Dehumidification >> When Is Dehumidification Required?

The main cooling coil without being re-evaporated by radiant or conducted heat. The main cooling coil must be When Is Dehumidification Required? selected at a coil face velocity at least 150 fpm below the maximum cataloged face velocity to ensure that moisture does not carry over onto a reheat coil (liquid water carryover onto an active reheat coil results in additional energy consumption and humidification).

AHU fans and motors (if the motor is in the air stream) should be located downstream from the recuperative reheat system for optimum effectiveness. If a supplementary reheat coil is When Is Dehumidification Required? used and its leaving-air temperature is above 100 F, then the fan motor must be selected for reliable operation at the actual temperature conditions at the motor. 

It may be necessary to derate the motor and use Class F or H high temperature motor-winding insulation. Special motors are not required for recuperative-reheat systems not equipped with supplementary reheat coils. 

Because of the possibility of moisture condensing on precooling heat-transfer surfaces during part-load operating conditions, provisions for When Is Dehumidification Required? collecting and draining condensate must be made. Heat-exchange surfaces will accumulate particulate even with well maintained filters. Surfaces should be accessible and cleanable without difficulty or high cost.

The fifth recuperative-dehumidification enhancement is superior to the other four in many respects because it achieves almost the same result with a single coil located downstream from the main cooling coil. The single coil reduces first cost, When Is Dehumidification Required? halves the air-side friction of the recuperative elements, and requires no space or modifications upstream from the main cooling coil. 

With the fifth enhancement, which is applicable only to systems using refrigerant coils served by compressors, the amount of reheat is limited. If a significant temperature rise is required, When Is Dehumidification Required? this enhancement may need to be combined with one of the other four. Details on each of the five recuperative-dehumidification enhancements follow. 

Run-around coils for enhanced dehumidification systems are not a new technology. They are well-described in texts from as long ago as 1939.
The psychrometric-chart analysis of run-around coils for precooling and reheating is identical to that for ordinary reheat (see sidebar) with one exception: 

The precooling coil cools the entering air from 84- to 72-F dry bulb (DB); therefore, the air entering the main cooling coil is cooler,When Is Dehumidification Required? which means that the main cooling coil does not have to remove as much heat. The reheat is provided not by an external source of expensive energy, but by the heat picked up by the circulating fluid in the precoil. 

The cycle and savings are illustrated in Figure 2. Figure 3 is a piping diagram showing that run-around coils require a small closed-loop piping system. When freezing is a possibility, the heat-transfer fluid is dilute ethylene glycol; at other times, it is water. The system requires a means of fluid makeup. A diaphragm compression tank normally is installed for fluid expansion. 

If water (not glycol) is used as the circulating fluid and chilled-water or heating-hotwater lines are in the vicinity, When Is Dehumidification Required? it is possible to achieve fill and fluid expansion with a 3 ⁄8-in. connection to the chilled-water or heating-hot-water closed loop. The expansion of the fluid in the small run-around system then would be provided by the fluid-expansion equipment in the larger system.

 With only a single connection between them, there can be no flow between the two systems except for that induced by density forces of water at different temperatures. The system requires a fractional-hp pump, electrical service, When Is Dehumidification Required? and controls. The recommended pump for the circuit is a 120/60/1 hermetically sealed pump that does not require a shaft seal. 

If a pump with a seal is used, the seal should be mechanical rather than packed to minimize or eliminate leakage. The closed-loop piping system is close-coupled and confined to the immediate vicinity of the two coils. 

Once the circulating fluid is charged into the system, there is little possibility of leakage; therefore, When Is Dehumidification Required? the fluid-makeup system can be a hose connection or a funnel fill valve. Coils and piping must include manual air vents at high points to vent air at the time of initial filling. The piping connections to each coil must be arranged for "counterflow.” 

The lines between the two coils (and the coil headers if exposed to ambient air) must be insulated to prevent external heat transfer. The pump should be located in the warm-fluid line. All of the air passing through the air-handling unit must pass through both coils. Any deviations from these guiding principles will cause a loss in performance.

