Lead Paint Removal >> CONSTRUCTION BASICS OF A LEAD HEALTH

CONSTRUCTION BASICS OF A LEAD HEALTH & SAFETY PROGRAM All of the following protective measures areimportant for preventing work-related lead poisoning. Review each item and check the box if the statement is true for your workplace. Unchecked boxes may indicate problems that should be corrected, and possible violations of the Cal/OSHA lead in CONSTRUCTION BASICS OF A LEAD HEALTH construction standard (Title 8 CCR Section 1532.1). 

Identification of Lead Hazards and Employee Training If work involves disturbing paint or handling other lead materials on metal structures, buildings or pre-1978 housing, CONSTRUCTION BASICS OF A LEAD HEALTH the coatings are tested for lead (or assumed to contain lead) and all necessary precautions are taken. Employees are informed of the results. 

Material Safety Data Sheets and labels for all raw materials or products you use are reviewed, CONSTRUCTION BASICS OF A LEAD HEALTH to determine if they contain lead. Employees are informed of the hazards. All employees potentially exposed to lead dust, mist, or fumes are trained in the hazards of lead, how to protect themselves, and the worker protections required by the Cal/OSHA lead in construction standard. 

Employees exposed over 50 micrograms per cubic meter of air(ug/m3) while working on residences or public access buildings, CONSTRUCTION BASICS OF A LEAD HEALTH and their supervisors, have additional training and are state-certified (CA Dept of Public Health). Written notification to Cal/OSHA at least 24 hours before lead work begins. Exposure Controls Lead-free materials are substituted, and high exposure tasks are eliminated where possible. 

Airborne lead levels over 50 ug/m3 are reduced by using safer tools, CONSTRUCTION BASICS OF A LEAD HEALTH mechanical ventilation (e.g., HEPA vacuum), or changing work practices. The work area is kept as free as possible from lead contamination, through regular cleaning by safe methods (e.g., wet methods or vacuuming with a toxic dust HEPA vacuum). 

Dry sweeping is not done. Use vertical and horizontal containment to keep lead dust and paint chips inside work area, CONSTRUCTION BASICS OF A LEAD HEALTH dispose of lead waste properly, and leave the job site free of lead contamination. There is a written lead compliance program for reducing exposures over 50 ug/m3. Respirators Respirators are used to protect against airborne lead exposure during all disturbance of lead and related cleanup. 

The appropriate respirator is initially selected based on the task being performed and its assumed exposure level and CONSTRUCTION BASICS OF A LEAD HEALTH the assigned protection factor(APF) of the respirator. Air monitoring results are then consulted to ensure that adequate protection is being provided. 

A complete respirator program is in place where respirators are used, including: annual face seal fit-testing,regular face seal checking, training, medical determination of fitness for respirator wearing, and provisions for cleaning and CONSTRUCTION BASICS OF A LEAD HEALTH storage. Wash-up Facilities, Personal Hygiene, and Protective Clothing 

No eating, drinking, using tobacco products, or CONSTRUCTION BASICS OF A LEAD HEALTH applying cosmetics occurs in work areas where lead may be present. Clean protective work clothing (disposable or regularly laundered) and work shoes are provided to employees. They are not taken home from the job site. Wash-up facilities, with water, soap, and clean towels, are available and consistently used by workers to clean up before breaks and at the end of the shift. 

Showers are made available where feasible. Workers change their clothes and CONSTRUCTION BASICS OF A LEAD HEALTH shoes in a clean change area. Their street clothes/shoes are stored in a separate container from their work clothes/shoes. There is a clean area, away from the work area, for workers to take breaks and eat lunch. Medical Program 

A lead-specific medical program is in place and CONSTRUCTION BASICS OF A LEAD HEALTH under the supervision of a licensed physician who is knowledgeable about the Cal/OSHA lead in construction standard. Blood lead and zinc protoporphyrin (ZPP) testing are done at least every 2 months for the first 6 months and every 6 months after that for employees exposed to lead. 

[A more frequent monitoring schedule is recommended, e.g., at the start and finish of each major job and at least every 2 months in between.] Blood lead and ZPP results are provided in writing to employees within 5 days of receiving them from the laboratory. BLL and ZPP results are reviewed and, CONSTRUCTION BASICS OF A LEAD HEALTH where increases of 10 ug/dl or more are noted over time, protective measures are evaluated and improved as needed. 

Medical exams specific to the potential health effects of lead are provided to any employee with a blood lead level of 40 ug/dl or higher. Employees with blood lead levels of 50 ug/dl or CONSTRUCTION BASICS OF A LEAD HEALTH above are removed from further exposure to lead, and provided with alternate work or medical leave with full pay and benefits. 

The employee is removed from exposure until at least two consecutive monthly blood lead levels are below 40 ug/dl. Air Sampling Personal air sampling is conducted to determine the 8-hour average airborne lead exposure level for all employees potentially exposed to lead dust or CONSTRUCTION BASICS OF A LEAD HEALTH fumes. Employees are informed in writing of air sampling results representative of their airborne lead exposure within 5 days of receiving results from the lab. 

