Asbestos Abatement >> Asbestos Pipe Insulation Removal

In February 2001 the. Environmental Protection Agency, as part of a national evaluation of facilities that received ore from the mine in Libby, Montana, collected surface soil, air, and Asbestos Pipe Insulation Removal surface dust samples from this. W.R. Grace Phoenix facility in Phoenix. 

EPA collected 14 soil samples (including one duplicate), 6 microvacuum dust samples (plus two blanks), and 4 ambient air samples (plus two blanks). Four bulk samples of suspect vermiculite-containing materials were also collected (EPA 2001). The Asbestos Pipe Insulation Removal results of the 2001 investigation are contained in Tables 1–4. 

Table 1 shows six Asbestos Pipe Insulation Removal composite microvacuum dust samples that were collected from horizontal surfaces within the on-site buildings. Appendix A, Figure 2 shows the sample locations. Samples were collected in the Office Building, Production Building, and Warehouse. 

Microvacuum dust samples were collected by drawing air through a mixed cellulose ester (MCE) filter (0.45 micrometer (µm) pore size) at a flow rate of 2.0 liters per minute (L/min.) for 2 minutes at each sampling location. The Asbestos Pipe Insulation Removal sampling was performed using battery-operated sampling pumps. 

To obtain a more representative dust sample, personnel vacuumed three separate 100-square centimeter (cm2 ) Asbestos Pipe Insulation Removal sampling areas per sampling cassette. Samples were analyzed by transmission electron microscopy (TEM) by the International Standards Organization (ISO) Method 10312. 

Two of the Asbestos Pipe Insulation Removal samples were rejected by the laboratory because of damage to the cassettes during shipping (e.g., the plastic seal caps fell off the ends of each cassette). Three of the remaining microvacuum samples were found to contain asbestos. Fourteen samples were collected at 13 locations at unpaved portions of the site (Table 2). 

Sample locations are shown in Appendix A, Figure 3. All of the soil samples were grab samples and Asbestos Pipe Insulation Removal were collected from approximately the top 3 inches of soil using a stainless steel scoop. Soil samples were analyzed using polarized light microscopy (PLM) in accordance with National Institute for Occupational Safety and Health (NIOSH) Method 9002. 

Sample results are reported as tremolite-actinolite to indicate the presence of Libby asbestos. Of the 14 soil samples, Asbestos Pipe Insulation Removal a maximum of 2 percent tremolite/actinolite asbestos was detected in a sample taken along the railroad tracks at the site’s western perimeter. 

In addition, 1 percent chrysotile and Asbestos Pipe Insulation Removal a trace amount of tremolite/actinolite asbestos were detected in a sample that was also collected at the railroad tracks. For the remaining 12 soil samples, a trace amount (i.e., less than 1 percent by visual estimate) of tremolite/actinolite asbestos was detected in each sample. 

A trace amount of chrysotile asbestos was also detected in 3 of the 12 soil samples. The three samples containing trace amounts of chrysotile were collected from unpaved areas along the eastern perimeters of the site and Asbestos Pipe Insulation Removal near the railroad tracks adjacent to the western perimeter. Tables 3 and 4 show the analytic results of the four air samples. 

These samples were collected in the office building, the production building, and Asbestos Pipe Insulation Removal the warehouse. These samples were collected while routine operations were occurring at the site. No deliberate attempt was made to stir up residual contamination;, therefore, these were not aggressive samples. 

Air samples were analyzed by ISO Method 10312: a TEM method that determines the types of asbestos fibers present, Asbestos Pipe Insulation Removal as well as the lengths, widths, and aspect ratios of the asbestos structures. Asbestos structures were detected in one of the four ambient air samples. 

This sample was collected between the exfoliation ovens and Asbestos Pipe Insulation Removal was found to contain 0.0107 s/cc of amphibole asbestos (tremolite-actinolite). The site investigation at the W.R. Grace Phoenix plant is part of ATSDR’s national effort to identify and evaluate potential asbestos exposures that may have occurred at sites where vermiculite mined in Libby, Montana was processed. 

This effort is known as the National Asbestos Exposure Review (NAER). The findings of studies conducted at Libby linked asbestos exposure with several health effects (ATSDR 2002; Peipins et al. 2003) and Asbestos Pipe Insulation Removal led to the current investigation of Libby-vermiculite processing sites, including the W.R. Grace Phoenix facility. 

Significantly, however, Asbestos Pipe Insulation Removal the asbestos exposures documented in the Libby community are in many ways unique to that community. Exposures in Libby include factors that will not be present as a group at other sites where Libby vermiculite was processed or handled. 

Asbestos Overview Asbestos is a general name applied to a group of silicate minerals consisting of thin, Asbestos Pipe Insulation Removal separable fibers in a parallel arrangement. Asbestos minerals fall into two classes: serpentine and amphibole. Serpentine or chrysotile asbestos has relatively long and flexible crystalline fibers; it is the predominant type of asbestos used commercially. 