Advantages of runaround coils are:  They can be widely separated and arranged in any position. If desired, When Is Dehumidification Required? a single precooling coil can be used in combination with multiple reheat coils. They carry the certification of the Air-Conditioning and Refrigeration Institute (ARI) and are available from at least 10 manufacturers. 

Because they are mass-produced using machinery, labor contributes little to their cost. They are, for all practical purposes, commodity items and,When Is Dehumidification Required? therefore, relatively inexpensive. Their selection can be made by the manufacturer or by the manufacturer’s coil-selection program using software on a personal computer. 

The precooling and reheat function can be controlled by pump on-off cycling or valve control. The preheat coil can be piped to a third coil in the exhaust-air stream to capture heat for preheating outside air during the winter.

Disadvantages. Disadvantages of run-around-coil systems are: Possible freezing if water is the When Is Dehumidification Required? circulating fluid (this can be overcome by using a dilute ethylene glycol solution selected to provide burst protection at the coldest anticipated entering-air temperature).
 
A 120-v, 60-cycle single-phase electrical circuit is required for the circulating pump. Air trapped in the coils, When Is Dehumidification Required? pump, and piping must be vented upon initial startup to ensure effective fluid flow and heat transfer. Figure 4 shows run-around coils at the entering and leaving sides of a specially configured unit.

How To Clean Water Damaged Electronic Circuits

Crystals shall be swept synthetic quartz, meeting the infrared quality requirements of grade A or B of Synthetic Quartz Crystal  Specifications and Guide to the Use, IEC 60758 (1993-04), International Electrotechnical Commission, Geneva, Switzerland. Crystals shall be mounted with at least a th  read more..

Water Removal

Successful application of any raw substance is connected in no tiny measure with understanding the character of that substance in correlation to that work done to create a finished article. Wood edifice as correlated to drying dilemmas. [ME] is an important   read more..

The Best Way To Fix A Wet Basement

Like relocation, demolition is very disruptive for the occupants of the house. Unless you decide to buy an existing house elsewhere, you must find a place to live and to store your furniture and Basement Drying The Best Way To Fix A Wet Basement belongings while your new house is being built. 

  read more..

Flood Water Contamination

What if I have already consumed potentially contaminated water?Illness is possible, especially for people that already have a chronic illness or may have compromised immune systems, for example, from AIDS or cancer treatments. This is why boil water notices are issued. Anyone experiencing symptoms s  read more..

Odor Control

To maintain standard performance conditions for Sewage Cleanup Odor Control technicians that cleanup cleanups that involve raw sewage. To make sure that appropriate sewage clean-up processes and personal protection processes are followed during the sewage cleanup, and to protect the technicians, the community, and   read more..

Hoarding Is Defined As Compulsive Gathering

Your loved one keeps parts of the home off-limits and the curtains always drawn. People with a hoarding problem often try to hide it. They may close off areas of their home or try to keep others out of their home altogether. They may fear that if you   read more..

Roof Damage From Raccoons

The state has 10 listed and 1 candidate bird species in the State (U.S. Fish & Wildlife Service 1996), 5 of which are raptors -- the peregrine falcon (Falco peregrinus), bald eagle (Haliaeetus leucocephalus), northern aplomado falcon (Falco femoralis septentrionalis), Mexican spotted owl (Str  read more..

Basement Drying

Associated labor is required for the removal of water damaged structure objects, cleaning, or the use of mold eliminating agents; Structural Drying Basement Drying are contemplated as included in the unit cost for objects removal, cleaning, or mold eliminating application. Sealers and stabilizers, when an insurance claim c  read more..

How To Test For Lead Paint Poisoning

Appropriate follow-up medical examinations or consultations may also be provided for employees who have been temporarily removed from exposure under the medical removal protection provisions of the standard.(See Part IX, below.) The standard specifies the minimum content of pre-assignment and [  read more..

Learn Water Damage Electronic Restoration

All magnetic parts processed to the Class S requirements of MIL-STD-981 are acceptable as level 1 parts. Magnetics processed to Class B requirements of MIL-STD-981 are acceptable as level 2 parts. All level 1 and 2 custom magnetics shall be processed to the Electronic Restoration Learn Water Damage Electronic Restoration applicable requirements of   read more..