Lead Paint Removal >> Lead Paint Removal Procedures

The employer shall assure that employees do not enter lunch room facilities or eating areas with protective work clothing or equipment unless surface lead dust has been removed by vacuuming, downdraft booth, or other cleaning method that limits dispersion of lead dust. (5) Hand washing facilities. (A) The employer shall provide adequate hand washing facilities for use by employees exposed to lead in accordance with Lead Paint Removal Procedures section 1527. 

(B) Where showers are not provided the employer shall assure that employees wash their hands and Lead Paint Removal Procedures face at the end of the work shift. (6) Regulated Area. (A) Employers shall establish regulated areas, where feasible, for work areas where employees are exposed to lead at or above the PEL or performing the tasks described in subsection (d)(2). 

(B) Regulated areas shall be posted with signs as described in subsection (m)(2). (C) Employers shallrestrict access to the regulated area to employees authorized by the supervisor, Lead Paint Removal Procedures to representatives of affected employees, as described in subsection (o) and to persons authorized by the Chief or NIOSH. 

(D) Each employee authorized to enterthe regulated area shall be provided with and be required to wear protective equipment required by subsections (f) and (g). (j) Medical surveillance. (1) General. (A) The employer shall make available initial medical surveillance to employees occupationally exposed on any day to lead at or Lead Paint Removal Procedures above the action level.

Initial medical surveillance consists of biological monitoring in the form of blood sampling and analysis forlead and Lead Paint Removal Procedures zinc protoporphyrin levels. (B) The employer shall institute a medical surveillance program in accordance with subsections (j)(2) and (j)(3) for all employees who are or may be exposed by the employer at or above the action level for more than 30 days in any consecutive 12 months; 

(C) The employer shall assure that all medical examinations and procedures are performed by Lead Paint Removal Procedures or underthe supervision of a licensed physician. (D) The employer shall make available the required medical surveillance including multiple physician review under subsection (j)(3)(C) without cost to employees and at a reasonable time and place. 

(2) Biological monitoring. (A) Blood lead and ZPP level sampling and analysis. The employer shall make available biological monitoring in the form of blood sampling and Lead Paint Removal Procedures analysis forlead and zinc protoporphyrin levels to each employee covered under subsections (j)(1)(A) and (B) on the following schedule: 

1. For each employee covered under subsection (j)(1)(B), atleast every 2 months forthe first 6 months and Lead Paint Removal Procedures every 6 months thereafter; 2. For each employee covered under subsections (j)(1) (A) or(B) whose last blood sampling and analysis indicated a blood lead level at or above 40 µg/dl, at least every two months. 

This frequency shall continue until two consecutive blood samples and analyses indicate a blood lead level below 40 µg/dl; and Lead Paint Removal Procedures 3. For each employee who is removed from exposure to lead due to an elevated blood lead level at least monthly during the removal period. (B) Follow-up blood sampling tests. 

Whenever the results of a blood lead level testindicate that an employee's blood lead level exceeds the numerical criterion for medical removal under subsection (k)(1)(A), Lead Paint Removal Procedures the employer shall provide a second (follow-up) blood sampling test within two weeks afterthe employer receives the results of the first blood sampling test. 

(C) Accuracy of blood lead level sampling and analysis. Blood lead level sampling and analysis provided pursuant to this section shall have an accuracy (to a confidence level of 95 percent) within plus or minus 15 percent or 6 µg/dl, Lead Paint Removal Procedures whichever is greater, and shall be conducted by a laboratory approved by OSHA. 

Employee notification. 1. Within five working days afterthe receipt of biological monitoring results, the employer shall notify each employee in writing of his or her blood lead level; Lead Paint Removal Procedures and 2. the employer shall notify each employee whose blood lead level exceeds 40 µg/dl that the standard requires temporary medical removal with Medical Removal Protection benefits when an employee's blood lead level exceeds the numerical criterion for medical removal under subsection (k)(1)(A). 

(3) Medical examinations and consultations. (A) Frequency. The employer shall make available medical examinations and Lead Paint Removal Procedures consultations to each employee covered under subsection (j)(1)(B) on the following schedule: 1. At least annually for each employee for whom a blood sampling test conducted at any time during the preceding 12 months indicated a blood lead level at or above 40 µg/dl; 

2. As soon as possible, upon notification by an employee eitherthat the employee has developed signs or symptoms commonly associated with lead intoxication, that the employee desires medical advice concerning the effects of current or Lead Paint Removal Procedures past exposure to lead on the employee's ability to procreate a healthy child, that the employee is pregnant, orthat the employee has demonstrated difficulty in breathing during a respiratorfitting test or during use; and 

3. As medically appropriate for each employee eitherremoved from exposure to lead due to a risk of sustaining material impairment to health, or otherwise limited pursuant to a final medical determination. (B) Content. The content of medical examinations made available pursuant to subsections (j)(3)(A)2.- 3. shall be determined by an examining physician and, ifrequested by an employee, shall include pregnancy testing or Lead Paint Removal Procedures laboratory evaluation of male fertility. 

