GLOSSARY OF USEFUL TERMS Affected air the space within in a room or building which is influenced by or can influence the moisture content level of material inside that room or building. AHAM (Association of Home Appliance Manufacturers) an industry association which publishes test results for water removal performance Ceilling Leak From Rain of dehumidifiers manufactured in the United States. 

Performance is tested in an environment at 80*F and 60% RH for 24 hours.Bound water water absorbed and chemically held within a material; Ceilling Leak From Rain in wood it is water absorbed into the wall structure of cells. Category of Water the degree of which water is contaminated - category 1 water is from a sanitary source, category 2 water is from a source containing a significant degree of contamination.

Category 3 water is water from a grossly contaminated source; Ceilling Leak From Rain category 1 or 2 water can deteriorate if left in building material for a period of time. CFM (cubic feet per minute) a unit of measurement for the volume of airflow which is used to determine the amount of air exchanged during a period time. Condensation the process which water vapor forms into a liquid on surfaces when moist air is in contact with cooler surfaces. 

Conventional refrigerant dehumidifier a drying equipment unit which employs air movement over a cold surface that forces the condensation of water vapor; Ceilling Leak From Rain the dried air is then heated and circulated into the affected air to collect more moisture. Conventional refrigerant units can remove water vapor from air down to 55 GPP. 

Dehumidification the process which removes moisture from air. Desiccant dehumidifier Ceilling Leak From Rain  a drying equipment unit which employs air movement through a moisture absorbing medium which to pull moisture from air. Desiccant units can remove water vapor from air down to zero GPP. 

Dew point (DP) the temperature which air becomes saturated Ceilling Leak From Rain and water vapor condenses to a liquid.Dry Goal the target moisture level for affected materials which require drying.Dry Standard the moisture content level of unaffected materials or known dry materials in an affected building, which are used to establish a drying goal for affected material which require drying.

Drying chamber an area enclosed or created for the purpose of promoting effective drying. Equilibrium moisture content (EMC)  the condition of a material at which it is stabilized due to the existing moisture content of the affected air; Ceilling Leak From Rain the condition at which moisture in a material neither increases nor decreases. 

Evaporation  the process Ceilling Leak From Rain which changes liquid water to a gas (water vapor). Free water absorbed water located within the open spaces of pores of a material. Grains per pound (GPP) a unit of measurement of the amount of water vapor in one pound of air (humidity ratio). 

Institute of Inspection, Cleaning, and Restoration Certification (IICRC) - The IICRC is a certification and standard-setting non-profit organization for the inspection, cleaning and restoration industries, Ceilling Leak From Rain which publishes the "S500 - Standard and Reference Guide for Professional Water Damage Restoration" an ANSI approved procedural standard used by the water restorative industry.

Low grain refrigerant (LGR) dehumidifier a drying equipment unit which employs air movement over a cold surface and a pre-cooling device, which forces the condensation of water vapor to a greater degree of efficiency in drier air conditions, Ceilling Leak From Rain compared to a conventional or standard dehumidifier. 

LGR units can remove water vapor from air down to 34 GPP. Moisture content (MC) the percentage or weight of moisture in a material compared to the weight of that material when completely dry. Moisture map a floor plan sketched of the affected area with the locations of moisture readings of affected and unaffected building material, Ceilling Leak From Rain recorded at least daily over the course of a drying project.

Negative air pressure condition created by removing the air from the affected area which to create infiltration, Ceilling Leak From Rain the process which draws in outside air into the affected area.Permeability the rate of which moisture passes through a material. Porosity the degree of which a material is porous or contains pores, openings or holes. 

Preservative a compound applied to the surface of salvageable material to suppress the growth of fungus, mold, and or mildew, Ceilling Leak From Rain or to prevent the infestation of wood-boring insects. Psychrometric chart a graph diagram showing the relationship between temperature, relative humidity, grains per pound, dew point and vapor pressure. 

Relative Humidity (RH) the percent of moisture in the air by volume at a specific temperature. Secondary damage the unwanted and irreversible change to an unaffected area of a building or to unaffected material, from the effects of excessive moisture, dehumidification, air movement, Ceilling Leak From Rain or heat.

Standard of care the practice recognized by industry which is most common to reasonable and prudent members of that trade that demonstrates being qualified Ceilling Leak From Rain and competent. Standard refrigerant dehumidifier see conventional refrigerant dehumidifier Surface water moisture found on the outermost layer of a material. 

