Lead Paint Removal >> Lead Paint Exposure To Iron Workers

Field measurements using a tape measure of 12 of the cuts revealed that the paint was stripped back an average of 1.15 (range of 0.5 to 4.0 inches) inches from the cut line (based on 69 measurements taken). After hot cutting, Lead Paint Exposure To Iron Workers burned paint provided visual evidence that stripping was insufficient (Figure 2). 

Visual observation and XRF measurements confirmed that eight of the 40 segments to be cut (the inside corner pieces) had not been stripped at all, Lead Paint Exposure To Iron Workers since the XRF readings were no different from readings taken in the painted areas. The XRF was needed to confi rm lack ofstrip- ping since new primer paint had been applied,making it difficult to visually determine which areas had been stripped. 

Personal Sampling Results The eight-hour TWA lead exposure for day one was 3898 ¹g/M3 , Lead Paint Exposure To Iron Workers or 78 times the OSHA Permissible Exposure Limit (PEL) of 50 ¹g/M3 . The task-specifi c exposure level during hot cutting on day one was 11,271 ¹g/M3 (166-minute TWA); this involved cutting on both stripped and unstripped steel. 

The eight- hour TWA lead exposure on day two was 4027 ¹g/M3 (81 times the PEL). The task-specifi c exposure level when working on the stripped steel was 670 ¹g/M3 (91-minute TWA). In contrast, Lead Paint Exposure To Iron Workers the exposure level when working on the unstripped steel in the corners was 30,000 ¹g/M3 (63-minute TWA) (Table I). 

Personal Protection Observations The ironworker was wearing a half- mask, air-purifying respirator with "pancake" style P-100 filters, welder's helmet, foam earplugs, and heavy welder's gloves (Figure 1). At the end of day two, Lead Paint Exposure To Iron Workers small holes were found in the P-100 respirator pancake filters, apparently due to welding sparks. 

The filter material at the inhalation valve gasket was discolored on one of the filters. These holes and Lead Paint Exposure To Iron Workers the discoloration indicated at least partial failure of the filter. Discussion Air Sampling Results This was a very limited industrial hygiene survey in which a single iron- worker was monitored over two successive days of hot cutting on stripped steel. 

However, the survey illustrates that several factors may contribute to high lead exposures experienced by ironworkers. First, Lead Paint Exposure To Iron Workers the so-called stripped areas may be stripped back significantly less than the Cal/OSHA required four inches on both sides of a cut line. Second, difficult to reach corners may not be stripped at all. 

If these results are typical of exposures to ironworkers working on bridges, then minimum respiratory protection should be half-mask, Lead Paint Exposure To Iron Workers supplied-air respirators in positive-pressure mode, as initially required by the Lead in Construction Standard for highest exposure trigger tasks. 

The results of short-term lead exposure monitoring during hot cutting on stripped and Lead Paint Exposure To Iron Workers nonstripped areas indicate that hot work on .75-inch steel which has been stripped back only 1.15 inches from the cut line creates signifi cantly less exposure than work on unstripped steel (670 ¹g/M3 vs. 30,000 ¹g/M3 ). 

However, cutting of the stripped areas results in exposure levels that exceed the maximum use concentration (MUC) of the half-mask respirator that this iron- worker was wearing (MUC D 10 £ PEL), Lead Paint Exposure To Iron Workers if sustained over an eight-hour shift. Further studies are indicated to determine whether hot work on steel that is stripped back the required minimum of four inches reduces exposure to airborne levels less than the PEL. 

XRF Results The XRF was a useful tool for determining which areas were adequately stripped and Lead Paint Exposure To Iron Workers which were not. Visual observation, on the other hand, would have been inadequate in locating the unstripped corner areas identifi ed by the XRF, since these areas had been newly primed with the same gray primer (non lead-based) as the stripped areas. 

The XRF also detected that the lead was located primarily in the deepest (red- colored) original paint layers. The XRF was somewhat useful as a gross qualitative tool in determining which elements were present besides lead (iron and fiinc) and which elements were below its detection limit (arsenic, chromium, manganese, Lead Paint Exposure To Iron Workers and nickel below a DL of 500 ppm; mercury below a DL of 100 ppm). 

Laboratory results for arsenic (<50 ppm) concurred with the XRF readings (<500 ppm). However, Lead Paint Exposure To Iron Workers the laboratory analysis for chromium (1900 ppm) did not agree with the XRF reading (<500 ppm). This discrepancy casts some doubt on the usefulness of the XRF as a metals-screening tool. In addition, cadmium and beryllium could not be measured with this model XRF due to the interference from the cadmium radiation source. 

