Nashville flooding, FEMA Disaster No. DR 1909 TN (Source: FEMA) Some contractors, in order to increase their payments under their debris removal contract, will collect ineligible debris, such as debris not located on the right-of-way, Nashville Flooding And Trash Clean Up and haul it to the collection site for payment. 

This can happen at any time, but it is more likely to occur as the recovery effort is winding down and eligible debris is less plentiful. We were told of cases where contractors had even gone onto state lands or into neighboring counties or Nashville Flooding And Trash Clean Up parishes to collect ineligible vegetative debris. 

Some contractors, who are paid for the mileage their trucks accumulate during the operations, have also been accused of putting on unnecessary miles, Nashville Flooding And Trash Clean Up and even of driving in circles. Monitors can prevent or report such ineligible debris collecting and mileage, but only if they are present at the time of the collections. 

It is expensive to have an individual in every one of the contractor's trucks, Nashville Flooding And Trash Clean Up as some communities have done. Also, FEMA officials have advised that "debris monitors should never be in a debris removal contractor's truck”. 

FEM's Oversight and Management of Debris Removal Operations Page 20Figure 9. Debris-monitoring tower, FEMA Disaster No. DR 1791 TX (Source: FEMA) Local government officials said that the eligibility rules for collections can appear inequitable to their constituents and difficult to enforce. Nashville Flooding And Trash Clean Up

For example, residents of trailer courts, gated communities, Nashville Flooding And Trash Clean Up and other less accessible communities may not receive the same level of debris removal services as more accessible locations. Elderly and disabled residents who cannot haul debris to curbside may miss out on FEMA-reimbursed debris removal services. 

The rules governing leaning trees and hanging branches are complex and difficult to interpret. We were told that some contractors make unnecessary multiple cuts on a damaged tree to increase their payments. It was also alleged that during one recent disaster, Nashville Flooding And Trash Clean Up a contractor cut hundreds of ineligible trees and claimed them for reimbursement. 

Tree operations are frequently a source of disputes between applicants and FEMA, Nashville Flooding And Trash Clean Up and even FEMA employees may not agree on eligibility. Debris Volume Assessment at Collection Sites FEMA officials said most of the excessive costs in the debris program are the result of overstated volumes of collected debris. Most debris collection is paid for on a volume basis. 

The following occurs at the collection site: The contractor's trucks arrive at a collection site. FEM's Oversight and Management of Debris Removal Operations Page 21 A monitor (usually located in a monitoring observation tower at the debris management site) assesses what percentage of the truck's volume is full of debris. Nashville Flooding And Trash Clean Up

This percentage is then multiplied by the truck's declared maximum volume (as previously certified and announced on a placard on the side of the truck) to determine the volume of debris to be credited for the load. This amount is noted on a load ticket. Copies of the load ticket are given to the truck driver and Nashville Flooding And Trash Clean Up to accounting. Figure 10. 

Unloading vegetative debris, FEMA Disaster No. DR 1909 TN (Source: FEMA) Problems arise because load tickets often go through many hands as they are routed from the debris disposal site to the applicant. A recent DHS investigation determined that four individuals from a debris-monitoring company conspired to falsify debris load tickets, Nashville Flooding And Trash Clean Up causing FEMA to pay more than $700,000 in fraudulent costs. 

FEMA, state, and local government officials all have monitoring responsibilities, Nashville Flooding And Trash Clean Up but the applicant has the primary responsibility. Officials from all of these organizations said there are numerous ways to cheat this volume-based system. 

Some contractors put false bottoms in their trucks after the load capacity has been certified to overstate credited volumes. Contractors switch or alter placards to make it appear that the truck was certified for a larger volume than was actually the case. Nashville Flooding And Trash Clean Up

A former debris contractor employee reported that he had witnessed trucks being issued fraudulent load certificates. FEM's Oversight and Management of Debris Removal Operations Page 22 Monitors may overstate the percentage load of trucks entering the staging area or Nashville Flooding And Trash Clean Up landfill. 

This can occur because of a need for training or Nashville Flooding And Trash Clean Up capability on the part of the monitor, intimidation of the monitor by the debris hauler, or collusion between the monitoring company and the hauling company. These factors can overstate volume estimates by 20% or more. 

That this is occurring can be shown by the fact that the volume percentages assessed are frequently lower whenever the operation is observed by state, local, or federal employees than when only the truck drivers and Nashville Flooding And Trash Clean Up monitors are at the site. 

