Radon Mitigation >> EPA Radon

RADON MITIGATION STANDARDS 1.0 BACKGROUND The 1988 Indoor Radon Abatement Act (IRAA) required the Environmental Protection Agency (EPA) to develop a voluntary program to evaluate and provide information on contractors who offer radon control services to homeowners. The Radon Contractor Proficiency (RCP) Program was established to fulfill this EPA Radon portion of the IRAA. 

In December 1991, EPA published "Interim Radon Mitigation Standards" as initial guidelines for evaluating the performance of radon mitigation contractors under the RCP Program. Over the past six years, EPA Radon the effectiveness of the basic radon mitigation techniques set forth in the, "Interim Standards" has been validated in field applications throughout the United States. 

This experience now serves as the basis for the more detailed and final Radon Mitigation Standards (RMS) set forth in this document. 2.0 PURPOSE The purpose of the RMS is to provide radon mitigation contractors with uniform standards that will ensure quality and effectiveness in the design, installation, and EPA Radon evaluation of radon mitigation systems in detached and attached residential buildings three stories or less in height. 

The RMS is intended to serve as a model set of requirements which can be adopted or modified by state and local jurisdictions to fulfill objectives of their specific radon contractor certification or EPA Radon licensure programs. PARTICIPANTS Minimum requirements are established in the RMS for individuals nationwide who perform radon remediation work and wish to participate in the RCP Program. 

To participate in EPA's RCP Program, the mitigation contractor shall have completed all RCP training and examination requirements, be listed in the current RCP Listing Report, and EPA Radon shall agree to follow the provisions of the RMS. 4.0 SCOPE The requirements addressed in the RMS include the following categories of contractor activity: 

General Practices, Building Investigation, Worker Health and Safety, Systems Design, Systems Installation, Materials, Monitors and Labeling, Post-Mitigation Testing, and Contracts and EPA Radon Documentation. ASSUMPTION Before applying the provisions of the RMS, it is assumed that appropriate radon/radon decay product measurements have been performed within the structure, and that the owner has decided that radon remediation is necessary. 

IMPLEMENTATION 6.1 The RMS includes requirements for installation of radon remediation systems and provides a basis for evaluating the quality of those installations. It may be adopted by state EPA Radon regulatory agencies for state or local radon mitigation contractor licensure programs. It may also be used as a reference during inspection of in-progress or completed radon mitigation work. 

Contractors shall personally conduct follow-up inspection of any radon mitigation systems installed by their firm or by subcontractors to insure conformance with the EPA Radon requirements of the RMS. This requirement shall include the post-mitigation testing prescribed in paragraph 17.0. 6.3 EPA will evaluate reports of non- compliance with the RMS that are referred to the Agency by states and other agencies that monitor radon mitigation services. 

Based on its evaluation, EPA may initiate established RCP program de-listing procedures against contractors that the Agency or States (with certification programs) find are in violation of the mandatory EPA Radon provisions of the RMS (See paragraph 6.4). In addition, EPA or its agent may conduct inspections of radon mitigation projects. 

State radon program personnel or their contracted representatives are considered EPA agents for conducting such inspections. 6.4 Those EPA Radon provisions of the RMS that are considered to be mandatory are prefaced by the term "shall." Provisions that are considered good practice but which are not mandatory are prefaced by the terms "should" or "recommended." 6.5 

The RMS will be updated as necessary, and in response to technological advances and field experience. 7.0 LIMITATIONS 7.1 Although the provisions of the RMS have been carefully reviewed for potential conflicts with other regulatory requirements, EPA Radon adherence to the RMS does not guarantee compliance with the applicable codes or regulations of any other Federal, state, or local agency having jurisdiction. 

Where discrepancies exist between provisions of the RMS and local codes or regulations, local codes shall take precedence. However, EPA Radon where compliance with local codes necessitates a deviation from the RMS, EPA recommends that RCP listed contractors report the deviation in writing to the appropriate EPA Regional Office and the appropriate state regulatory official within 30 days. 

It should be noted that EPA is not requiring the EPA Radon reporting that is recommended in this paragraph. States with radon contractor certification programs may require that contractors give prior notification of their intent to deviate from the RMS for research or other purposes.

Storm Damage Roof Insurance Claim

Special hazards posed by derechos in urban areas Whether in an urban or rural area, those out-of-doors are at greatest risk of being killed or injured in a derecho. But of particular significance in urban areas is the vulnerability of electrical lines to high winds and Wind Damage Storm Damage Roof Insurance Claim falling trees.&  read more..

Sick Building Syndrome

Psychological factors Excessive work stress or dissatisfaction, poor interpersonal relationships and poor communication are often seen to be associated with SBS. Poor and inappropriate lighting with absence of sunlight, bad acoustics, poor ergonomics Radon Mitigation Sick Building Syndrome and humidity may also contribute t  read more..

How To Remove Fire Smoke Smell From Apartment

Proper selection of PPE for individual responders must be based upon a careful assessment of two factors: (1) the hazards anticipated to be present, or are present at the scene and (2) the probable impact of those hazards, based upon the mission role of the individual. The emergency responder must b  read more..

Tenant Move Out

So, any relation between narrow rates, such as those in the normal, and any principal level of tolerance has been unclear. It is significant that some air unceasingly enters buildings through unseen openings, like doors and windows. Such penetration raises the actual aeration rate by a slight, bu  read more..

Sewage Backup

There is nothing worse than to come home and find out that there's a Basement Drying Sewage Backup, when he left the house you started a load of laundry, now when you returned, you found out that your main sewer line is backed up and all the water that came from your washing machine flooded your basement. Not only is   read more..

Mold Is Growing On The Soil In A Crawl Space

MOLD AND MOISTURE PROBLEMS IN CRAWLSPACES Introduction Some houses in Idaho and across the country have problems with standing water or moisture in the crawlspace, providing a perfect environment for mold growth and Crawl Space Drying Mold Is Growing On The Soil In A Crawl Space other moisture problems. 

For  read more..

How To Paint Over Fire Damage On Drywall

The president of NFPA (National Fire Protection Association) today called for all nursing homes in the U.S. to be equipped with fire sprinklers, in the wake of two recent nursing home fires in Hartford and Nashville, Fire Damage How To Paint Over Fire Damage On Drywall where a total of 24 people died. (See NFPA's fact sheet on nursing home fire s  read more..

How To Fix Water Damaged Carpet

In handling materials that are believed to be contaminated with asbestos it is recommended that, at a minimum, you wear personal protective equipment such as disposable coveralls, gloves, goggles, and most importantly, some form of respiratory protection. A basic dust mask or the N95 dust mask recom  read more..

The Primary Purpose Of Perimeter Security

Banana, coffee, yucca, and corn crops sustained serious damage across the country, and about 4,000 metric tons of foodstuffs were lost due to damage to storage facilities. Roadways sustained major damage across the island. In Ciego de Avila, the 24-km causeway linking mainland Cuba with the smaller   read more..

How To Start A Debris Removal Business

The Grantee will provide funds to the Subgrantee in accordance with Federal and State requirements. The Grantee will ensure that Subgrantees understand and adhere to Federal procurement requirements as well as other requirements of 44 CFR Part 13, 2 CFR Part 215, and the appropriate Office of Manage  read more..