RADON MITIGATION STANDARDS 1.0 BACKGROUND The 1988 Indoor Radon Abatement Act (IRAA) required the Environmental Protection Agency (EPA) to develop a voluntary program to evaluate and provide information on contractors who offer radon control services to homeowners. The Radon Contractor Proficiency (RCP) Program was established to fulfill this EPA Radon portion of the IRAA. 

In December 1991, EPA published "Interim Radon Mitigation Standards" as initial guidelines for evaluating the performance of radon mitigation contractors under the RCP Program. Over the past six years, EPA Radon the effectiveness of the basic radon mitigation techniques set forth in the, "Interim Standards" has been validated in field applications throughout the United States. 

This experience now serves as the basis for the more detailed and final Radon Mitigation Standards (RMS) set forth in this document. 2.0 PURPOSE The purpose of the RMS is to provide radon mitigation contractors with uniform standards that will ensure quality and effectiveness in the design, installation, and EPA Radon evaluation of radon mitigation systems in detached and attached residential buildings three stories or less in height. 

The RMS is intended to serve as a model set of requirements which can be adopted or modified by state and local jurisdictions to fulfill objectives of their specific radon contractor certification or EPA Radon licensure programs. PARTICIPANTS Minimum requirements are established in the RMS for individuals nationwide who perform radon remediation work and wish to participate in the RCP Program. 

To participate in EPA's RCP Program, the mitigation contractor shall have completed all RCP training and examination requirements, be listed in the current RCP Listing Report, and EPA Radon shall agree to follow the provisions of the RMS. 4.0 SCOPE The requirements addressed in the RMS include the following categories of contractor activity: 

General Practices, Building Investigation, Worker Health and Safety, Systems Design, Systems Installation, Materials, Monitors and Labeling, Post-Mitigation Testing, and Contracts and EPA Radon Documentation. ASSUMPTION Before applying the provisions of the RMS, it is assumed that appropriate radon/radon decay product measurements have been performed within the structure, and that the owner has decided that radon remediation is necessary. 

IMPLEMENTATION 6.1 The RMS includes requirements for installation of radon remediation systems and provides a basis for evaluating the quality of those installations. It may be adopted by state EPA Radon regulatory agencies for state or local radon mitigation contractor licensure programs. It may also be used as a reference during inspection of in-progress or completed radon mitigation work. 

Contractors shall personally conduct follow-up inspection of any radon mitigation systems installed by their firm or by subcontractors to insure conformance with the EPA Radon requirements of the RMS. This requirement shall include the post-mitigation testing prescribed in paragraph 17.0. 6.3 EPA will evaluate reports of non- compliance with the RMS that are referred to the Agency by states and other agencies that monitor radon mitigation services. 

Based on its evaluation, EPA may initiate established RCP program de-listing procedures against contractors that the Agency or States (with certification programs) find are in violation of the mandatory EPA Radon provisions of the RMS (See paragraph 6.4). In addition, EPA or its agent may conduct inspections of radon mitigation projects. 

State radon program personnel or their contracted representatives are considered EPA agents for conducting such inspections. 6.4 Those EPA Radon provisions of the RMS that are considered to be mandatory are prefaced by the term "shall." Provisions that are considered good practice but which are not mandatory are prefaced by the terms "should" or "recommended." 6.5 

The RMS will be updated as necessary, and in response to technological advances and field experience. 7.0 LIMITATIONS 7.1 Although the provisions of the RMS have been carefully reviewed for potential conflicts with other regulatory requirements, EPA Radon adherence to the RMS does not guarantee compliance with the applicable codes or regulations of any other Federal, state, or local agency having jurisdiction. 

Where discrepancies exist between provisions of the RMS and local codes or regulations, local codes shall take precedence. However, EPA Radon where compliance with local codes necessitates a deviation from the RMS, EPA recommends that RCP listed contractors report the deviation in writing to the appropriate EPA Regional Office and the appropriate state regulatory official within 30 days. 

It should be noted that EPA is not requiring the EPA Radon reporting that is recommended in this paragraph. States with radon contractor certification programs may require that contractors give prior notification of their intent to deviate from the RMS for research or other purposes.

How To Clean Smoke From Walls And Floors After Grease Fires

After the 1974 electronic system fire in Poitiers France, CNET developed what is considered the first modern test of corrosivity [70]. A number of other standards have since been developed that utilize a variety of fire and exposure models as well as several different methods of reporting results. T  read more..

Lead Paint Poisoning

Lead serves no useful purpose in the body and it can cause serious and permanent health problems. How Does Lead Enter the Body? Lead enters the body by being inhaled or swallowed. Lead can be inhaled when lead dust, mist, or fumes ("smoke") are in the air. Particles of lead can be swallowed if lead   read more..

Small Contractors And Lead Paint

Small contractors are an especially difficult audience to reach with a safety message, and yet there are thousands of them across the United States who, on a daily basis, direct thousands of employees in their work. Most construction companies are small, and the way in which health and safety practi  read more..

Water Extraction From Carpet After Pipe Breaks

In addition to the decline in land-surface altitude,the loss of marshes and barrier islands that dampen storm surge and waves during hurricanes increases the risks of flood disaster in New Orleans Water Extraction Water Extraction From Carpet After Pipe Breaks and vicinity.

Since 1940, approximately 1 million acres of c  read more..

Wind Damage To Plants

DERECHO FACTS PAGE... Note: Some of the following information, in abbreviated, question-and-answer format, is available in The Derecho FAQ. INTRODUCTION Definition of a derecho A derecho (pronounced similar to "deh-REY-cho" in English, or pronounced phonetically as " ") is a widespread, Wind Damage Wind Damage To Plants&nb  read more..

Asbestos Removal Specifications In Tennessee

Counting Fibers (1) Place the prepared sample slide on the mechanical stage of the microscope. Position the center of the wedge under the objective lens and focus upon the sample. (2) Start counting from one end of the wedge and Asbestos Abatement Asbestos Removal Specifications In Tennessee progress along a radial line to the other end (c  read more..

Start A Crime Scene Cleanup And Decontamination Co

The residual chemicals and contents can easily injure an individual cleaning a former CML. TDEC highly recommendsthat only Meth Lab Cleanup Start A Crime Scene Cleanup And Decontamination Co trained professionals perform cleanups. The physical and chemical hazards are sometimes hidden. Chemicalspresent in CML residues are sometimes incompatible with c  read more..

Mold Remediation

When your building is contaminated with sewage backing up from the septic lines, or some kind of flooding in your building occurs that involves sewage, as in the case of river flooding, a serious threat to the human health exists. Without the appropriate action, extensive Sewage Cleanup Mold Remediation damage to your   read more..

Odor Control

An full scale epidemic of small-scale clandestine methamphetamine labs is creating a new Meth Lab Cleanup Odor Control hazard for all first responders, which includes all law enforcement officers, fire fighters, and other emergency medical workers. Meth could be made in any place and at any possible time. The stuff i  read more..

How To Contract FEMA For Debris Removal

The alternative procedures authorized under the law pertain to debris removal (emergency work)and repair, restoration, and replacement of disaster-damaged public and private non profit facilities(permanent work). This guide outlines the alternative Debris Removal How To Contract FEMA For Debris Removal procedures for debris removal o  read more..