Asbestos Abatement >> Abatement Asbestos

The following asbestos control program rules, shall apply to all asbestos abatement activities occurring within the City of New York. (b) Every owner of a building where asbestos abatement activity occurs shall be responsible for the performance of the asbestos abatement activities by his/her agent, contractor, employee, or other representative. (c) Every Abatement Asbestos contractor and worker engaged in asbestos abatement activities shall comply with the provisions of this chapter except as otherwise specified. (d) Every investigator engaged to identify the presence and evaluate the condition of asbestos in a building or structure shall comply with the provisions of this chapter except as otherwise specified.

(e) No person shall knowingly make a false statement or submit a false document to the Department as to any matter concerning an asbestos project or any document required to be filed under these rules. (f) The department may inspect at a reasonable time and in a reasonable manner anything which affects or may affect the emission or release of asbestos fibers or Abatement Asbestos the disturbance of asbestos-containing material, including but not limited to the premises where an asbestos project is being conducted, or the premises for which a notification has been filed under § 1-21 – § 1-26 of these Rules, or the premises where an application has been filed with the Department of Buildings for a plan or permit approval.

(g) No person shall interfere with or obstruct any employee of the Department in the performance of their official duties, including but not limited to the performance of inspections. (h) No person who holds a certificate issued pursuant to these rules shall engage in unprofessional conduct. Unprofessional conduct shall include but is not limited to: (1) Failure to comply with provisions of Federal, State or local laws, rules, or Abatement Asbestos regulations. (2) Conduct in asbestos inspections, assessment, abatement activities, air sampling, etc. which evidences moral unfitness. (3) Making or filing a false report, or failing to file a report required by these rules or impeding or obstructing such filing, or inducing another person to do so.

(i) The size (amount of material to be disturbed or, in the case of cleanups, the dimensions of the area to be cleaned) and scope of the overall project shall control the notification to be filed and work procedures to be followed. The requirements set forth in these rules may not be avoided or lessened through the performance of work in increments or piecemeal fashion. (j) (1) Any person, including but not limited to contractors, building owners, and air monitoring companies, who is in violation of or fails to comply with any provision of these rules or the terms and conditions of any variance issued pursuant to these Abatement Asbestos rules shall be subject to the issuance of notice(s) of violation and other civil and criminal enforcement actions pursuant to Title 24, Chapter 1, Subchapter 9 of the Administrative Code of the City of New York.

(2) The maximum civil penalty for any violation of a lettered subsection of these rules, pursuant to a notice of violation returnable before the Environmental Control Board, shall be $10,000, except that a violation of section 1-26 shall carry a maximum penalty of $15,000. (3) DEP may deny any application for an asbestos abatement permit pursuant to section 1-26 of these rules, or a variance application pursuant to section 1-03 of these rules, where any party to the asbestos project, including but not limited to the abatement contractor, building owner, and air monitoring Abatement Asbestos company, has docketed, unpaid civil penalties imposed by the Environmental Control Board for violations of these rules, sections 24-146.1 and 24-146.3 of the Administrative Code, or NYSDOL ICR 56. § 1-02 Definitions.

Abatement. "Abatement” shall mean any and all procedures physically taken to control fiber release from asbestos-containing materials. This includes removal, encapsulation, enclosure, cleanup and repair. Abatement activities. "Abatement activities” shall mean all Abatement Asbestos activities from the initiation of work area preparation through successful clearance air monitoring performed at the conclusion of an asbestos project or minor project. Adequately wet. "Adequately wet” shall mean the complete penetration of a material with amended water to prevent the release of particulates. If visible emissions are observed coming from asbestos-containing material, then the material has not been adequately wetted.

However, the absence of visible emissions is not evidence of being adequately wet. ACM must be fully penetrated with the wetting agent in order to be considered adequately wet. If the ACM being abated is resistant to amended water penetration, wetting agent shall be applied to the material prior to and during removal as necessary to minimize fiber release.

Earthquakes

Recent earthquakes around the world show a pattern of steadily increasing damages and losses that are due primarily to two factors: (1) significant growth in earthquake-prone urban areas and (2) vulnerability of the older building stock, Flood Damage Earthquakes including buildings constructed within the past 20 yea  read more..

Raw Sewage Is A Major Health Hazard

The City of Decatur has a sewer user fee that was established in April 1998. The sewer user fee was set at a rate of $0.34 per one hundred cubic feet of water used for residential, commercial, and light industrial users. The City also has a rate of $0.45 per one hundred cubic feet for water that is   read more..

How To Dehumidify A Water Damaged Basement

Purified water and feed water samples from cooper tubing condenser test was analyzed in Dehumidification How To Dehumidify A Water Damaged Basement this experiment. The ion removal efficiency is defined as ion concentration difference of the feed and purified water versus feed ion concentration. It present as equation as follow: 
  read more..

Smoke Damage

I discovered Tenant Move Out Cleanup Smoke Damage after the tenants moved out. Smoke damage does not always have to result from having a fire in your home. My tenants moved out and I did not realize how serious their cigarette smoking addiction was. Upon walking into the rental the smell was obvious and the yellow discolora  read more..

Mold Caused By Basement Flooding

FREQUENTLY ASKED QUESTIONS ABOUT FLOODING, MOLDS, AND HEALTH Q. What does "thoroughly washed" mean? A. Washed in hot, soapy water. Q. What should I do about the floors, walls, and ceilings? A. Vinyl floors, drywall, insulation, and in some cases ceilings should be removed Mold Remediation Mold Caused By Basement Flooding and replaced  read more..

Crime Scene Photos

This report describes states' laws that directly address the disclosure of crime scene photographs, autopsy reports, and 911 tapes and transcripts. We conducted a 50-state survey and found (1) nine states that have laws directly addressing the disclosure of Crime Scene Cleanup Crime Scene Photos scene photos, (2) 26 states with laws  read more..

Water Extration Prices

Chemical analyses included radionuclides, majorand trace elements, and organic compounds. Qualityassurance samples were analyzed with each set of environmental samples for all constituents except radionuclides (table 2, atend of report), Water Extraction Water Extration Prices which used different quality-assurance methods.  read more..

Fire Smoke Smell From Apartment

The conservators' first assignment was to clean one gallery (the Earth Sciences Gallery) so that the museum could reopen as quickly as possible. On the third week following the fire, building cleaners had Odor Control Fire Smoke Smell From Apartment completed their first and second cleaning passes, and it was possible for the conserv  read more..

Health Risks From Lead Paint

Zinc protoporphyrin results from the inhibition of the enzyme ferrochelatase which catalyzes the insertion of an iron molecule into the protoporphyrin molecule, which then becomes heme. If iron is not inserted into the molecule then zinc, having a greater affinity for protoporphyrin, takes the place  read more..

Eliminate Mold And Mildew On Basement Walls

Permitting
 You or your moving contractor will have to obtain permits to move the house on public roads or other rights-of-way. These permits may be required by local governments, highway departments, and Basement Drying Eliminate Mold And Mildew On Basement Walls utility companies, not only in the jurisdiction from which your ho  read more..