Aggressive sampling. "Aggressive sampling" shall mean a method of sampling in which the individual collecting the air sample creates activity by the use of mechanical equipment during the sampling period to stir up settled dust and simulate activity in that area of the building. AHERA. "AHER" shall mean the Asbestos Hazard Emergency Response Act of 1986. AIHA. "AIH" shall mean the American Industrial Hygiene Association. Airlock. "Airlock" shall mean a system for permitting entrance and exit while restricting air movement between a contaminated Asbestos Abatement Contractors area and an uncontaminated area. It consists of two curtained doorways separated by a distance of at least three feet such that one passes through one doorway into the airlock.

Allowing the doorway sheeting to overlap and close off the opening before proceeding through the second doorway, thereby preventing flow-through contamination. Air sampling. "Air sampling" shall mean the process of measuring the fiber content of a known volume of air collected during a specific period of time. The Asbestos Abatement Contractors procedure utilized for asbestos follows the NIOSH Standard Analytical Method 7400 or the provisional transmission electron microscopy methods developed by the USEPA and/or National Institute of Science and Technology which are utilized for lower detectability and specific fiber identification. Ambient air monitoring.

"Ambient air monitoring" shall mean measurement or determination of airborne asbestos fiber concentrations outside but in the general vicinity of the worksite. Amended water. "Amended water" shall mean water to which a surfactant has been added. ANSI. "ANSI" shall mean the American National Standards Institute. Area air sampling. "Area air sampling" shall mean any form of air sampling or Asbestos Abatement Contractors monitoring where the sampling device is placed at some stationary location. Asbestos. "Asbestos" shall mean any hydrated mineral silicate separable into commercially usable fibers, including but not limited to chrysotile (serpentine), amosite (cumingtonite-grunerite), crocidolite (riebeckite), tremolite, anthrophyllite and actinolite. Asbestos-containing material.

"Asbestos-containing material" (ACM) shall mean asbestos or any material containing more than one percent asbestos. Asbestos-containing waste material. "Asbestos-containing waste material" shall mean asbestos-containing material or asbestos-contaminated objects requiring disposal. Asbestos-contaminated objects. "Asbestos-contaminated objects" shall mean any Asbestos Abatement Contractors objects which have been contaminated by asbestos or asbestos-containing material. Asbestos assessment report. "Asbestos assessment report" shall mean the "Form ACP-5" form, as approved by DEP, by which a DEP-certified asbestos investigator certifies that a building or structure (or portion thereof) is free of ACM or the amount of ACM to be abated constitutes a minor project.

Asbestos handler. "Asbestos handler" shall mean an individual certified by the Department who disturbs, removes, encapsulates, repairs, or encloses asbestos material. Asbestos handler supervisor. "Asbestos handler supervisor" shall mean an individual certified by the Department who supervises the handlers during an asbestos project and ensures that proper asbestos abatement Asbestos Abatement Contractors procedures as well as individual safety procedures are being adhered to. Asbestos project notification. "Asbestos project notification" shall mean the "Form ACP-7" asbestos project notification form as approved by DEP. Asbestos investigator.

"Asbestos investigator" shall mean an individual certified by the Commissioner as having satisfactorily demonstrated his or her ability to identify the presence and evaluate the condition of asbestos in a building or structure. Asbestos project. "Asbestos project" shall mean any form of work performed in a building or structure or in connection with the replacement or repair of equipment, pipes, or electrical equipment not located in a building or structure which will disturb (e.g., remove, enclose, encapsulate) more than 25 linear feet or more than 10 square feet of asbestos-containing material. ASTM. "ASTM" shall mean the American Society For Testing and Materials. Authorized Asbestos Abatement Contractors visitor.

