Asbestos Abatement >> Asbestos Abatement Contractors

Aggressive sampling. "Aggressive sampling" shall mean a method of sampling in which the individual collecting the air sample creates activity by the use of mechanical equipment during the sampling period to stir up settled dust and simulate activity in that area of the building. AHERA. "AHER" shall mean the Asbestos Hazard Emergency Response Act of 1986. AIHA. "AIH" shall mean the American Industrial Hygiene Association. Airlock. "Airlock" shall mean a system for permitting entrance and exit while restricting air movement between a contaminated Asbestos Abatement Contractors area and an uncontaminated area. It consists of two curtained doorways separated by a distance of at least three feet such that one passes through one doorway into the airlock.

Allowing the doorway sheeting to overlap and close off the opening before proceeding through the second doorway, thereby preventing flow-through contamination. Air sampling. "Air sampling" shall mean the process of measuring the fiber content of a known volume of air collected during a specific period of time. The Asbestos Abatement Contractors procedure utilized for asbestos follows the NIOSH Standard Analytical Method 7400 or the provisional transmission electron microscopy methods developed by the USEPA and/or National Institute of Science and Technology which are utilized for lower detectability and specific fiber identification. Ambient air monitoring.

"Ambient air monitoring" shall mean measurement or determination of airborne asbestos fiber concentrations outside but in the general vicinity of the worksite. Amended water. "Amended water" shall mean water to which a surfactant has been added. ANSI. "ANSI" shall mean the American National Standards Institute. Area air sampling. "Area air sampling" shall mean any form of air sampling or Asbestos Abatement Contractors monitoring where the sampling device is placed at some stationary location. Asbestos. "Asbestos" shall mean any hydrated mineral silicate separable into commercially usable fibers, including but not limited to chrysotile (serpentine), amosite (cumingtonite-grunerite), crocidolite (riebeckite), tremolite, anthrophyllite and actinolite. Asbestos-containing material.

"Asbestos-containing material" (ACM) shall mean asbestos or any material containing more than one percent asbestos. Asbestos-containing waste material. "Asbestos-containing waste material" shall mean asbestos-containing material or asbestos-contaminated objects requiring disposal. Asbestos-contaminated objects. "Asbestos-contaminated objects" shall mean any Asbestos Abatement Contractors objects which have been contaminated by asbestos or asbestos-containing material. Asbestos assessment report. "Asbestos assessment report" shall mean the "Form ACP-5" form, as approved by DEP, by which a DEP-certified asbestos investigator certifies that a building or structure (or portion thereof) is free of ACM or the amount of ACM to be abated constitutes a minor project.

Asbestos handler. "Asbestos handler" shall mean an individual certified by the Department who disturbs, removes, encapsulates, repairs, or encloses asbestos material. Asbestos handler supervisor. "Asbestos handler supervisor" shall mean an individual certified by the Department who supervises the handlers during an asbestos project and ensures that proper asbestos abatement Asbestos Abatement Contractors procedures as well as individual safety procedures are being adhered to. Asbestos project notification. "Asbestos project notification" shall mean the "Form ACP-7" asbestos project notification form as approved by DEP. Asbestos investigator.

"Asbestos investigator" shall mean an individual certified by the Commissioner as having satisfactorily demonstrated his or her ability to identify the presence and evaluate the condition of asbestos in a building or structure. Asbestos project. "Asbestos project" shall mean any form of work performed in a building or structure or in connection with the replacement or repair of equipment, pipes, or electrical equipment not located in a building or structure which will disturb (e.g., remove, enclose, encapsulate) more than 25 linear feet or more than 10 square feet of asbestos-containing material. ASTM. "ASTM" shall mean the American Society For Testing and Materials. Authorized Asbestos Abatement Contractors visitor.

"Authorized visitor" shall mean the building owner and his/her representative, and any representative of a regulatory or other agency having jurisdiction over the project. Building owner. "Building owner" shall mean the person in whom legal title to the premises is vested unless the premises are held in land trust, Asbestos Abatement Contractors in which instance building owner means the person in whom beneficial title is vested. Building materials. "Building materials" shall mean any and all materials listed as Presumed Asbestos Containing Materials (PACM) and Suspect Miscellaneous ACM in NYSDOL ICR 56, including but not limited to interior and exterior finishes, equipment, plaster, roofing, flooring, caulking, sealants, tiles, insulation, and mortar and refractory bricks used in the construction of boilers.

Certified industrial hygienist. "Certified industrial hygienist" (CIH) shall mean an individual who is currently certified by] the American Board of Industrial Hygiene. Certified safety professional (CSP). "Certified safety professional" (CSP) shall mean an individual having a bachelor’s degree from an accredited college or university and a minimum of four years experience as a safety professional and who has successfully completed both levels of the Asbestos Abatement Contractors examination administered by the Board of Certified Safety Professionals and who is currently certified by that Board.

How To Remove Lead Paint From Doors

Simple Steps to Protect Your Family from Lead Hazards If you think your home has lead-based paint: Don't try to remove lead-based paint yourself. Always keep painted surfaces in good condition to minimize deterioration. Get your home checked for lead hazards. Find a certified inspector or Lead Paint Removal How To Remove Lead Paint From Doors risk   read more..

Ceiling Leak Under Bathroom

For constant boundary conditions, a homogeneous material, and a fully developed moisture profile, the signal velocity of this profile inside the material is constant over the square root of time. This is well known and frequently observed for water absorption, Structural Drying Ceiling Leak Under Bathroom but it applies similarly  read more..

Animal Damage

Skunks are very well-known, nocturnal residents of most of the country. The common striped skunk, is characterized by prominent, lateral white stripes that run all the way down its back. Otherwise, the skunk’s fur is jet black, the body of the adult striped skunk is about the same size o  read more..

Water Extraction

An examination of the Odor Control Water Extraction in a building will typically disclose a large quantity of organic elements, most at strengths too low to have any visible unfavorable impact. The only trace of their existence might happen from the sense of smell. In the 1920s, there arose the idea that an o  read more..

Work Related Lead Exposure

Laboratories performing lead analyses on blood samples drawn in California are required by law to report electronically all results to the California Department of Public Health (CDPH). The Occupational Lead Poisoning Prevention Program (OLPPP) collects test results for adults 16 years of age and ov  read more..

Spot A Meth House In Your Neighborhood

 
Handling of Furnishings and Porous MaterialsAbsorbent materials can accumulate vapors that are created and dispersed during thecooking pr  read more..

Lead House Paint Removal

Lead was used in house paint to add color, enhance the durability of the house paint to hide the surface it covers, and to make it last a lot longer. In 1978 the government barred lead house paint for use in houses. Houses that were built before 1978 most lik  read more..

About Smoke Damage Restoration Process

Restoration Process Step 1 It takes approximately four days and a team of three cleaning experts to clean a unit of this size. These four days includes a complete cleaning from ceiling to floor and includes cabinets, bathrooms and other rooms. This can be referred to as basic overall cleaning. When   read more..

How To Remove Ice Storm Debris

A grading permit from the local government may be necessary if fill material is necessary. The soil should be placed in thin lifts and compacted per local codes and standards. This action must be decided upon before the start of the debris removal process and Debris Removal How To Remove Ice Storm Debris may not be eligible for s  read more..

How To Use A Tarp To Repair A Roof

Hurricane Rita 2005 Rita, the third Category 5 hurricane of the season, was a destructive and deadly hurricane that devastated portions of southeastern Texas and southwestern Louisiana and significantly impacted the Florida Keys.A tropical wave and the remnants of an old front combined to produ  read more..