One experienced state official said when he was working as a temporary employee in an out-of-state disaster, he observed that 237 trucks in succession had been recorded as 100% full prior to his arrival at a busy monitoring tower. While he was personally in the tower, the monitors recorded loads at 60% to 70%; after he left, the load assessments went back to 100%. Nashville Flooding And Trash Clean Up

This official took photos and measurements at the dump sites and Nashville Flooding And Trash Clean Up landfills and came up with lower percentages than the monitors. He also said that towers sometimes remained unoccupied for up to 45 minutes. Another official reported he had seen trucks consistently being rated as being 80% or more full when they "were not nearly that full.” He said that two colleagues also witnessed similar incidents. 

A FEMA after-action report for Hurricanes Gustav and Ike estimated that FEMA may have overpaid $20 million for debris removal and disposal because qualified monitors were not present at key times and debris load volumes were consequently overestimated. Federal, state, Nashville Flooding And Trash Clean Up and local officials reported that options are available for reducing these problems. 

One state's officials said they "do not ever” contract for monitoring services; instead they use local employees who are perceived as less vulnerable to intimidation or collusion. Nashville Flooding And Trash Clean Up

In states that use private sector monitoring firms, government officials need to ensure that monitors are competent, properly trained, and aware of their rights and responsibilities. FEMA, state, Nashville Flooding And Trash Clean Up and local officials could oversee all aspects of debris operations to minimize fraud and excessive charges. The problem here, of course, is cost.

Certified To Do Lead Removal

If you wish to become certified to do lead-related construction work in California, you must take training from one of the Department of Public Health's (CDPH) accredited training providers. To find out where you can take the this training, go to this link to see the list of approved lead-related co  read more..

Silicone Outgasses

Silicone outgasses and is a concern even in a cable configuration where the outer jacket can protect the system from small amounts of enclosed outgassing material. Current product typically contains relatively large quantities of silicone. The Gore-Tex® construction has not yet been Electronic Restoration Silicone Outgasses ev  read more..

Lead based Paint In Flooded Areas

(ATLANTA – May 26, 2010) – Due to recent flooding in western and central Tennessee, the U.S. Environmental Protection Agency (EPA) in Region 4 wants to ensure that families are not at increased risk for lead poisoning, because of clean up and/or repair work. EPA urges pregnant women and children t  read more..

Black Mold Removal

Coccidioidomycosis is caused by Coccidioides immitis, a dimorphic fungus that grows as a mold in the soil. The mold forms arthroconidia within the hypha, a type of conidia formation known as enteroarthric development (Figure 1) (4). C. immitis is the only species within the primary pathogenic fungi   read more..

Extraction Of Flood Water And Mold

Molds are microscopic organisms found everywhere in the environment, indoors and outdoors. When present in large quantities, molds have the potential to cause adverse health effects. Health Effects of Mold Exposure Sneezing Cough and Water Extraction Extraction Of Flood Water And Mold congestion Runny nose Aggravation of asthma Eye irr  read more..

Foundation Repair

When As Well As Why you Should Turn to Crack in Foundation Repair Services Sooner or later, just about all homes will move and also settle. This could result in chips, which frequently need repairing Basement Drying Foundation Repair piers. Several cracks, however, are simply in the cosmetic finish of the foundation repair. The  read more..

How To Restore Smoke Damaged Archive Photos

If the repository chooses not to use one of the tools cited above, these following questions will help to establish the enduring research or Document restoration How To Restore Smoke Damaged Archive Photos educational value of a collection or a publication in terms of institutional priorities and the overall documentation available on the topic covered:   read more..

Storm Damage Roof Leak

Hygrothermal building component simulation requires a complete set of storage and transport functions. Such functions are typically determined by the aid of material models defining a set of functions that are adjusted to basic material data. Basic material data consists of either single parameters   read more..

Ceiling Leak Repair From Frozen Pipe

The first drying phase can be modeled by the normal diffusion equation (Equation 2) for which analytic solutions can be found in the literature (e.g., Baehr and Stephan 2003; Hens 2007; and Tautz 1971). The second drying phase is Structural Drying Ceiling Leak Repair From Frozen Pipe assumed to start at critical moisture content.  <  read more..

Call A Lead Paint Removal Specialist

Paint or varnish peeling, chipping or flaking? Mop floors to clean instead of sweeping. Carpets are good to cover painted wood floors. Wet scrape or wet sand to avoid creating dust: repaint surface with two coats of paint; encapsulant paint is the best. Painted Furniture & toys have paint chi  read more..