"Authorized visitor" shall mean the building owner and his/her representative, and any representative of a regulatory or other agency having jurisdiction over the project. Building owner. "Building owner" shall mean the person in whom legal title to the premises is vested unless the premises are held in land trust, Asbestos Abatement Contractors in which instance building owner means the person in whom beneficial title is vested. Building materials. "Building materials" shall mean any and all materials listed as Presumed Asbestos Containing Materials (PACM) and Suspect Miscellaneous ACM in NYSDOL ICR 56, including but not limited to interior and exterior finishes, equipment, plaster, roofing, flooring, caulking, sealants, tiles, insulation, and mortar and refractory bricks used in the construction of boilers.

Certified industrial hygienist. "Certified industrial hygienist" (CIH) shall mean an individual who is currently certified by] the American Board of Industrial Hygiene. Certified safety professional (CSP). "Certified safety professional" (CSP) shall mean an individual having a bachelor’s degree from an accredited college or university and a minimum of four years experience as a safety professional and who has successfully completed both levels of the Asbestos Abatement Contractors examination administered by the Board of Certified Safety Professionals and who is currently certified by that Board.

Mold Inside The Wall From A Plumbing Leak

By The Post-Standard Syracuse, NY -- The daily doses of rain that have fallen on Central New York this spring may have some Syracuse area residents ready to call Noah for a reservation. The region has received at least a trace of rain every day since April 16. Since then, Mold Remediation Mold Inside The Wall From A Plumbing Leak about 8 inch  read more..

Remove The Smell Of Smoke Damage

The particular characteristics of soot and the way it bonds to surfaces indicate that vacuuming and other dry-surface-cleaning methods are the first lines of defense in soot removal. Wet-cleaning can be less successful, particularly if the unique characteristics of soot are not taken into  read more..

Fema Flood Zones And Debris Disposal

Household Chemicals (i.e., Household Hazardous Waste (HHW)) can be taken to a county or municipal HHW facility for recycling or potentially reuse. Check with your local environmental health representative to see if a temporary HHW collection site has been established. If HHW cannot safely be removed  read more..

Do It Yourself Restoration Of Mold Damage On Paper

Although it is neither necessary nor desirable to remove all dirt or discoloration from old papers, surface cleaning sometimes improves the appearance of an artifact. Surface cleaning can also remove substances that might eventually damage paper, or that could be transferred to other papers during h  read more..

California Asbestos Tile Removal Requirements

Identifying hazardous materials before starting work on a project site protects worker health and safety, building occupants, and the financial viability of the project. Doing this up front can help you choose the appropriate inspectors, consultants and contractors and avoid costly change orders or  read more..

Ceiling Leak Under Bathroom

For constant boundary conditions, a homogeneous material, and a fully developed moisture profile, the signal velocity of this profile inside the material is constant over the square root of time. This is well known and frequently observed for water absorption, Structural Drying Ceiling Leak Under Bathroom but it applies similarly  read more..

How To Read A Radon Test

COMPLY WITH EPA REQUESTS FOR INFORMATION All applicants and participants must provide EPA with information upon request. This compliance is an entrance and continuing requirement of the Radon Proficiency Program. Requests to participants, especially measurement service providers, Radon Mitigation How To Read A Radon Test may   read more..

Naturally Remove Smoke After A Fire

During a fire, soot agglomerations are segregated in the air due to flotation effects, the larger agglomerations dropping out of the air closest to the fire and the finer agglomerations farther from the fire. Soot particles will penetrate the finest crevices of a surface and remain physically trappe  read more..

Tips For Cleaning Smoke Damage

Walls and Ceilings. Allow soot to dry untouched for at least 24 hours. Trying to remove soot before it has dried will only spread the stain and make it permanent. After soot has dried, clean walls or ceilings with the same tri-sodium phosphate and Lysol mix described above for cleaning clothes. Wear  read more..

How To Cure Hoarding

We are anticipating a significant and sustained increase in the number of hoarding cases that will be brought to the attention of community agencies. The increase is in part the result of greater public awareness of the hoarding phenomena through various media efforts and Hoarding How To Cure Hoarding the overall   read more..