Asbestos Abatement >> Abatement Asbestos

The following asbestos control program rules, shall apply to all asbestos abatement activities occurring within the City of New York. (b) Every owner of a building where asbestos abatement activity occurs shall be responsible for the performance of the asbestos abatement activities by his/her agent, contractor, employee, or other representative. (c) Every Abatement Asbestos contractor and worker engaged in asbestos abatement activities shall comply with the provisions of this chapter except as otherwise specified. (d) Every investigator engaged to identify the presence and evaluate the condition of asbestos in a building or structure shall comply with the provisions of this chapter except as otherwise specified.

(e) No person shall knowingly make a false statement or submit a false document to the Department as to any matter concerning an asbestos project or any document required to be filed under these rules. (f) The department may inspect at a reasonable time and in a reasonable manner anything which affects or may affect the emission or release of asbestos fibers or Abatement Asbestos the disturbance of asbestos-containing material, including but not limited to the premises where an asbestos project is being conducted, or the premises for which a notification has been filed under § 1-21 – § 1-26 of these Rules, or the premises where an application has been filed with the Department of Buildings for a plan or permit approval.

(g) No person shall interfere with or obstruct any employee of the Department in the performance of their official duties, including but not limited to the performance of inspections. (h) No person who holds a certificate issued pursuant to these rules shall engage in unprofessional conduct. Unprofessional conduct shall include but is not limited to: (1) Failure to comply with provisions of Federal, State or local laws, rules, or Abatement Asbestos regulations. (2) Conduct in asbestos inspections, assessment, abatement activities, air sampling, etc. which evidences moral unfitness. (3) Making or filing a false report, or failing to file a report required by these rules or impeding or obstructing such filing, or inducing another person to do so.

(i) The size (amount of material to be disturbed or, in the case of cleanups, the dimensions of the area to be cleaned) and scope of the overall project shall control the notification to be filed and work procedures to be followed. The requirements set forth in these rules may not be avoided or lessened through the performance of work in increments or piecemeal fashion. (j) (1) Any person, including but not limited to contractors, building owners, and air monitoring companies, who is in violation of or fails to comply with any provision of these rules or the terms and conditions of any variance issued pursuant to these Abatement Asbestos rules shall be subject to the issuance of notice(s) of violation and other civil and criminal enforcement actions pursuant to Title 24, Chapter 1, Subchapter 9 of the Administrative Code of the City of New York.

(2) The maximum civil penalty for any violation of a lettered subsection of these rules, pursuant to a notice of violation returnable before the Environmental Control Board, shall be $10,000, except that a violation of section 1-26 shall carry a maximum penalty of $15,000. (3) DEP may deny any application for an asbestos abatement permit pursuant to section 1-26 of these rules, or a variance application pursuant to section 1-03 of these rules, where any party to the asbestos project, including but not limited to the abatement contractor, building owner, and air monitoring Abatement Asbestos company, has docketed, unpaid civil penalties imposed by the Environmental Control Board for violations of these rules, sections 24-146.1 and 24-146.3 of the Administrative Code, or NYSDOL ICR 56. § 1-02 Definitions.

Abatement. "Abatement” shall mean any and all procedures physically taken to control fiber release from asbestos-containing materials. This includes removal, encapsulation, enclosure, cleanup and repair. Abatement activities. "Abatement activities” shall mean all Abatement Asbestos activities from the initiation of work area preparation through successful clearance air monitoring performed at the conclusion of an asbestos project or minor project. Adequately wet. "Adequately wet” shall mean the complete penetration of a material with amended water to prevent the release of particulates. If visible emissions are observed coming from asbestos-containing material, then the material has not been adequately wetted.

However, the absence of visible emissions is not evidence of being adequately wet. ACM must be fully penetrated with the wetting agent in order to be considered adequately wet. If the ACM being abated is resistant to amended water penetration, wetting agent shall be applied to the material prior to and during removal as necessary to minimize fiber release.

How To Repair Smoke Damage From Fire

For the second time this month, Fire Damage How To Repair Smoke Damage From Fire another state joined the national movement to enhance public safety by mandating that all cigarettes sold in their state be "fire-safe.” Such cigarettes are less likely to ignite fires if dropped or carelessly discarded.

Tod  read more..

How To Remove Fire Smoke Smell From Apartment

Proper selection of PPE for individual responders must be based upon a careful assessment of two factors: (1) the hazards anticipated to be present, or are present at the scene and (2) the probable impact of those hazards, based upon the mission role of the individual. The emergency responder must b  read more..

How To Restore Water Damaged Electronics

Prohibited Finishes for Metal Shell Connectors, Contacts, Terminals and Terminal Lugs.Cadmium, zinc, chemically coated cadmium or zinc, or silver shall not be used as a connector or contact finish. Silver shall also not be used as an under plate, and shall not be used as a finish due to corrosion co  read more..

Removing The Smoke Odor

If aerial fire retardant or firefighting foam residue is present on the house or automobiles, use a mild detergent and brushes to scrub and dilute the dried residue and flush it from the surfaces and rinse with clean water. Persons engaged in these cleaning activities may wish to wear respiratory pr  read more..

Toxic Mold Decontamination Remediation

Concern about indoor exposure to mold has been increasing as the public becomes aware that exposure to mold can cause a variety of health effects and symptoms, including allergic reactions. This document presents guidelines for the remediation/cleanup of mold and moisture problems in schools and com  read more..

Asbestos Removal Cost


Top of Form Asbestos removal cost Professionals: Who Are They And What Can They Do? Asbestos removal cost professionals are trained in handling asbestos  read more..

Flood Water Safely

Is my drinking water under a boil water notice? Response for private wells If your home gets its water from a private, individual well, then the boil water notices that are issued by public water systems do not apply to you. But this does not necessarily mean Water Damage Flood Water Safely that your water is s  read more..

Mesothelioma


Stages of Malignant Mesothelioma After malignant mesothelioma has been diagnosed, Asbestos Abatement Mesothelioma tests are done to find out if cancer cells have spread to other p  read more..

How To Know If Someone Is A Compulsive Hoarder

Town of Arlington launched a newly formed Hoarding Response Team (hereinafter HRT) in the summer of 2011. Representatives of the Arlington Health Department and the Arlington Police Department began meeting formally to discuss the formation and structure of such a team in May 2011. Hoarding cases we  read more..

Asbestos Abatement Jobs


  read more..