Asbestos Abatement >> Abatement Asbestos

The following asbestos control program rules, shall apply to all asbestos abatement activities occurring within the City of New York. (b) Every owner of a building where asbestos abatement activity occurs shall be responsible for the performance of the asbestos abatement activities by his/her agent, contractor, employee, or other representative. (c) Every Abatement Asbestos contractor and worker engaged in asbestos abatement activities shall comply with the provisions of this chapter except as otherwise specified. (d) Every investigator engaged to identify the presence and evaluate the condition of asbestos in a building or structure shall comply with the provisions of this chapter except as otherwise specified.

(e) No person shall knowingly make a false statement or submit a false document to the Department as to any matter concerning an asbestos project or any document required to be filed under these rules. (f) The department may inspect at a reasonable time and in a reasonable manner anything which affects or may affect the emission or release of asbestos fibers or Abatement Asbestos the disturbance of asbestos-containing material, including but not limited to the premises where an asbestos project is being conducted, or the premises for which a notification has been filed under § 1-21 – § 1-26 of these Rules, or the premises where an application has been filed with the Department of Buildings for a plan or permit approval.

(g) No person shall interfere with or obstruct any employee of the Department in the performance of their official duties, including but not limited to the performance of inspections. (h) No person who holds a certificate issued pursuant to these rules shall engage in unprofessional conduct. Unprofessional conduct shall include but is not limited to: (1) Failure to comply with provisions of Federal, State or local laws, rules, or Abatement Asbestos regulations. (2) Conduct in asbestos inspections, assessment, abatement activities, air sampling, etc. which evidences moral unfitness. (3) Making or filing a false report, or failing to file a report required by these rules or impeding or obstructing such filing, or inducing another person to do so.

(i) The size (amount of material to be disturbed or, in the case of cleanups, the dimensions of the area to be cleaned) and scope of the overall project shall control the notification to be filed and work procedures to be followed. The requirements set forth in these rules may not be avoided or lessened through the performance of work in increments or piecemeal fashion. (j) (1) Any person, including but not limited to contractors, building owners, and air monitoring companies, who is in violation of or fails to comply with any provision of these rules or the terms and conditions of any variance issued pursuant to these Abatement Asbestos rules shall be subject to the issuance of notice(s) of violation and other civil and criminal enforcement actions pursuant to Title 24, Chapter 1, Subchapter 9 of the Administrative Code of the City of New York.

(2) The maximum civil penalty for any violation of a lettered subsection of these rules, pursuant to a notice of violation returnable before the Environmental Control Board, shall be $10,000, except that a violation of section 1-26 shall carry a maximum penalty of $15,000. (3) DEP may deny any application for an asbestos abatement permit pursuant to section 1-26 of these rules, or a variance application pursuant to section 1-03 of these rules, where any party to the asbestos project, including but not limited to the abatement contractor, building owner, and air monitoring Abatement Asbestos company, has docketed, unpaid civil penalties imposed by the Environmental Control Board for violations of these rules, sections 24-146.1 and 24-146.3 of the Administrative Code, or NYSDOL ICR 56. § 1-02 Definitions.

Abatement. "Abatement” shall mean any and all procedures physically taken to control fiber release from asbestos-containing materials. This includes removal, encapsulation, enclosure, cleanup and repair. Abatement activities. "Abatement activities” shall mean all Abatement Asbestos activities from the initiation of work area preparation through successful clearance air monitoring performed at the conclusion of an asbestos project or minor project. Adequately wet. "Adequately wet” shall mean the complete penetration of a material with amended water to prevent the release of particulates. If visible emissions are observed coming from asbestos-containing material, then the material has not been adequately wetted.

However, the absence of visible emissions is not evidence of being adequately wet. ACM must be fully penetrated with the wetting agent in order to be considered adequately wet. If the ACM being abated is resistant to amended water penetration, wetting agent shall be applied to the material prior to and during removal as necessary to minimize fiber release.

Is Damage By A Squirrel Covered By Homeowners Ins

The progressive loss of Iowa's woodlands and farmlands to development is increasing the chance for conflicts between humans and wildlife. Social trends, such as increased urbanization, increased populations of certain wildlife species, and finite government resources have combined to provide the   read more..

Mold Detector

Assess the size of the mold and/or moisture problem and the type of damaged materials before planning the remediation work. Select a remediation manager for medium or large jobs (or small jobs requiring more than one person). The remediation plan should include steps to fix the water or moisture pro  read more..

Storm Wind Damage Scale

Area affected by the July 4, 1969 derecho (outlined in blue), with the approximate hourly positions of the leading edge of derecho winds (gust front) indicated by curved purple lines. Arrows indicate direction of storm winds. During the afternoon of Friday, July 4, 1969, Wind Damage Storm Wind Damage Scale thunderstorms  read more..

How To Get Rid Of Sewage

Overhead Sewers. The basement floor drain and any plumbing fixtures in the lower levels of your house that have experienced backups will be disconnected from the sewer system. Plumbing from those fixtures will be re-routed to a sealed tank. Inside the tank,an ejector pump lifts the waste water up se  read more..

Storm Damage Roof Insurance Claim

Special hazards posed by derechos in urban areas Whether in an urban or rural area, those out-of-doors are at greatest risk of being killed or injured in a derecho. But of particular significance in urban areas is the vulnerability of electrical lines to high winds and Wind Damage Storm Damage Roof Insurance Claim falling trees.&  read more..

Flood Water Backing Up

Steps to Responding to a Water Emergency The Water Department is dedicated to providing San Diego with a safe and reliable water supply. While the Water Operations Division and Capital Improvements Program help to maintain and improve our water system, Water Damage Flood Water Backing Up unexpected water emergencies sti  read more..

Storm Damage Roof Leak

Hygrothermal building component simulation requires a complete set of storage and transport functions. Such functions are typically determined by the aid of material models defining a set of functions that are adjusted to basic material data. Basic material data consists of either single parameters   read more..

Remove Lead Paint From Concrete

Lead is one of the most significant and widespread environmental hazards for children in Maryland. Children are at greatest risk from birth to age six while their neurological systems are developing. Sustained exposure to lead can cause long lasting neurological damage or death. Effects of sustained  read more..

How To Restore Water Damaged Electronics

Prohibited Finishes for Metal Shell Connectors, Contacts, Terminals and Terminal Lugs.Cadmium, zinc, chemically coated cadmium or zinc, or silver shall not be used as a connector or contact finish. Silver shall also not be used as an under plate, and shall not be used as a finish due to corrosion co  read more..

Black Mold Exposure

Although the largest group of patients had diffuse pulmonary infiltrates, a significant fraction had focal pulmonary disease, meningitis, Mold Remediation Black Mold Exposure or other extrapulmonary disease. Six patients had only a positive serologic test with no other evidence of infection. Excluding the patients who ha  read more..