Yes No Top of Form How can we make better? (250 Character max.) We are collecting this info under OMB clearance number 1225-0059 Bottom of Form Thank you for your feedback! Please Contact Us if you have any other Asbestos Tile comments or questions!  Thank you for your July 27 letter regarding the cleaning of asbestos-containing floor tile. 

You wish clarification of the Asbestos Tile provisions in the Occupational Safety and Health Administration (OSHA) asbestos standards which regulate this activity. Your questions and our answers are provided below. 

Question 1: Are we correct that asbestos floor tile cleaning activities (normal maintenance such as stripping and buffing operations) are covered under both the asbestos General Industry Standard (§1910.1001) and Asbestos Tile the asbestos Construction Standard (§1926.1101)? 

Answer: Yes. Both standards contain the same Asbestos Tile requirements for care of asbestos-containing flooring material. The requirements are at 29 CFR 1910.1001(k)(7) and 29 CFR 1926.1101(l)(3). 

Question 2: Are we correct that for normal cleaning (routine stripping and buffing) that the asbestos General Industry housekeeping procedures apply, Asbestos Tile however the asbestos Construction Standard applies when floor tile clean-up activities are performed as a result of or incidental to a Class I, II or III job? 

Are we also correct, that asbestos floor tile cleaning under the Construction standard is considered a Class IV job? Answer: Stripping or Asbestos Tile buffing asbestos-containing flooring material previously soiled with asbestos-containing dust or debris from a Class I, II, or III asbestos job is not part of the clean-up activity. 

The clean-up activity consists of picking up the debris and vacuuming up the dust. As such, Asbestos Tile stripping or buffing asbestos-containing flooring material does not come under any of the designated classes of asbestos work defined in the Construction asbestos Standard. 

The stripping or buffing of asbestos-containing flooring material usually comes under the scope of the General Industry asbestos Standard. However, Asbestos Tile stripping or buffing of the flooring material comes under the scope of the Construction asbestos Standard if a construction company does it as part of the completion of a construction project. 

Question 3: Both standards discuss stripping operations and [stipulate] that low abrasion pads, wet methods, and Asbestos Tile speeds lower than 300 rpm must be employed. If higher speed machines are used and current Negative Exposure Assessment (NEA) data exists (by TEM) showing the PEL was not exceeded, is it necessary to submit a written alternative work procedure and/or seek a variance? 

Answer: The Construction asbestos Standard does not allow the Asbestos Tile use of alternative procedures for care of asbestos-containing flooring material. The Standard makes allowances for using alternative control methods for only Class I or II asbestos work. 

The fact that the asbestos PELs are not exceeded when the floor stripping uses low Asbestos Tile abrasion pads at speeds greater than 300 revolutions per minute (rpm) is not a sufficient condition to warrant the receipt of a variance permitting such use. 

In order to receive a variance, the employer must have implemented some means of maintaining asbestos aerosol levels in the employees' breathing zones at levels equal to or Asbestos Tile less than the levels occurring at speeds lower than 300 rpm. Question 4: While the Construction Standard discusses submitting alternative work procedures, the General Industry Standard does not. 

How does one handle an alternative work procedure regarding the General Industry Standard? Answer: As we noted in our reply to your third question, Asbestos Tile the Construction asbestos Standard makes allowances for alternative control methods for only Class I or II asbestos work. 

Therefore, whether the stripping or buffing of asbestos-containing flooring material is covered by the Construction asbestos Standard or Asbestos Tile the General Industry asbestos Standard, the employer who wishes to use alternative stripping or buffing procedures must seek a permanent variance.

How Do I Remove Asbestos Siding In North Carolina

A set of index of refraction oils from about n = 1.350 to n = 2.000 in n = 0.005 increments. (Standard for Becke line analysis.) (j) Glass slides with painted or frosted ends 1x3 inches 1mm (thick, precleaned.) Asbestos Abatement How Do I Remove Asbestos Siding In North Carolina Cover Slips 22x22 mm, #1 1/2 (l) Paper clips or dissection needles (m) H  read more..

Storm Wind Damage Scale

Area affected by the July 4, 1969 derecho (outlined in blue), with the approximate hourly positions of the leading edge of derecho winds (gust front) indicated by curved purple lines. Arrows indicate direction of storm winds. During the afternoon of Friday, July 4, 1969, Wind Damage Storm Wind Damage Scale thunderstorms  read more..

How To Secure A Fenced Perimeter

Hurricane Ike 2008 Ike was a long-lived and major Cape Verde hurricane that caused extensive damage and many deaths across portions of the Caribbean and along the coasts of Texas and Louisiana. It originated from a well-defined tropical wave that moved off the west coast of Africa on August 28 and&n  read more..

Mold Detector

Assess the size of the mold and/or moisture problem and the type of damaged materials before planning the remediation work. Select a remediation manager for medium or large jobs (or small jobs requiring more than one person). The remediation plan should include steps to fix the water or moisture pro  read more..

How To Remove Asbestos From A Roof

Asbestos Requirements for Demolition and Renovation Projects 6/2013 Disclaimer: The statements in this Asbestos Abatement How To Remove Asbestos From A Roof document are intended solely as guidance. This document is not intended, nor can it be relied on, to create any rights enforceable by any party in litigation.  

  read more..

Crime To Operate A Meth Lab

The minimum cleanup requirement includes all steps in Tier 1 Response in addition tothe following: Wash and clean all appliances thoroughly. After cleanup is accomplished, ventilate property for 72 hours. If appropriate,use litmus paper to target areas of potential concern. Alternatively heat a  read more..

How Does A Radon Test Work

The meanings of these terms apply specifically to the RPP. The specialized definitions noted here are used in place of those found in standard dictionaries.Accepted application: An Application that has been entered into the Program database. Acceptance date: The Radon Mitigation How Does A Radon Test Work date on which EPA comp  read more..

Removing Lead Pipes

Lead can enter drinking water through corrosion of plumbing materials, especially where the water has high acidity or low mineral content that corrodes pipes and fixtures. Homes built before 1986 are more likely to have lead pipes, fixtures and solder. However, new homes are also at risk: Lead Paint Removal Removing Lead Pipes even   read more..

Black Mold Caused By A Sewer Backup

The Community Folk Art Center, 805 E. Genesee St., will remain closed this week as officials continue to clean up. Water leaked through the ceiling and the sewer backed up, said Kevin Leonardi, its marketing specialist. Staff members quickly moved art and equipment to safety, but repairs were needed  read more..

Bird And Animal Damage To Buildings

Across the United States, wildlife habitat has been substantially changed as human populations expand and land is used for human needs. These human uses and needs often compete with wildlife which increases the potential for conflicting human-wildlife interactions. In addition, certain segments of t  read more..