Medical examinations made available pursuant to subsection (j)(3)(A)1. of this section shall include the following elements: 1. A detailed work history and a medical history, with particular attention to past lead exposure (occupational and nonoccupational), personal habits (smoking, hygiene), and Lead Paint Removal Procedures past gastrointestinal, hematological,renal, cardiovascular, reproductive and neurological problems; 

2. A thorough physical examination, with particular attention to teeth, gums, hematological, gastrointestinal,renal, cardiovascular, and Lead Paint Removal Procedures neurological systems. Pulmonary status should be evaluated if respiratory protection will be used; 3. A blood pressure measurement; 4. A blood sample and analysis which determines: 

a. Blood lead level; b. Hemoglobin and hematocrit determinations,red cell indices, and examination of peripheral smear morphology; c. Zinc protoporphyrin; d. Blood urea nitrogen; and, e. Serum creatinine; 5. A routine urinalysis with microscopic examination; Lead Paint Removal Procedures and 6. Any laboratory or othertestrelevant to lead exposure which the examining physician deems necessary by sound medical practice. (C) Multiple physician review mechanism.

Protect Your Child From Lead Paint

Do not let your child chew on painted surfaces or eat paint chips. Some old paint has lead in it. When paint gets old, it breaks down into dust. This dust spreads all around your home. Wash your child's hands and toys often. Always wash hands before eating and sleeping. Lead dust and dirt can stick   read more..

Types Of Security For Fenced Yards

Storm surge levels on Galveston Island and on the west side of Galveston Bay are estimated to be between 10 and 15 ft. Here, too, several NOS tide gauges failed, although the gauge at Eagle Point on the west side of Galveston Bay recorded a maximum surge of 11.48 ft.The highest inundation, of at lea  read more..

How To Start A Debris Removal Business

The Grantee will provide funds to the Subgrantee in accordance with Federal and State requirements. The Grantee will ensure that Subgrantees understand and adhere to Federal procurement requirements as well as other requirements of 44 CFR Part 13, 2 CFR Part 215, and the appropriate Office of Manage  read more..

State Laws On Crime Scene Cleanups In Michigan

Moreover, it was not clear whether "reasonably anticipated" from the first sentence meant the same as "reasonably expected" in the second sentence. Some commenters found the language contradictory in that there might be situations where the exposures are incidental or infrequent yet reasonably antic  read more..

Symptoms Of Ocd

Obsessive compulsive disorder Treatment More information on obsessive compulsive disorder People with obsessive compulsive disorder (SYMPTOMS OF OCD ) have thoughts (obsessions) or rituals (compulsions) which happen over and over again. Rituals , such as hand washing, counting, checking on a speci  read more..

Know If A Radon Mitigation System Is Working

Administrative Procedures for Mail-In Tests After EPA accepts an Application for a mail-in device, the applicant will be scheduled for his or her device performance test. The RQAC will send a notice to the applicant requesting the appropriate device(s) prior to the performance test date. Applicant f  read more..

OSHA Height Regulations For A Safety Fence

A Hurricane Hunter mission on the afternoon of 6 September, just as Ike was approaching the Turks and Caicos Islands, measured a maximum flight-level wind of 129 kt and Emergency Board up OSHA Height Regulations For A Safety Fence an SFMR estimate of 114 kt, supporting an increase in intensity to 115 kt. A reporting station on Grand Turk (78118)  read more..

The Tenant Who Leaves Trash Behind

If circumstances change Once the tenant and the landlord make a rental agreement, the tenant may NOT have the right to get back full deposits or prepaid rent if he or she decides not to move in.In a month-to-month tenancy, the tenant is responsible for as much as one month's rent, or Tenant Move Out Cleanup The Tenant Who Leaves Trash Behind   read more..

OCD Symptoms

Obsessive-compulsive disorder Obsessive-compulsive neurosis; OCD SYMPTOMS Last reviewed: February 26, 2013. Obsessive-compulsive disorder (OCD SYMPTOMS) is an anxiety disorder in which people have unwanted and repeated thoughts, feelings, ideas, sensations (obsessions), or behaviors that make them f  read more..

Compulsive Hoarding Elderly

As the population in the United States of older citizens increases, then also the amount of older adults that hoard. The impact of the Hoarding Compulsive Hoarding Elderly behavior on the health and safety of older people and the community could be significant, so are we ready? Hoarding can be defined as the collecting of a  read more..