Structural Drying >> Ceiling Leak Mold From Pipe Break

However, this relationship could not be proven by experimental investigations on other materials. Scheffler (2008)showed measurement results for a calcium silicate insulation material and a ceramic brick. Both materials have a distinct first drying phase. All results indicated a linear relationship between first drying phase duration Ceiling Leak Mold From Pipe Break and sample height. 

Onechart of these results is shown in Figure 2 at the right. The studywas performed with samples of different diameter and heightand for different vapor transfer conditions to study these influences as well. All results showed a perfectly linear relationship.These discrepancies stipulated an additional study toinvestigate how these differences can occur Ceiling Leak Mold From Pipe Break and understand what influence on the drying process might have caused them. 

ANALYSIS OF THE INFLUENCES ON THE DRYINGThe analyses compared measurement against simulationresults, one-dimensional models against three-dimensionalreality, Ceiling Leak Mold From Pipe Break and different materials with different sample heights.From this, a set of possible influences to investigate wascompiled:1. Influence of heat and vapor transfer coefficients.

Influence of the applied material Ceiling Leak Mold From Pipe Break and simulation model 3. Influence of accounting for or neglecting the threedimensional heat transport 4. Influence of the initial moisture content 5. Influence of the investigated sample heights Investigating these would shed light not only on theparticular discrepancy between measurement and simulation,but also on the influences of the drying experiment in general.

Heat and Vapor Transfer (1)The heat and vapor transfer conditions significantly influence the slope of the drying curve during the first drying phase, Ceiling Leak Mold From Pipe Break and by that also the first drying phase duration. This becomesclear when looking at the left chart of Figure 3, where simulation results of a ceramic brick drying are shown. 

The only changed parameter is the vapor transfer coefficient ß. Not only the first drying phase duration, Ceiling Leak Mold From Pipe Break but also the moisture content at its end are influenced by the transfer conditions at the material surface.

(1)where LE = