Electronic Restoration >> Electronic Systems In Flood-damaged Buildings

Electronic Systems in Flood-damaged Buildings
Question: Do electrical systems and equipment submerged through flooding have to be replaced? Answer: Floodwaters are not just water; the water may also be contaminated with chemicals, sewage, oil and other debris. When the floodwater is salt water, Electronic Systems In Flood-damaged Buildings its corrosive effects are particularly damaging. 

Any or all of those can affect the integrity and performance of electrical systems and equipment, either immediately or eventually. Some of the larger types of electrical equipment, such as panelboards, switchboards, certain types of busways, Electronic Systems In Flood-damaged Buildings some types of motor control equipment, circuit breakers, protective relays, meters and current transformers exposed to floodwaters may be reconditioned. 

To recondition any electrical equipment requires that the work be done by qualified personnel and that the original manufacturer be contacted for specific recommendations. In many cases, Electronic Systems In Flood-damaged Buildings it is ultimately safer, less expensive and less time-consuming to replace the equipment. 

Electrical equipment such as outlet and junction boxes, arc fault circuit interrupters (AFCI), ground fault circuit interrupters (GFCI), surge protective devices, switches, receptacles, dimmers, and Electronic Systems In Flood-damaged Buildings lighting fixtures exposed to floodwaters must be replaced. Wiring or cable exposed to floodwaters may or may not be required to be replaced, depending on the type of wire or cable. 

Wire or cable listed for dry locations (such as NM-B) exposed to water must be replaced. Wire or cable that is listed for use in wet locations may remain - provided the ends of the wire or cable have not been exposed to water, and the wire or cable is not damaged. But, Electronic Systems In Flood-damaged Buildings even with wire or cable listed for use in wet locations, when the wire or cable has been exposed to the contaminants found in floodwaters, the manufacturer should be consulted before any decision is made to continue using it. 

Again, in most cases, it is safer, less expensive and less time-consuming to replace the wiring or cable. For more information, Electronic Systems In Flood-damaged Buildings the publication Evaluating Water-Damaged Electrical Equipment by the National Electrical Manufacturers Association (NEMA) contains practical guidelines and understandable explanations about the salvageability of electrical equipment, wiring, and cable.

Question: When evaluating submerged electrical systems and equipment, who is qualified to determine what is damaged and Electronic Systems In Flood-damaged Buildings must be removed, and what is not damaged and may remain? Answer The municipality determines who is qualified to evaluate submerged electrical systems and equipment for damage. 

Electrical contractors, licensed electricians (where required), third-party electrical inspectors, and utility company representatives would be considered qualified, Electronic Systems In Flood-damaged Buildings having the training and knowledge of electrical systems and equipment necessary to evaluate damage caused by contact with floodwaters. The code enforcement official may also recognize other individuals as being qualified, based on other criteria.


Question: It’s been determined that portions of the electrical system and/or equipment in a dwelling are damaged and Electronic Systems In Flood-damaged Buildings have to be removed. What are the requirements for Code compliance? Answer: The requirements for Code compliance depend on whether the work necessary to restore the electrical system and/or equipment to its pre-damaged state is a repair or a Level 1 alteration.

Repairs. If the municipality determines that the restoration work is a repair, the installation of new system components and Electronic Systems In Flood-damaged Buildings equipment do not have to meet new construction standards. A repair is defined as the restoration to good or sound condition of any part of an existing building for the purpose of its maintenance. 

Examples of what could be considered repairs to an electrical system would be the replacement of receptacles, switches, Electronic Systems In Flood-damaged Buildings and light fixtures. Repairs do not normally require a building permit. Level 1 Alterations. If the municipality determines that the restoration work is a Level 1 alteration, the installation of new system components and equipment must comply with the requirements for new construction. 

Level 1 alterations are defined as the removal and replacement or Electronic Systems In Flood-damaged Buildings the covering of existing materials, elements, equipment or fixtures using new materials, elements, equipment or fixtures that serve the same purpose, without reconfiguring the space. Examples of what could be considered Level 1 alterations to an electrical system would be the replacement of panelboards, circuit breakers, and branch circuit wiring. Level 1 alterations require a building permit.

Question: The restoration work to the electrical system in the dwelling has been determined to be a repair. What are the Electronic Systems In Flood-damaged Buildings requirements for Code compliance? Answer: Appendix J Section J4 of the 2010 Residential Code of New York State (RCNYS) contains the provisions for repairs to one- and two-family dwellings and townhouses.

Section J401.3 requires that in a flood hazard area, if the repairs will be a substantial improvement, Electronic Systems In Flood-damaged Buildings the building must comply with the new construction provisions of Section R324. A substantial improvement is any repair or alteration to a building where the cost equals or exceeds 50 percent of the market value of the building before the repairs or alterations were started. 

Section R324.1.5 requires that electrical systems, equipment and Electronic Systems In Flood-damaged Buildings components replaced as part of a substantial improvement meet the requirements of the section, including being located at or above the design flood elevation plus a 2-foot freeboard as specified in Section R324.1.3.3. An exception allows electrical systems, equipment and components to be located below the design flood elevation provided specific conditions are met.

If the repairs will NOT be a "substantial improvement,” and Electronic Systems In Flood-damaged Buildings in most cases, they are not, compliance with Section J407 is all that is required. Section J407 allows existing electrical wiring and equipment to be repaired or replaced with like materials, with some exceptions.

Question: The Electronic Systems In Flood-damaged Buildings restoration work to the electrical system in the dwelling has been determined to be a Level 1 alteration. What are the requirements for Code compliance? Answer: Appendix J Section J5 of the 2010 Residential Code of New York State (RCNYS) contains the provisions for Level 1 alterations to one- and two-family dwellings and townhouses.