Air sampling is repeated when there is any significant change in materials, process, control, personnel, CONSTRUCTION BASICS OF A LEAD HEALTH or tasks that may result in higher employee exposure. When exposures are above the Action Level but below the Permissible Exposure Limit (PEL), air monitoring is repeated at least every six months. 

When exposures are above the PEL, air monitoring is repeated quarterly. In 1995, CONSTRUCTION BASICS OF A LEAD HEALTH OLPPP determined that painting contractors and general and remodeling contractors were largely still unaware of Cal/OSH's construction lead standard (Title 8 CCR 1532.1), which became effective in November 1993. 

Despite these regulatory actions, OLPPP found that contractors were not in compliance with nor educated in these areas. In general, these small business owners did not have lead safety programs to protect their employees, CONSTRUCTION BASICS OF A LEAD HEALTH employees' families, and building occupants from lead poisoning because of the disturbance of lead paint during construction work. 

Although they tend to be small (2 to 20 employees), there are thousands of painting and remodeling contractors across the state (16,000 licensed painting contractors in California alone; Contractors State Licensing Board, 1999); thus, CONSTRUCTION BASICS OF A LEAD HEALTH the total worker population is quite large. Given the large older housing stock in California (U.S. Bureau of the Census, 1992), there are many opportunities for occupants and workers to be exposed to lead paint (EPA, 1999). 

After working with San Francisco–based painting contractors and their employees in a 2-year intervention research project (Materna et al., 2002), OLPPP identified increasing lead safety awareness among painting and CONSTRUCTION BASICS OF A LEAD HEALTH remodeling contractors statewide as a high priority for the program. 

The intervention project titled the "California Painters Project" developed a number of industry-specific educational materials, CONSTRUCTION BASICS OF A LEAD HEALTH best practices, and messages that were then revised for statewide distribution through this broader effort.

Physical Symptoms Of A Meth Lab In Your Apartment

CLEANUP PROCEDURES FOR SOIL, GROUNDWATER AND SURFACEWATER
If areas of soil, surface water or groundwater contamination Meth Lab Cleanup Physical Symptoms Of A Meth Lab In Your Apartment are present, characterizationand cleanup of these areas should be conducted by a professional environmentalcontractor, in consultation with the CT Department  read more..

Treatments For Air Duct Mold

There are no laws about mold, but there ARE building codes and public health codes that make sure everyone has safe and healthy housing in Michigan. There are also laws that help protect consumers in Michigan.On the following pages you will find some Mold Remediation Treatments For Air Duct Mold suggestions that may help you addr  read more..

Smoke Damage

The fire combustion process when wood is burned is never quite complete and the Odor Control Smoke Damage from a wood burnt fire usually will contain a dark brown or black substance which has a very unpleasant odor. This tar looking substance is called creosote and is found almost anywhere in a wood house fir  read more..

Can A Private Homeowner Dispose Of Asbestos Floor

Material Properties Materials are either amorphous or crystalline. The difference between these two descriptions depends on the positions of the atoms in them. The atoms in amorphous materials are randomly arranged with no long range order Asbestos Abatement Can A Private Homeowner Dispose Of Asbestos Floor. An example of an amorphous material is glass.  read more..

How Long Do Hurricanes Last

The most critical aspect of building in hurricane hazard areas is the method of connecting the structural members. Pilkey et al. (1981) note that wood is one of the best materials for absorbing short-duration loads such as those caused by wind, but the strength of wood cannot be used to advantage if  read more..

How To Keep Animals Out Of Sheds

Trapping and translocation operations. Permittees wishing to trap and translocate Canada geese must comply with the following procedures: a. Permittees must obtain written permission from the biologist responsible for the county in which the trap and translocation operation is proposed for every sit  read more..

Wet Crawl Space Dehumidification Vs Ventilation

While the kiln described in this publication is designed for simple operation, you will still need to closely monitor the drying process. Monitoring the moisture loss and quality of the wood during the drying process will help you maximize the efficiency of the kiln. Simply explained, when drying lu  read more..

Recovering Hurricane Irene

Recovery from Hurricane Irene Steps to take before returning to homes or schoolsChildren, and whenever possible teens, should not be involved in clean-up efforts but can returnonce areas are cleaned. Children should be the last group to return Water Damage Recovering Hurricane Irene to areas impacted by flooding.

  read more..

Biohazard Cleanup

Crime Scene Cleanup Biohazard Cleanup is definitely a unique and different job than most others. Not too many people, say that, that's what they want to do when they grow up. But it can be a very challenging and rewarding job for the people that like to help make a difference. It takes a special person, to be able to work wi  read more..

Hurricane Damage

A hurricane can cause extensive damage covering a huge amount of area, sometimes a hurricane could affect an area of thousand miles long creating a massive amount of Debris Removal Hurricane Damage. Thousands of people's lives are affected by hurricanes every year, luckily there are only a few hurricanes each year, the  read more..