Flood Damage >> Electrical Systems In Flood-damaged Buildings

Question: Do electrical systems and equipment submerged through flooding have to be replaced? Answer: Floodwaters are not just water; the water may also be contaminated with chemicals, sewage, oil and other debris. When the floodwater is salt water, its corrosive effects are particularly damaging. Any or all of those can affect the integrity and performance of electrical systems and equipment, Electrical Systems In Flood-damaged Buildings either immediately or eventually.  

Some of the larger types of electrical equipment, such as panelboards, switchboards, certain types of busways, some types of motor control equipment, circuit breakers, protective relays, meters and Electrical Systems In Flood-damaged Buildings current transformers exposed to floodwaters may be reconditioned. To recondition any electrical equipment requires that the work be done by qualified personnel and that the original manufacturer be contacted for specific recommendations. 

In many cases, it is ultimately safer, less expensive and less time-consuming to replace the equipment. Electrical equipment such as outlet and Electrical Systems In Flood-damaged Buildings junction boxes, arc fault circuit interrupters (AFCI), ground fault circuit interrupters (GFCI), surge protective devices, switches, receptacles, dimmers, and lighting fixtures exposed to floodwaters must be replaced.

Wiring or cable exposed to floodwaters may or may not be required to be replaced, depending on the type of wire or cable. Wire or cable listed for dry locations (such as NM-B) exposed to water must be replaced. Wire or cable that is listed for use in wet locations may remain - provided the ends of the wire or cable have not been exposed to water, Electrical Systems In Flood-damaged Buildings and the wire or cable is not damaged. 

But, even with wire or cable listed for use in wet locations, when the wire or cable has been exposed to the contaminants found in floodwaters, Electrical Systems In Flood-damaged Buildings the manufacturer should be consulted before any decision is made to continue using it. Again, in most cases, it is safer, less expensive and less time-consuming to replace the wiring or cable.

For more information, Electrical Systems In Flood-damaged Buildings the publication Evaluating Water-Damaged Electrical Equipment by the National Electrical Manufacturers Association (NEMA) contains practical guidelines and understandable explanations about the salvageability of electrical equipment, wiring, and cable.

Question: When evaluating submerged electrical systems and equipment, who is qualified to determine what is damaged and Electrical Systems In Flood-damaged Buildings must be removed, and what is not damaged and may remain? Answer The municipality determines who is qualified to evaluate submerged electrical systems and equipment for damage. 

Electrical contractors, licensed electricians (where required), third-party electrical inspectors, and utility company representatives would be considered qualified, having the training and Electrical Systems In Flood-damaged Buildings knowledge of electrical systems and equipment necessary to evaluate damage caused by contact with floodwaters. The code enforcement official may also recognize other individuals as being qualified, based on other criteria.

Question: It’s been determined that portions of the electrical system and/or equipment in a dwelling are damaged and have to be removed. What are the requirements for Code compliance? Answer: The requirements for Code compliance depend on whether the work necessary to restore the electrical system Electrical Systems In Flood-damaged Buildings and/or equipment to its pre-damaged state is a repair or a Level 1 alteration.Repairs. 

If the municipality determines that the restoration work is a repair, the installation of new system components and Electrical Systems In Flood-damaged Buildings equipment do not have to meet new construction standards. A repair is defined as the restoration to good or sound condition of any part of an existing building for the purpose of its maintenance. 

Examples of what could be considered repairs to an electrical system would be the replacement of receptacles, switches, and Electrical Systems In Flood-damaged Buildings light fixtures. Repairs do not normally require a building permit.Level 1 Alterations. If the municipality determines that the restoration work is a Level 1 alteration, the installation of new system components and equipment must comply with the requirements for new construction. 

Level 1 alterations are defined as the removal and replacement or the covering of existing materials, elements, equipment or fixtures using new materials, elements, equipment or fixtures that serve the same purpose, without reconfiguring the space. Examples of what could be considered Level 1 alterations to an electrical system would be the replacement of panelboards, circuit breakers, Electrical Systems In Flood-damaged Buildings and branch circuit wiring. Level 1 alterations require a building permit.

Question: The restoration work to the electrical system in the dwelling has been determined to be a repair. What are the Electrical Systems In Flood-damaged Buildings requirements for Code compliance? Answer: Appendix J Section J4 of the 2010 Residential Code of New York State (RCNYS) contains the provisions for repairs to one- and two-family dwellings and townhouses.

Section J401.3 requires that in a flood hazard area, if the repairs will be a substantial improvement, Electrical Systems In Flood-damaged Buildings the building must comply with the new construction provisions of Section R324. A substantial improvement is any repair or alteration to a building where the cost equals or exceeds 50 percent of the market value of the building before the repairs or alterations were started. 

Section R324.1.5 requires that electrical systems, equipment and Electrical Systems In Flood-damaged Buildings components replaced as part of a substantial improvement meet the requirements of the section, including being located at or above the design flood elevation plus a 2-foot freeboard as specified in Section R324.1.3.3. An exception allows electrical systems, equipment and components to be located below the design flood elevation provided specific conditions are met.

If the repairs will NOT be a "substantial improvement,” and in most cases, they are not, compliance with Section J407 is all that is required. Section J407 allows existing electrical wiring and equipment to be repaired or replaced with like materials, Electrical Systems In Flood-damaged Buildings with some exceptions.

Question: The restoration work to the electrical system in the dwelling has been determined to be a Level 1 alteration. What are the requirements for Code compliance? Answer: Appendix J Section J5 of the 2010 Residential Code of New York State (RCNYS) contains the provisions for Level 1 alterations to one- and two-family dwellings and Electrical Systems In Flood-damaged Buildings townhouses.