Section J501.3 requires that in a flood hazard area, if the alterations will be a substantial improvement, Electronic Systems In Flood-damaged Buildings the building must comply with the new construction provisions of Section R324. Section R324.1.5 requires that electrical systems, equipment and components replaced as part of a substantial improvement meet the requirements of the section, including being located at or above the design flood elevation plus a 2-foot freeboard as specified in Section R324.1.3.3. 

An exception allows electrical systems, equipment and Electronic Systems In Flood-damaged Buildings components to be located below the design flood elevation provided specific conditions are met. If the alterations will NOT be a substantial improvement, compliance with Section J508 is required. Section J508 requires that any alteration made to the electrical system meet the requirements for new construction found in Chapters E33 through E42.

Question: It’s been determined that portions of the electrical system Electronic Systems In Flood-damaged Buildings and/or equipment in a building (which isn’t a one- or two-family dwelling or a townhouse) were damaged and have to be removed. What are the requirements for Code compliance for that building? 

Answer: Repairs or alterations to buildings that are not one- or two-family dwellings or townhouses must be made in compliance with the 2010 Existing Building Code of New York State (EBCNYS). The municipality will still determine whether the Electronic Systems In Flood-damaged Buildings buildings are undergoing repairs or Level 1 alterations. Alterations or repairs may comply with Section 302.6 of Chapter 3 Prescriptive Compliance Method of the EBCNYS. 

Alternatively, Chapter 5 of the EBCNYS contains the provisions for repairs, Electronic Systems In Flood-damaged Buildings and Chapter 6 contains the provisions for Level 1 alterations. The requirements in Chapters 3, 5 and 6 are similar to those in Appendix J – repairs or alterations to buildings in a flood hazard area that are substantial improvements require compliance with Section 1612 Flood Loads of the 2010 Building Code of New York State.

Electrical systems and equipment exposed to the contaminants in floodwaters must be carefully evaluated by qualified personnel. While some electrical equipment and Electronic Systems In Flood-damaged Buildings system components may be reconditioned or salvaged, in most cases, it is safer, less expensive and less time-consuming to replace them. 

The municipality will determine if the Electronic Systems In Flood-damaged Buildings work necessary to restore the electrical system components and/or equipment in a structure to its pre-damaged state will be a repair or a Level 1 alteration. The requirements for Code compliance are based on that determination.

Mold Remediation

Meth Lab Cleanup Mold Remediation, that are used to make the unlawful drug methamphetamine, are found manufacturing in houses, rented apartments, motel rooms, side sheds, and even motor vehicles. Federal, state and local law enforcement were credited in the appropriation of thousands of meth labs across the country, and   read more..

Certifications For Asbestos Pipe Removal

Analytical Procedure: A portion of the sample filter is cleared and prepared for asbestos fiber counting by Phase Contrast Microscopy (PCM) at 400X. Commercial manufacturers and products mentioned in this method are for descriptive use only and do not constitute endorsements by USDOL-OSHA. Similar p  read more..

Asbestos Abatement Contractors

Aggressive sampling. "Aggressive sampling" shall mean a method of sampling in which the individual collecting the air sample creates activity by the use of mechanical equipment during the sampling period to stir up settled dust and simulate activity in that area of the building. AHERA. "AHER" shall   read more..

How To Help A Hoarder

In some cases, the best option would be to put the property into a receivership under Health & The City would ask the court to appoint a receiver who would take over the property and would have the power to make arrangements for repairs, cleanup, or sale. The receiver would work with the Hoarding How To Help A Hoarder in  read more..

How To Clean Up A Flooded Crawl Space

The treatment needed for these fungi is to trace the fungus back to its source of moisture, usually the ground, and cut off the connection. Often it comes up through a brace, frame, wooden concrete form, or grade stake that serves as a bridge to let the fungus grow from moist soil to a joist or sill  read more..

Sewer Odor In The Home

Sewer Gas Odors Property owners should check for and secure any open plumbing waste lines they may have before a problem occurs.Sewer gas could be flammable, displace oxygen or contain toxic materials that should not be inhaled and could be a serious threat to life and health. Wastewaters contain sm  read more..

Extraction Of Flood Water And Mold

Molds are microscopic organisms found everywhere in the environment, indoors and outdoors. When present in large quantities, molds have the potential to cause adverse health effects. Health Effects of Mold Exposure Sneezing Cough and Water Extraction Extraction Of Flood Water And Mold congestion Runny nose Aggravation of asthma Eye irr  read more..

Reading A Radon Detector

In order to become or remain listed, new applicants and existing participants must meet a number of programmatic requirements. Participation in the Program is voluntary; there is no Federal requirement that radon service providers participate. However, Radon Mitigation Reading A Radon Detector some state and local governments  read more..

Animal Hoarders

BEHIND CLOSED DOORS: THE HORRORS OF ANIMAL HOARDERS By Rebecca Simmons To someone desperate to find a home for a litter of kittens, the Chubbers Animal Rescue would have appeared to be the perfect haven. Nestled in a wooded lot in Caroline County, Maryland, the former home of Linda Farve and Ernie M  read more..

Recovering Hurricane Katrina

Attachment of Brick Veneer in High-Wind Regions Hurricane Katrina Recovery Advisory FEMA December 2005 Purpose: To recommend practices for installing brick veneer that will enhance wind resistance in high-wind areas. Key Issues. Brick veneer is frequently blown off Wind Damage Recovering Hurricane Katrina walls of resid  read more..