Vapor pressure the force exerted by a gas (water vapor) onto its surrounding environment. EXAMPLE CLAIM USING METHOD (2)x Single floor on concrete slab; affected area is 50 x 40 x Flood water in the building for 24 hours, interior water 24 inches x Professional drying started on the 5th day after building tear-out, cleaning Ceilling Leak From Rain and sanitizing against mold and mildew; there is no drying log x 

Insurance estimate will include the removal and replacement of perimeter and interior wall coverings are removed to 4 foot level; all wall studs and exterior sheathing are exposed x Assume drying scenario "C" DURATION Drying started within 5 days after tear-out, Ceilling Leak From Rain cleaning and sanitizing allow 2 days for drying bound water 

AIR MOVERS For two day duration, day 2 50% of the # of airmovers for Day 1 Day 1 2000 135 SF = 15 Day 2 8 Day 3 0 Total 23 (average 12.5 per day or 1 per 174/sf) DEHUMIDIFIER (LGR) - 2000 SF X 8 foot ceilings 50 factor = 320 pint per day (ppd) needed Ceilling Leak From Rain Standard size 70 X 3 = 210 ppd for 2 days Large size 130 X 1 = 130 ppd for 2 days Total 340 ppd 

EXAMPLE DEHUMIDIFIER SIZES AND CAPACITY RATING LGR STANDARD SIZE 70 PPD LARGE SIZE 130 PPD EXTRA-LARGE SIZE 170 PPD DESSICANT STANDARD SIZE 385 CUBIC FEET PER MINUTE (CFM) or (116 PPD) LARGE SIZE 900 CFM (344 PPD) STANDARD TRAILER MOUNTED 1800 CFM (1000 PPD) LARGE TRAILER MOUNTED 4800 CFM (3032 PPD)

Ice Storm Cleanup

Debris removal supervision strategy help cities prepare for natural disaster related Debris Removal Ice Storm Cleanup and finally enhance the recovery procedure. To be operative, however, these strategies need to recognize crucial elements of the debris removal procedure, including the prequalification of debris removal   read more..

Animal Damage Management And Bat Exclusion In Mass

Animal damage, Animal damage management and bat exclusion in Massachusetts. What is White-Nose Syndrome? White-nose syndrome (WNS) is a disease that affects bats that hibernate in the winter and is associated with a newly discovered fungus, Geomyces destructans. 

The  read more..

Asbestos Siding Removal

Asbestos siding was installed on thousands of homes in the early to the middle 1900s. This siding looked almost like concrete, some of it had texture that had lines running vertically, the bottom of the tile looked kind of wavy. Some people call it asbestic, which is just another form made of   read more..

Applied Structural Drying

Understand the limitations of bleach. While this material is convenient and appropriate as a sanitizer for hard, non-porous items after they have been cleaned, it has distinct drawbacks when cleaning flood-impacted buildings. Application of bleach water can cause corrosion of electrical components a  read more..

Black Water Carpet Cleaning

Wetlands provide significant ecosystem services that include floodwater storage, water quality improvement, and wildlife habitat. Under U.S. Farm Bill programs, an array of defined conservation practices may be installed to reduce agricultural impacts on environmental quality, Water Extraction Black Water Carpet Cleaning with so  read more..

Mold In Apartemens Mold In Rentals

Separation of rents and obligations to maintain property forbidden.A rental agreement, assignment, conveyance, trust deed, or security instrument may not permit the receiptof rent free of the obligation to comply with AS 34.03.100 (a).Sec. 34.03.060. Sublease Tenant Move Out Cleanup Mold In Apartemens Mold In Rentals and assignment.(a) Unless  read more..

Wind Damage And Emergency Board Up

Plywood shutters that you create yourself, if placed correctly, could provide a high degree of Odor Control Wind Damage And Emergency Board Up coverage from flying debris during a storm. Plywood shutters could be placed on all kinds of houses. Measure every window and every door that has glass, and add 8 inches to all the height and w  read more..

How To DIY How To Repair A House Damaged By Smoke

Effects on Smoke on Functional Circuits SNL also tested complete and functional circuit boards for their susceptibility to damage from smoke [18]. These boards contained five functional circuits that could be energized and Smoke Damage How To DIY How To Repair A House Damaged By Smoke monitored during smoke exposure. Each circuit was present twice on   read more..

Clean Your Things Of Smoke And Soot After A House

The department’sReadyCampaign, AARP, Red Cross and NOD developed two new brochures highlighting the key preparedness steps older and disabled Americans and their families and Fire Damage Clean Your Things Of Smoke And Soot After A House caretakers should take before emergencies occur.

The NFPA also announced its newEmergency Evacuat  read more..

California Asbestos Tile Removal Requirements

Identifying hazardous materials before starting work on a project site protects worker health and safety, building occupants, and the financial viability of the project. Doing this up front can help you choose the appropriate inspectors, consultants and contractors and avoid costly change orders or  read more..