Asbestos Abatement >> Abatement Asbestos

The following asbestos control program rules, shall apply to all asbestos abatement activities occurring within the City of New York. (b) Every owner of a building where asbestos abatement activity occurs shall be responsible for the performance of the asbestos abatement activities by his/her agent, contractor, employee, or other representative. (c) Every Abatement Asbestos contractor and worker engaged in asbestos abatement activities shall comply with the provisions of this chapter except as otherwise specified. (d) Every investigator engaged to identify the presence and evaluate the condition of asbestos in a building or structure shall comply with the provisions of this chapter except as otherwise specified.

(e) No person shall knowingly make a false statement or submit a false document to the Department as to any matter concerning an asbestos project or any document required to be filed under these rules. (f) The department may inspect at a reasonable time and in a reasonable manner anything which affects or may affect the emission or release of asbestos fibers or Abatement Asbestos the disturbance of asbestos-containing material, including but not limited to the premises where an asbestos project is being conducted, or the premises for which a notification has been filed under § 1-21 – § 1-26 of these Rules, or the premises where an application has been filed with the Department of Buildings for a plan or permit approval.

(g) No person shall interfere with or obstruct any employee of the Department in the performance of their official duties, including but not limited to the performance of inspections. (h) No person who holds a certificate issued pursuant to these rules shall engage in unprofessional conduct. Unprofessional conduct shall include but is not limited to: (1) Failure to comply with provisions of Federal, State or local laws, rules, or Abatement Asbestos regulations. (2) Conduct in asbestos inspections, assessment, abatement activities, air sampling, etc. which evidences moral unfitness. (3) Making or filing a false report, or failing to file a report required by these rules or impeding or obstructing such filing, or inducing another person to do so.

(i) The size (amount of material to be disturbed or, in the case of cleanups, the dimensions of the area to be cleaned) and scope of the overall project shall control the notification to be filed and work procedures to be followed. The requirements set forth in these rules may not be avoided or lessened through the performance of work in increments or piecemeal fashion. (j) (1) Any person, including but not limited to contractors, building owners, and air monitoring companies, who is in violation of or fails to comply with any provision of these rules or the terms and conditions of any variance issued pursuant to these Abatement Asbestos rules shall be subject to the issuance of notice(s) of violation and other civil and criminal enforcement actions pursuant to Title 24, Chapter 1, Subchapter 9 of the Administrative Code of the City of New York.

(2) The maximum civil penalty for any violation of a lettered subsection of these rules, pursuant to a notice of violation returnable before the Environmental Control Board, shall be $10,000, except that a violation of section 1-26 shall carry a maximum penalty of $15,000. (3) DEP may deny any application for an asbestos abatement permit pursuant to section 1-26 of these rules, or a variance application pursuant to section 1-03 of these rules, where any party to the asbestos project, including but not limited to the abatement contractor, building owner, and air monitoring Abatement Asbestos company, has docketed, unpaid civil penalties imposed by the Environmental Control Board for violations of these rules, sections 24-146.1 and 24-146.3 of the Administrative Code, or NYSDOL ICR 56. § 1-02 Definitions.

Abatement. "Abatement” shall mean any and all procedures physically taken to control fiber release from asbestos-containing materials. This includes removal, encapsulation, enclosure, cleanup and repair. Abatement activities. "Abatement activities” shall mean all Abatement Asbestos activities from the initiation of work area preparation through successful clearance air monitoring performed at the conclusion of an asbestos project or minor project. Adequately wet. "Adequately wet” shall mean the complete penetration of a material with amended water to prevent the release of particulates. If visible emissions are observed coming from asbestos-containing material, then the material has not been adequately wetted.

However, the absence of visible emissions is not evidence of being adequately wet. ACM must be fully penetrated with the wetting agent in order to be considered adequately wet. If the ACM being abated is resistant to amended water penetration, wetting agent shall be applied to the material prior to and during removal as necessary to minimize fiber release.

Asbestos Removal Courses In Wisconsin

"Category II nonfriable" is defined as "any material, excluding category I nonfriable, containing ... asbestos ... that ... cannot be crumbled ... to powder by hand pressure." This includes rigid exterior siding and boards by the trade name "transite". Category II Asbestos Abatement Asbestos Removal Courses In Wisconsin may not   read more..

How To Stop Mold In A Basement Closet

Controlling Moisture
In general, you should address the following issues when remodeling your home. Read about Best Practices
 Using Barriers to Contain Dust and other Pollutants Combustion Appliance Backdrafting Using Ventilation Basement Drying How To Stop Mold In A Basement Closet to Contain Dust  read more..

Mold Abatement Regulations

This article presents remediation guidelines for building materials that have or are likely to have mold growth. The guidelines are designed to protect the health of cleanup personnel and other workers during remediation. These guidelines are based on the size of the area impacted by mold contaminat  read more..

Fire Smoke Restoration Procedures

Recommendations for the Selection and Use of Protective Clothing and Respirators Against Biological Agents Resulting from a Suspected or Known Terrorism Event The recommendations for personal protective equipment, including respiratory protection and protective clothing, are based upon the anticipat  read more..

How To Dry Out Your Water Damaged Basement

Manage exterior ground and rain water by using gutters and downspouts and by grading the ground around the perimeter at least six inches of fall over ten feet of run. Install a foundation drain Basement Drying How To Dry Out Your Water Damaged Basement surrounded by gravel and enclosed by filter fabric. Apply either damp-proofing or water-proofing  read more..

Remove Smoke Odor From Electronics

One of these rooms (the museum boardroom) was used to store kits of soot cleanup clothing and cleaning materials and supplies and was also used as a staff room and change room. The second and third rooms were designated to receive the first of the salvaged displays and artifacts that would be r  read more..

How To Refurbish An Apartment After Tenants Trash

When a landlord and tenant get along well, things are better all around. Dealing with unhappy tenants is alot of trouble for a landlord, and few tenants want the inconvenience and expense of moving simplybecause they cannot get along with their landlords.Yet, Tenant Move Out Cleanup How To Refurbish An Apartment After Tenants Trash landlords and tenants fre  read more..

Basement Drying

When a Fire Damage Basement Drying strikes, many lives could be suddenly turned upside down, many times the hardest part is knowing exactly where to start and who you should contact. The Federal Emergency Management Agency’s (FEMA) along with the United States Fire Administration (USFA) has collected the foll  read more..

Sewage Backup During Flooding

Protecting Your Home From Back Flow The sewage/septic system is designed to remove sewage from a house. If flood water enters the system, the sewage can backup and enter your home. To help prevent this, install a backflow valve in the sewer line. The backflow valve is opened by the flow of sewage ex  read more..

How To Dehumidify A Water Damaged Crawl Space

NYSERDA - Energy. Innovation. Solutions. Dehumidification Whole-House Dehumidification Systems Whole-House Dehumidification Systems tie into your existing ductwork and remove humidity without running a full air conditioner. Since they do not need to cool the air, Dehumidification How To Dehumidify A Water Damaged Crawl Space they use a lot less e  read more..