In February 2001 the. Environmental Protection Agency, as part of a national evaluation of facilities that received ore from the mine in Libby, Montana, collected surface soil, air, and Asbestos Pipe Insulation Removal surface dust samples from this. W.R. Grace Phoenix facility in Phoenix. 

EPA collected 14 soil samples (including one duplicate), 6 microvacuum dust samples (plus two blanks), and 4 ambient air samples (plus two blanks). Four bulk samples of suspect vermiculite-containing materials were also collected (EPA 2001). The Asbestos Pipe Insulation Removal results of the 2001 investigation are contained in Tables 1–4. 

Table 1 shows six Asbestos Pipe Insulation Removal composite microvacuum dust samples that were collected from horizontal surfaces within the on-site buildings. Appendix A, Figure 2 shows the sample locations. Samples were collected in the Office Building, Production Building, and Warehouse. 

Microvacuum dust samples were collected by drawing air through a mixed cellulose ester (MCE) filter (0.45 micrometer (µm) pore size) at a flow rate of 2.0 liters per minute (L/min.) for 2 minutes at each sampling location. The Asbestos Pipe Insulation Removal sampling was performed using battery-operated sampling pumps. 

To obtain a more representative dust sample, personnel vacuumed three separate 100-square centimeter (cm2 ) Asbestos Pipe Insulation Removal sampling areas per sampling cassette. Samples were analyzed by transmission electron microscopy (TEM) by the International Standards Organization (ISO) Method 10312. 

Two of the Asbestos Pipe Insulation Removal samples were rejected by the laboratory because of damage to the cassettes during shipping (e.g., the plastic seal caps fell off the ends of each cassette). Three of the remaining microvacuum samples were found to contain asbestos. Fourteen samples were collected at 13 locations at unpaved portions of the site (Table 2). 

Sample locations are shown in Appendix A, Figure 3. All of the soil samples were grab samples and Asbestos Pipe Insulation Removal were collected from approximately the top 3 inches of soil using a stainless steel scoop. Soil samples were analyzed using polarized light microscopy (PLM) in accordance with National Institute for Occupational Safety and Health (NIOSH) Method 9002. 

Sample results are reported as tremolite-actinolite to indicate the presence of Libby asbestos. Of the 14 soil samples, Asbestos Pipe Insulation Removal a maximum of 2 percent tremolite/actinolite asbestos was detected in a sample taken along the railroad tracks at the site’s western perimeter. 

In addition, 1 percent chrysotile and Asbestos Pipe Insulation Removal a trace amount of tremolite/actinolite asbestos were detected in a sample that was also collected at the railroad tracks. For the remaining 12 soil samples, a trace amount (i.e., less than 1 percent by visual estimate) of tremolite/actinolite asbestos was detected in each sample. 

A trace amount of chrysotile asbestos was also detected in 3 of the 12 soil samples. The three samples containing trace amounts of chrysotile were collected from unpaved areas along the eastern perimeters of the site and Asbestos Pipe Insulation Removal near the railroad tracks adjacent to the western perimeter. Tables 3 and 4 show the analytic results of the four air samples. 

These samples were collected in the office building, the production building, and Asbestos Pipe Insulation Removal the warehouse. These samples were collected while routine operations were occurring at the site. No deliberate attempt was made to stir up residual contamination;, therefore, these were not aggressive samples. 

Air samples were analyzed by ISO Method 10312: a TEM method that determines the types of asbestos fibers present, Asbestos Pipe Insulation Removal as well as the lengths, widths, and aspect ratios of the asbestos structures. Asbestos structures were detected in one of the four ambient air samples. 

This sample was collected between the exfoliation ovens and Asbestos Pipe Insulation Removal was found to contain 0.0107 s/cc of amphibole asbestos (tremolite-actinolite). The site investigation at the W.R. Grace Phoenix plant is part of ATSDR’s national effort to identify and evaluate potential asbestos exposures that may have occurred at sites where vermiculite mined in Libby, Montana was processed. 

This effort is known as the National Asbestos Exposure Review (NAER). The findings of studies conducted at Libby linked asbestos exposure with several health effects (ATSDR 2002; Peipins et al. 2003) and Asbestos Pipe Insulation Removal led to the current investigation of Libby-vermiculite processing sites, including the W.R. Grace Phoenix facility. 

Significantly, however, Asbestos Pipe Insulation Removal the asbestos exposures documented in the Libby community are in many ways unique to that community. Exposures in Libby include factors that will not be present as a group at other sites where Libby vermiculite was processed or handled. 

Asbestos Overview Asbestos is a general name applied to a group of silicate minerals consisting of thin, Asbestos Pipe Insulation Removal separable fibers in a parallel arrangement. Asbestos minerals fall into two classes: serpentine and amphibole. Serpentine or chrysotile asbestos has relatively long and flexible crystalline fibers; it is the predominant type of asbestos used commercially. 

