Radon Mitigation >> Radon Transform

RADON TRANSFORM MITIGATION STANDARDS 1.0 BACKGROUND The 1988 Indoor Radon transform Abatement Act (IRAA) required the Environmental Protection Agency (EPA) to develop a voluntary program to evaluate and provide information on contractors who offer radon transform Radon Transform control services to homeowners. 

The Radon transform Contractor Proficiency (RCP) Program was established to fulfill this portion of the IRAA. In December 1991, EPA published "Interim Radon transform Mitigation Standards" as initial guidelines for evaluating the Radon Transform performance of radon transform mitigation contractors under the RCP Program. 

Over the past six years, Radon Transform the effectiveness of the basic radon transform mitigation techniques set forth in the, "Interim Standards" has been validated in field applications throughout the United States. This experience now serves as the basis for the more detailed and final Radon transform Mitigation Standards (RMS) set forth in this document. 

PURPOSE The purpose of the RMS is to provide radon transform mitigation contractors with uniform standards that will ensure quality and effectiveness in the design, installation, and evaluation of radon transform mitigation systems in detached and Radon Transform attached residential buildings three stories or less in height. The RMS is intended to serve as a model set of requirements which can be adopted or modified by state and local jurisdictions to fulfill objectives of their specific radon transform contractor certification or licensure programs. 

PARTICIPANTS Minimum requirements are established in the RMS for individuals nationwide who perform radon transform remediation work and wish to participate in the RCP Program. To participate in EPA's RCP Program, Radon Transform the mitigation contractor shall have completed all RCP training and examination requirements, be listed in the current RCP Listing Report, and shall agree to follow the provisions of the RMS. 

SCOPE The Radon Transform requirements addressed in the RMS include the following categories of contractor activity: General Practices, Building Investigation, Worker Health and Safety, Systems Design, Systems Installation, Materials, Monitors and Labeling, Post-Mitigation Testing, and Contracts and Documentation. 

ASSUMPTION Before applying the provisions of the RMS, Radon Transform it is assumed that appropriate radon transform/radon transform decay product measurements have been performed within the structure, and that the owner has decided that radon transform remediation is necessary. 

IMPLEMENTATION 6.1 The RMS includes requirements for installation of radon transform remediation systems and provides a basis for evaluating the quality of those installations. It may be adopted by state regulatory agencies for state or local radon transform mitigation contractor licensure Radon Transform programs. It may also be used as a reference during inspection of in-progress or completed radon transform mitigation work. 

Contractors shall personally conduct follow-up inspection of any radon transform mitigation systems installed by their firm or Radon Transform by subcontractors to insure conformance with the requirements of the RMS. This requirement shall include the post-mitigation testing prescribed in paragraph 17.0. 6.3 EPA will evaluate reports of non- compliance with the RMS that are referred to the Agency by states and other agencies that monitor radon transform mitigation services. 

Based on its evaluation, EPA may initiate established RCP program delisting procedures against contractors that the Agency or States (with certification programs) find are in violation of the mandatory provisions of the RMS (See paragraph 6.4). In addition, Radon Transform EPA or its agent may conduct inspections of radon transform mitigation projects. 

State radon transform program personnel or Radon Transform their contracted representatives are considered EPA agents for conducting such inspections. Those provisions of the RMS that are considered to be mandatory are prefaced by the term "shall." Provisions that are considered good practice but which are not mandatory are prefaced by the terms "should" or "recommended." 

The RMS will be updated as necessary, and in response to technological advances and field experience. LIMITATIONS Although the provisions of the RMS have been carefully reviewed for potential conflicts with other regulatory requirements, Radon Transform adherence to the RMS does not guarantee compliance with the applicable codes or regulations of any other Federal, state, or local agency having jurisdiction. 

Where discrepancies exist between provisions of the RMS and local codes or regulations, local codes shall take precedence. However, Radon Transform where compliance with local codes necessitates a deviation from the RMS, EPA recommends that RCP listed contractors report the deviation in writing to the appropriate EPA Regional Office and the appropriate state regulatory official within 30 days. 

It should be noted that EPA is not requiring the reporting Radon Transform that is recommended in this paragraph. States with radon transform contractor certification programs may require that contractors give prior notification of their intent to deviate from the RMS for research or other purposes.

How To Restore Flood Damaged Archive Photos

To create a collection, to inherit one, or to be given oversight of a collection, is also to create, inherit or accept a great responsibility. The challenge for collecting institutions is to meet the charge of stewardship and to assure that their valued collections, whether works of art, historical   read more..

Recovering Hurricane Katrina

Attachment of Brick Veneer in High-Wind Regions Hurricane Katrina Recovery Advisory FEMA December 2005 Purpose: To recommend practices for installing brick veneer that will enhance wind resistance in high-wind areas. Key Issues. Brick veneer is frequently blown off Wind Damage Recovering Hurricane Katrina walls of resid  read more..

How To Clean Mold On Shower Grout

Always handle bleach with caution. Bleach can irritate the eyes, nose, throat and skin. Never mix bleach with ammonia – toxic chlorine gas may result. Open a window or door to provide fresh air while disinfecting. Protect skin and eyes from contact with bleach. Test solution on a small area befor  read more..

Leaking Toilet Base

Burst Pipe Floods Basement Areas On the front page...Late Tuesday evening, June 26, the Clinical Center experienced one of the worst floods in its history when a water booster pump vibration eliminator on a chilled- water pipe burst and ran for 40 minutes before it was detected Water Damage Leaking Toilet Base and st  read more..

Get The Smell Of Raw Sewage Out Of The House

The overall performance of a lift station depends on the performance of the pumps. All pumps have four common performance characteristics: capacity,head, power, and overall efficiency. Capacity (flowrate) is the quantity of liquid pumped per unit of time, typically measured as gallons per minute(gpm  read more..

Forensic Cleaning And Training In Florida

The term "contaminated laundry" was used in the proposed standard in the description of paragraph (d)(4)(iv) housekeeping, but no definition was provided for the term. Crime Scene Cleanup Forensic Cleaning And Training In Florida The final standard contains a definition "contaminated laundry". 

This term is   read more..

Get Your Photos Back After A Water Restore

Acquisitions decisions should consider not just the importance of a title to a subject area or whether it should be acquired in hard copy, microformat, or electronically to serve user needs best, Document restoration Get Your Photos Back After A Water Restore but also the long-term preservation requirements of those formats. 

<  read more..

How To Remove Flood Damage Debris

General Conditions and Special Provisions Project Schedule: Prepare a time schedule beginning with start of mobilization through completion of demobilization. Provide a timeline for all major items of work. Site Specific Injury and Illness Prevention Plan (IIPP): Prepare a site specific IIPP which  read more..

Mold Is Growing On The Soil In A Crawl Space

MOLD AND MOISTURE PROBLEMS IN CRAWLSPACES Introduction Some houses in Idaho and across the country have problems with standing water or moisture in the crawlspace, providing a perfect environment for mold growth and Crawl Space Drying Mold Is Growing On The Soil In A Crawl Space other moisture problems. 

For  read more..

Carpet Cleaning After A Flood

Wet bottom sediment was extracted overnight within a Soxhlet apparatus. Two aliquots of the sample extract were quantitatively injected into a polystyrene-divinylbenzene gel permeation column (GPC) andeluted with dichloromethane to remove sulfur and Water Extraction Carpet Cleaning After A Flood partially isolate the target analyt  read more..