Section J501.3 requires that in a flood hazard area, if the alterations will be a substantial improvement, the building must comply with the new construction provisions of Section R324. Section R324.1.5 requires that electrical systems, equipment and Electrical Systems In Flood-damaged Buildings components replaced as part of a substantial improvement meet the requirements of the section, including being located at or above the design flood elevation plus a 2-foot freeboard as specified in Section R324.1.3.3. 

An exception allows electrical systems, equipment and Electrical Systems In Flood-damaged Buildings components to be located below the design flood elevation provided specific conditions are met. If the alterations will NOT be a substantial improvement, compliance with Section J508 is required. Section J508 requires that any alteration made to the electrical system meet the requirements for new construction found in Chapters E33 through E42.

Question: It’s been determined that portions of the electrical system and/or equipment in a building (which isn’t a one- or two-family dwelling or a townhouse) were damaged and have to be removed. What are the requirements for Code compliance for that building? Answer: Repairs or Electrical Systems In Flood-damaged Buildings alterations to buildings that are not one- or two-family dwellings or townhouses must be made in compliance with the 2010 Existing Building Code of New York State (EBCNYS). 

The municipality will still determine whether the buildings are undergoing repairs or Level 1 alterations. Alterations or Electrical Systems In Flood-damaged Buildings repairs may comply with Section 302.6 of Chapter 3 Prescriptive Compliance Method of the EBCNYS. Alternatively, Chapter 5 of the EBCNYS contains the provisions for repairs, and Chapter 6 contains the provisions for Level 1 alterations. 

The requirements in Chapters 3, 5 and 6 are similar to those in Appendix J – repairs or Electrical Systems In Flood-damaged Buildings alterations to buildings in a flood hazard area that are substantial improvements require compliance with Section 1612 Flood Loads of the 2010 Building Code of New York State.

Summary Electrical systems and equipment exposed to the contaminants in floodwaters must be carefully evaluated by qualified personnel. While some electrical equipment and Electrical Systems In Flood-damaged Buildings system components may be reconditioned or salvaged, in most cases, it is safer, less expensive and less time-consuming to replace them. 

The municipality will determine if the work necessary to restore the electrical system components and/or Electrical Systems In Flood-damaged Buildings equipment in a structure to its pre-damaged state will be a repair or a Level 1 alteration. The requirements for Code compliance are based on that determination.

Pennsylvania OSHA Regulations On Crime Scene Clean

Many of the issues raised by commenters who disagreed with the Agency's approach to the "Scope of the Standard" related to coverage of workplaces where employees provide service to individuals who are not members of groups known to be at increased risk for HIV or Crime Scene Cleanup Pennsylvania OSHA Regulations On Crime Scene Clean HBV infection. 

  read more..

Testing Your Home For Lead In Paint And Soil

Testing Your Home For Lead In Paint and Soil Why should I test my home for lead? If you have children, lead in your home can cause serious long term health and behavior problems for them. Lead is a hazard to children under 6 years of age in particular. Lead in paint, dust and soil is a problem for c  read more..

Mold Symptoms

Kern County, in the San Joaquin Valley, California, is one of the most highly coccidioidomycosis-endemic regions. The number of new cases of coccidioidomycosis in the area has varied widely from year to year; a low incidence of coccidioidomycosis from 1987 to 1990 (<500 reported cases a year in K  read more..

EPA Asbestos Removal Regulations

RESPIRATORS AND PROTECTIVE CLOTHING ARE REQUIRED IN THIS AREA Prior to June 1, 2016, employers may use the following legend in lieu of that specified in paragraph (j)(4)(ii)(B) of this section:  The employer shall ensure that employees working in  Asbestos Abatement EPA Asbestos Removal Regulations.

  read more..

Government Grants For Homeowners With Mold

The containment area must be maintained under negative pressure relative to surrounding areas. This will ensure that contaminated air does not flow into adjacent areas. This can be done with a HEPA-filtered fan unit exhausted outside of the building. For small, easily contained areas, Mold Remediation Government Grants For Homeowners With Mold   read more..

Women Exposed To Lead Poisoning

Women exposed to lead may experience menstrual disturbances including dysmenorrhea, menorrhagia and amenorrhea. Following exposure to lead, women have a higher frequency of sterility, premature births, spontaneous miscarriages, and stillbirths. Germ cells can be affected by lead and Lead Paint Removal Women Exposed To Lead Poisoning cause genet  read more..

Recover Documents From Smoke Damage

Because refrigeration may cause the paste to lose its tack, keep it at room temperature. It is best to make small batches, since the paste does not usually keep for more than a week. A preservative can be added, Document restoration Recover Documents From Smoke Damage but these chemicals are toxic and not recommended.

Microwave Wheat   read more..

Dealing With Frozen Pipes

Keep open cabinet doors leading to exposed pipes (such as access doors for sinks), so that household air can warm them.The natural flow of warmer air will help combat many problems.If you have an attached garage, keep its doors shut.Occasionally, plumbing is routed through this unheated space, Water Damage Dealing With Frozen Pipes&  read more..

How To Clean Smoke From Walls And Floors After Grease Fires

After the 1974 electronic system fire in Poitiers France, CNET developed what is considered the first modern test of corrosivity [70]. A number of other standards have since been developed that utilize a variety of fire and exposure models as well as several different methods of reporting results. T  read more..

Tools For Restoring Water Damaged Electronics

The electrochemical process involves deposition of a suitable conductive seed layer inside the porous slug.This layer is electrically contacted and the slug is dipped in a doped monomer solution. Electric current is passed through the seed layer into the doped monomer solution stimulating the oxidat  read more..