Amphibole asbestos minerals are brittle and Asbestos Pipe Insulation Removal have a rod- or needle-like shape. Amphibole minerals regulated as asbestos by EPA and OSHA include five classes: • fibrous tremolite, • actinolite, • anthophyllite, • crocidolite, and • amosite. 

Other amphibole minerals such as winchite and richterite can, however, Asbestos Pipe Insulation Removal exhibit fibrous asbestiform properties (ATSDR 2001). Asbestos fibers do not have any detectable odor or taste. They do not dissolve in water or evaporate, and they are resistant to heat, fire, and chemical and biological degradation. 

The vermiculite mined at Libby contains amphibole asbestos, with a characteristic composition including tremolite, actinolite, richterite, and winchite; Asbestos Pipe Insulation Removal this material will be referred to as Libby asbestos. The raw vermiculite ore was estimated to contain up to 26% Libby asbestos as it was mined (MRI 1982). 

For most of the mine’s operation, Asbestos Pipe Insulation Removal Libby asbestos was considered a byproduct of little value and was not used commercially. The mined vermiculite ore was processed to remove unwanted materials and then sorted into various grades or sizes of vermiculite that were then shipped to sites across the nation for expansion (exfoliation) or use as a raw material in manufactured products. 

Samples of the various grades of unexpanded vermiculite shipped from the Libby mine contained 0.3%–7% fibrous tremolite-actinolite (by mass) (MRI 1982). The following sections provide an overview of several concepts relevant to the evaluation of asbestos exposure, including analytical techniques, toxicity and health effects, and Asbestos Pipe Insulation Removal the current regulations concerning asbestos in the environment. 

A more detailed discussion of these topics will also be provided in Asbestos Pipe Insulation Removal ATSDR’s upcoming summary report for the national review of vermiculite sites.

How To Clean Up Raw Sewage In A Basement

Water from precipitation is not always the only source Basement Drying How To Clean Up Raw Sewage In A Basement of moisture. Urban development usually includes a centralized public water supply for the development. If the supply were through private domestic wells, then waterline leaks would be easy to identify. Simply turn off all the fauc  read more..

How Painting Pros Deal With Lead Paint

Task-specific exposure monitoring consisted of 30-min samples each measuring the exposure associated with work on one visually uniform paint surface, using one specific surface preparation work method. Task-specific exposure monitoring of exposures to construction workers allows mo  read more..

How To Clean Up A Flooded Crawl Space

The treatment needed for these fungi is to trace the fungus back to its source of moisture, usually the ground, and cut off the connection. Often it comes up through a brace, frame, wooden concrete form, or grade stake that serves as a bridge to let the fungus grow from moist soil to a joist or sill  read more..

Structural Drying Wet Carpet

To avoid wind and windborne debris damage to rooftop ductwork, it is recommended that ductwork not be installed on the roof (see Figure 5). If ductwork is installed on the roof, it is recommended that the gauge of the ducts and their attachment be sufficient to resist the design wind loads. Figure 5  read more..

Grants For Hurricane Damage Tree Removal

Metro-Dade County used different communications strategies for each stage of the debris management effort. In the days following the hurricane, city officials gave about 10 television and radio interviews each day, in which they asked residents to carry their garbage to the nearest cleared stre  read more..

How To Remove Ice Storm Damage Debris In An Emerge

A monitor (usually located in a monitoring observation tower at the debris management site) assesses what percentage of the truck's volume is full of debris. This percentage is then multiplied by the truck's declared maximum volume (as previously certified and announced on a placard on the side of t  read more..

Water Damage Carpet Cleaning Techniques

External and internal surveys were done to help assess Ohio's science needs. External surveys consisted of a written questionnaire sent to agency personnel who partner Water Extraction Water Damage Carpet Cleaning Techniques or otherwise collaborate (or have the potential to collaborate) with the USGS Ohio Water Science Center; in some case  read more..

How To Clean Smoke Damage From Walls And Fixtures

The total amount of a given species released by a fire is thus dependent on the fuel consumed.This is most typically specified as a user input based on a combination of the burning object's heat release rate, mass loss rate, and heat of combustion (Hc) related as ܳ. The discussion above is ess  read more..

Remove Lead Paint With Dust Control

The employer must also inform you that the standard requires temporary medical removal with economic protection when your PbB exceeds certain criteria (See Discussion of Medical Removal Protection). During the first year of the standard, this removal criterion is 80 µg/100 g. Anytime your PbB excee  read more..

Radon Gas

What is Radon gas? Radon gas is a gas produced by the radioactive decay of the element radium. Radioactive decay is a natural, spontaneous process in which an atom of one element decays or breaks down to form another element by losing atomic particles (protons, neutrons, or electrons). When solid ra  read more..