Radon Mitigation >> Radon Transform

RADON TRANSFORM MITIGATION STANDARDS 1.0 BACKGROUND The 1988 Indoor Radon transform Abatement Act (IRAA) required the Environmental Protection Agency (EPA) to develop a voluntary program to evaluate and provide information on contractors who offer radon transform Radon Transform control services to homeowners. 

The Radon transform Contractor Proficiency (RCP) Program was established to fulfill this portion of the IRAA. In December 1991, EPA published "Interim Radon transform Mitigation Standards" as initial guidelines for evaluating the Radon Transform performance of radon transform mitigation contractors under the RCP Program. 

Over the past six years, Radon Transform the effectiveness of the basic radon transform mitigation techniques set forth in the, "Interim Standards" has been validated in field applications throughout the United States. This experience now serves as the basis for the more detailed and final Radon transform Mitigation Standards (RMS) set forth in this document. 

PURPOSE The purpose of the RMS is to provide radon transform mitigation contractors with uniform standards that will ensure quality and effectiveness in the design, installation, and evaluation of radon transform mitigation systems in detached and Radon Transform attached residential buildings three stories or less in height. The RMS is intended to serve as a model set of requirements which can be adopted or modified by state and local jurisdictions to fulfill objectives of their specific radon transform contractor certification or licensure programs. 

PARTICIPANTS Minimum requirements are established in the RMS for individuals nationwide who perform radon transform remediation work and wish to participate in the RCP Program. To participate in EPA's RCP Program, Radon Transform the mitigation contractor shall have completed all RCP training and examination requirements, be listed in the current RCP Listing Report, and shall agree to follow the provisions of the RMS. 

SCOPE The Radon Transform requirements addressed in the RMS include the following categories of contractor activity: General Practices, Building Investigation, Worker Health and Safety, Systems Design, Systems Installation, Materials, Monitors and Labeling, Post-Mitigation Testing, and Contracts and Documentation. 

ASSUMPTION Before applying the provisions of the RMS, Radon Transform it is assumed that appropriate radon transform/radon transform decay product measurements have been performed within the structure, and that the owner has decided that radon transform remediation is necessary. 

IMPLEMENTATION 6.1 The RMS includes requirements for installation of radon transform remediation systems and provides a basis for evaluating the quality of those installations. It may be adopted by state regulatory agencies for state or local radon transform mitigation contractor licensure Radon Transform programs. It may also be used as a reference during inspection of in-progress or completed radon transform mitigation work. 

Contractors shall personally conduct follow-up inspection of any radon transform mitigation systems installed by their firm or Radon Transform by subcontractors to insure conformance with the requirements of the RMS. This requirement shall include the post-mitigation testing prescribed in paragraph 17.0. 6.3 EPA will evaluate reports of non- compliance with the RMS that are referred to the Agency by states and other agencies that monitor radon transform mitigation services. 

Based on its evaluation, EPA may initiate established RCP program delisting procedures against contractors that the Agency or States (with certification programs) find are in violation of the mandatory provisions of the RMS (See paragraph 6.4). In addition, Radon Transform EPA or its agent may conduct inspections of radon transform mitigation projects. 

State radon transform program personnel or Radon Transform their contracted representatives are considered EPA agents for conducting such inspections. Those provisions of the RMS that are considered to be mandatory are prefaced by the term "shall." Provisions that are considered good practice but which are not mandatory are prefaced by the terms "should" or "recommended." 

The RMS will be updated as necessary, and in response to technological advances and field experience. LIMITATIONS Although the provisions of the RMS have been carefully reviewed for potential conflicts with other regulatory requirements, Radon Transform adherence to the RMS does not guarantee compliance with the applicable codes or regulations of any other Federal, state, or local agency having jurisdiction. 

Where discrepancies exist between provisions of the RMS and local codes or regulations, local codes shall take precedence. However, Radon Transform where compliance with local codes necessitates a deviation from the RMS, EPA recommends that RCP listed contractors report the deviation in writing to the appropriate EPA Regional Office and the appropriate state regulatory official within 30 days. 

It should be noted that EPA is not requiring the reporting Radon Transform that is recommended in this paragraph. States with radon transform contractor certification programs may require that contractors give prior notification of their intent to deviate from the RMS for research or other purposes.

Environmental Effects Of Meth Labs

Meth Production MethodsThere are various methods for making meth in common practice in the U.S. today. Most Kentucky meth"cooks" use variations of the anhydrous ammonia method (also called the Birch Reduction method or"Nazi" method). Kentucky law Meth Lab Cleanup Environmental Effects Of Meth Labs enforcement have also reported discovery of  read more..

FEMA Flood Maps

What is a Conditional Letter of Map Revision (CLOMR)? A Conditional Letter of Map Revision (CLOMR) is FEM's formal review and comment on whether a proposed project complies with the minimum NFIP FEMA flood maps management criteria. NFIP maps are based on existing, rather than proposed, Flood Damage FEMA Flood Maps&nbs  read more..

Eliminate Mold And Mildew On Basement Walls

Permitting
 You or your moving contractor will have to obtain permits to move the house on public roads or other rights-of-way. These permits may be required by local governments, highway departments, and Basement Drying Eliminate Mold And Mildew On Basement Walls utility companies, not only in the jurisdiction from which your ho  read more..

Water Restoration

I've been a local Crawl Space Drying Water Restoration for 17 years and in the area of the country that I work there are many mobile homes and many prefab houses that have crawlspaces. I have seen every kind of water damage from a burst pipe, to a leaking condensation line and leaking water heaters. I have seen minor cases   read more..

Lead Paint Testing For Paint Contractors

Educate small painting and remodeling contractors about lead-safe work practices to protect the health of occupants (especially small children) and employees. From 1996 to 2000, 34 half-day lead awareness trainings were held throughout California to increase contractors' use Lead Paint Removal Lead Paint Testing For Paint Contractors of lead-s  read more..

What Animals Dig At Night

In a 1992 Biological Opinion, the U.S. Fish & Wildlife Service concluded that may adversely affect the Aleutian Canada Goose (Branta canadensis leucopareia) and the Whooping Crane. Neither of these species has ever been reported in any feedlot or dairy in   read more..

How To Remove Lead Paint From Doors

Simple Steps to Protect Your Family from Lead Hazards If you think your home has lead-based paint: Don't try to remove lead-based paint yourself. Always keep painted surfaces in good condition to minimize deterioration. Get your home checked for lead hazards. Find a certified inspector or Lead Paint Removal How To Remove Lead Paint From Doors risk   read more..

How To Treat Hoarding

Compulsive hoarding is when a person collects and keeps a lot of items, even things that appear useless or of little value to most people. These items clutter the living spaces of the home and prevent the person from using their rooms as they were intended. Most often, people hoard common possession  read more..

Dispose Of Lead Paint Chips

The permissible exposure limit(PEL) set by the standard is 50 micrograms of lead per cubic meter of air (50 µg/m3), averaged over an 8-hour workday. E. Action level: The interim final standard establishes an action level of 30 micrograms of lead per cubic meter of air(30 µg/m3), averaged   read more..

How To Remove Smoke Smell

Most people buy air purifiers to ease asthma or allergies. But despite product claims, there's little definitive medical evidence that purifiers help relieve respiratory symptoms. Some may pose a threat even to healthy users. Electrostatic precipitators are the most heavily promoted purifiers, Smoke Damage How To Remove Smoke Smell   read more..