Amphibole asbestos minerals are brittle and Asbestos Pipe Insulation Removal have a rod- or needle-like shape. Amphibole minerals regulated as asbestos by EPA and OSHA include five classes: • fibrous tremolite, • actinolite, • anthophyllite, • crocidolite, and • amosite. 

Other amphibole minerals such as winchite and richterite can, however, Asbestos Pipe Insulation Removal exhibit fibrous asbestiform properties (ATSDR 2001). Asbestos fibers do not have any detectable odor or taste. They do not dissolve in water or evaporate, and they are resistant to heat, fire, and chemical and biological degradation. 

The vermiculite mined at Libby contains amphibole asbestos, with a characteristic composition including tremolite, actinolite, richterite, and winchite; Asbestos Pipe Insulation Removal this material will be referred to as Libby asbestos. The raw vermiculite ore was estimated to contain up to 26% Libby asbestos as it was mined (MRI 1982). 

For most of the mine’s operation, Asbestos Pipe Insulation Removal Libby asbestos was considered a byproduct of little value and was not used commercially. The mined vermiculite ore was processed to remove unwanted materials and then sorted into various grades or sizes of vermiculite that were then shipped to sites across the nation for expansion (exfoliation) or use as a raw material in manufactured products. 

Samples of the various grades of unexpanded vermiculite shipped from the Libby mine contained 0.3%–7% fibrous tremolite-actinolite (by mass) (MRI 1982). The following sections provide an overview of several concepts relevant to the evaluation of asbestos exposure, including analytical techniques, toxicity and health effects, and Asbestos Pipe Insulation Removal the current regulations concerning asbestos in the environment. 

A more detailed discussion of these topics will also be provided in Asbestos Pipe Insulation Removal ATSDR’s upcoming summary report for the national review of vermiculite sites.

Frozen Pipe Burst Prevention

Cold Weather TipsGuard Against Cold DraftsSince most water meters and pipes are located in unheated areas, they are vulnerable when temperatures dip below freezing. Even a small draft of cold air through a cracked basement window, Water Damage Frozen Pipe Burst Prevention foundation or sill during extremely cold periods could  read more..

When To Use A Dehumidifier In Your Home

The water evaporation and condensation occurred interior the separation unit, resulting in a direct reuse of latent heat released by water condensation. The energy of the system was calculated by Dehumidification When To Use A Dehumidifier In Your Home performing energy balance with the following equation: where is the water flow rate, kg/min. G  read more..

Protect Your House From Animal Damage

Step 4. Determine if young are involved After finding the main entry you need to verify that no young are inside before proceeding with the eviction process. Because each situation and each animal is different, do this even if it seems early or late in the year for young to be present. Failing to do  read more..

Flood Water Extraction And Mold Cleanup

Molds are microscopic organisms found everywhere in the environment, indoors and outdoors. When present in large quantities,Flood Damage Flood Water Extraction And Mold Cleanup  molds have the potential to cause adverse health effects. 

Health Effects of Mold Exposure Sneezing Cough and congestion Runny   read more..

Asbestos Abatement Supplies

Joint compound used on wallboard systems often contains asbestos added during the mixing process to improve the working texture of the material. The asbestos in the joint compound is typically much less than 5 percent by weight and the joint compound makes up a minor fraction of the material in the   read more..

How To Get Hold Of Black Mold

Molds are a normal part of the environment, and are naturally present in both indoor and outdoor environments year round. molds are fungi, with thousands of known species, and there aremold of virtually every color. molds produce tiny cells or "spores" that spread throughout the air. These spores  read more..

Lead Paint Abatement

Are the employer acts pursuant to a final medical determination which permits the return of the employee to his or her former job status despite what would otherwise be an unacceptable blood lead level, later questions concerning removing the Lead Paint Removal Lead Paint Abatement employee again shall be decided by a final  read more..

Cleaning Up Water In Carpet

Daily wear and tear means that materials, furniture and furnishings require periodic replacement.Following are Sustainable Strategies to consider as you replace MATERIALS, FURNITURE AND FURNISHINGS. Refer to the Share Section for a representative project Case Study to discover key practices, benefit  read more..

Cleanup After Leaking Dishwasher

Health Effects of Exposure to Water-Damaged New Orleans Homes Six Months After Hurricanes Katrina and Rita We identified groupings using a cluster Water Damage Cleanup After Leaking Dishwasher analysis on the natural logarithm of this score. 13 From that we defined an ordinal exposure variable ("exposure to water-damaged homes")   read more..

How To Remove Residential Lead Paint

Lead test kits are products sold to consumers for use in detecting the presence of lead.Historically, test kits have been developed to detect lead-based paint as defined by the "Lead Safe Housing Rule," (24 C.F.R. Part 35). Under this rule, administered by the Department of Housing and Urban Develop  read more..