Respiratory Protection Inadequacies Hot work on bridges is often viewed incorrectly as a low-lead or nonlead activity, Lead Paint Exposure To Iron Workers since industrial painters have supposedly stripped back the steel before the ironworkers arrive. In this instance, the ironworker had only a half-mask, air-purifying respirator available. 

Iron- workers performing hot work on structures with high concentrations of lead in the paint should be required to wear air supplied respirators in positive-pressure mode initially. Moreover, Lead Paint Exposure To Iron Workers sparks may burn holes in respirator filters, reducing their effectiveness. Multi-Employer Challenges 

Lead exposure issues are magnified at a multi-employer worksite consisting of many layers; in this case, the state department of transportation, general contractor, painting subcontractor, and ironworker subcontractor. First, the government agency responsible for bridge repair may be reluctant to play a strong role in worker safety, Lead Paint Exposure To Iron Workers fearing that intervening in contractor affairs makes them liable in the case of a third-party injury suit. 

Second, the general contractor, with overall responsibility for safety and health conditions at the worksite, may shortchange safety in the interest of production. Finally, Lead Paint Exposure To Iron Workers the ironworker, arriving on the site after the painters have left, may discover that the stripping is inadequate, but decide to complete the job anyway. Further, the ironworker may be an owner or operator, as in this survey, and may not be covered by OSHA regulations.

Basement Drying

Now that we’re in the middle of a storm season, it would be a good time to talk about what would happen if your house sustained some kind of Basement Drying Basement Drying. High winds associated with a tornado can be devastating, you may think that you're one of the lucky ones, because your house is still standin  read more..

Tools For Restoring Fire Damaged Electronics

While the conductivity of some conducting polymers may be as much as 100 times higher than that of MnO2, the improvement in capacitor ESR is not this dramatic. What is typically seen is reduction of capacitor ESR by a factor of between 2 and 4. The discrepancy is due to several factors. First,   read more..

Water Extraction From Carpet After Pipe Breaks

In addition to the decline in land-surface altitude,the loss of marshes and barrier islands that dampen storm surge and waves during hurricanes increases the risks of flood disaster in New Orleans Water Extraction Water Extraction From Carpet After Pipe Breaks and vicinity.

Since 1940, approximately 1 million acres of c  read more..

Dehumidification

One place definitely going to see Mold Remediation Dehumidification is in the bathroom. The main culprit in this area is going to be believe it or not behind the tile in your shower. Because showers that have tile walls are usually placed over drywall, and have porous grout joints. The drywall behind is usually not as we  read more..

WATER DAMAGE AND MOLD FROM FLOOD RESPONSE

WATER DAMAGE AND MOLD FROM FLOOD RESPONSE FLOOD RESPONSE - WATER DAMAGE AND MOLD HOW DO I PROPERLY CLEAN UP MY HOME IF IT HAS BEEN FLOODED OR HAS WATER DAMAGE? First, Water Damage WATER DAMAGE AND MOLD FROM FLOOD RESPONSE make sure electricity and natural gas or propane tanks are shut down. 

The Centers fo  read more..

The Cost To Remove Lead Paint

How Are Workers Exposed to Lead?Workers can be exposed to lead by creating dust or fumes during everyday work activities. Fumes are easier to breathe in and therefore may be more dangerous than dust. These are some of the most common ways to be exposed. LEAD DUST is produced in Lead Paint Removal The Cost To Remove Lead Paint many ways i  read more..

Water Extraction

Electronic data base consists of all the material that is Kept as Document restoration Water Extraction in your businesses office and the attempted prevention of the loss of this valuable electronic data base will depend on the routine daily backing-up of all computer server files. The section of material and instructional sk  read more..

Types Of Backup Preventions

Presented below are possible solutions that could be implemented by homeowners to protect their property from backups. This section assumes that sanitary sewage is backing up through plumbing fixtures located in a basement or lower level and the property owner has identified and Sewage Cleanup Types Of Backup Preventions eliminated all   read more..

Removing Chrysotile Asbestos

About 95% of the asbestos used in the United States ischrysotile, it shows up in many different forms, manufactured into many different items. Some of the more common ones include insulation and popcorn ceiling, also it has been made into floor tile. Because of the many health risks Asbestos Abatement Removing Chrysotile Asbestos done  read more..

How To Prevent Sewer System Backup

Having sewage back up into the home is an unpleasant and potentially unhealthy experience. The information contained here can help protect you from the hazards of raw sewage in your basement and give you practical methods for proper sanitation of your building should a back-up occur.
Sewers ca  read more..