Structural Drying >> Dehumidification

The influenced mechanisms of the structure’s main electrical and HVAC systems must be Dehumidification and decontaminated. Division of the influenced area from the uninfluenced areas must be re-created if necessitated preceeding to tear-out. Once achieved, machine-driven drying could begin. These expenses might be entered in flood insurance claims approximation by one of the following processes: Square foot (SF) payment, is when rented tools or professional amenities are not concerned.
 
  1. An insurance payment to dry could be contemplated. Such payment would signify the usage and expenses of operating the HVAC system beyond the normal seasonal use and for industrial fans, commercial Dehumidification or space heaters the insured might use. Sensible alterations must be used if drying non-living spaces or areas of a structure with no climate change. When drying amenities are completed and the compliance of an itemized invoice is not reinforced with an appropriately finished drying report, understanding for the time, kind, and number of tools must follow these suggestions once a sensible try to confirm the quantity and kind of tools is made: Interval – Dehumidification must be accomplished for 1, 2, or 3 days based on the amount of wetness at the beginning of drying.
  2. Think about the following issues: The amount of time flood water stayed inside the structure. The sensible amount of unsalvageable objects stayed installed; and the amount of time after the elimination of unsalvageable structure items, structure clean-up and Dehumidification was achieved, to the start of machine-driven drying. Dehumidifiers – volume is based on the amount of objects soaked by trapped water. In environment -controlled spaces, the following procedures must be used with the particular Dehumidification type in order to decide on the quantity of dehumidification volume necessary. Low Grain Refrigerant (LGR) unit: volume of the influenced area in cubic feet ÷ 50 = the necessitated AHAM pints.
  3. Desiccant unit: volume of the influenced area in cubic feet ÷ 60 x 2 =necessitated CFM. When both kinds of dehumidifiers are used in the same influenced area, the collective volume of all the units must not surpass the volume decided of one procedure. Typical or regular refrigerant units must not be contemplated. Environment control, in an unfinished basement or cellar, dehumidification volume must be decreased. For areas of a structure subjected to soil or outdoor conditions, like in, crawlspaces, enclosed garages, or enclosed utility and storage rooms, Dehumidification must not be contemplated.
  4. Ducting might be used with desiccant units. The amount of air movers on day one must be based on the following: Lapsed time concerning the accomplishment of structure tear-out, thorough cleaning and disinfecting, to the beginning of machine-driven drying. Occurrence of affected salvageable material: Unprotected border wall covering, one air mover per 16 LF, Able to save floors, at least one fan per water damaged room or closet. With inside wall detachment: the elimination of the one fan per room or closet, needs a greater importance on the volume of air circulation and the total amount of the influenced area when drying the Dehumidification.

Mold Mitigation

If there has been a lot of water damage, and/or mold growth covers more than 10 square feet, consult EPA's Mold Remediation in Schools and Commercial Buildings. Although focused on schools and commercial buildings, this Water Damage Mold Mitigation document is applicable to other building types. If you choose to hire  read more..

Classifications Of Smoke Damage

The maximum optical density, Dm, is used primarily in ranking the relative smoke production of a material and in identifying likely sources of severe smoke production. Concerns with the test include the relatively low heat flux exposure, vertical sample mounting, and Smoke Damage Classifications Of Smoke Damage oxygen supply wit  read more..

Asbestos Mitigation

Basically asbestos comes from a group of naturally occurring minerals, with fibers that are of a thin elongated mass which can be separated easily from its strands. These minerals have excellent insulating value, highly resistant to heat and chemicals with flexible fibers that can be woven ea  read more..

Calculate Dehumidification For A Flooded Building

Run-around coils for enhanced dehumidification systems are not a new technology. They are well-described in texts from as long ago as 1939.1, 2, 3, 4 The psychrometric-chart analysis of run-around coils for precooling and reheating is identical to that for ordinary reheat (see sidebar) with one Dehumidification Calculate Dehumidification For A Flooded Building  read more..

Wet Carpet From Toilet Leak

Open all windows for 3 to 5 minutes to ventilate the home and remove stale air without cooling down the house. This should be done in the morning and the evening, if possible. Discontinue the use of humidifiers in all rooms, Water Damage Wet Carpet From Toilet Leak especially in the participant's bedroom. 

  read more..

How To Salvage Fire Damaged Clothing

The International Fire Marshals Association(IFMA) Percy Bugbee Award was presented to Ronald R. Farr at the National Fire Protection Association’s (NFPA)World Safety Conference & Exposition® in Orlando this week. Fire Damage How To Salvage Fire Damaged Clothing

The award, only the seventh given since   read more..

Homemade Home Security

Understanding the difference between National Weather Service watches and warnings is critical to being prepared for any dangerous weather hazard, including hurricanes. A watch lets you know that weather conditions are favorable for a hazard to occur.It literally means "be on guard!" During a weathe  read more..

Wind Damage To Trees

Wind damage to trees AL FERRER SEMINOLE COUNTY URBAN HORTICULTURIST The impact of hurricanes on trees varies from simple defoliation to broken branches, split branch crotches and trunks, leaning or falling trees. While no tree can be guaranteed to stand up to hurricane-force winds, there are some tr  read more..

Remove Peeling Lead Paint

The Brownfields/Voluntary Cleanup Program must verify lead-based paint is properly managed and disposed of prior to issuing a Certification of Completion. The requirements of demolition projects will be different in some respects from other lead-based paint abatement projects. Paint residue and peel  read more..

What Is Needed To Be A Crime Scene Technician

Sometimes total electrical isolation is a good thing— and that's the idea behind a power-over-fiber (PoF) communications cable being developed by Sandia engineers. "It's common to isolate communications between systems or devices by using fiber optic cables, but if power is required, Crime Scene Cleanup What Is Needed To Be A Crime Scene Technician   read more..