 56 percent of all materials collected since the day of the earthquake for less than the cost of disposal. The city demonstrated that when sufficient recycling facility capacity exists, a recycling rate of over 86 percent can be achieved. T  read more..

Water Restoration

I have worked as a Crime Scene Cleanup Water Restoration technician for many years, 19 to be exact and in all of the years that I've been doing this the crime scene cleanup jobs are by far the most interesting. Some people ask me how I can handle going into a gruesome environment, dealing with some of the grossest situations   read more..

Servpro

Name of Product: Notus air movers/blowers Units: About 24,000 Manufacturer: EDIC, of Los Angeles, Calif. Hazard: The air mover/blower's internal electrical capacitor can fail and overheat, posing a fire hazard. Incidents/Injuries: Fire Damage Servpro has received four reports of overheating incidents with the reca  read more..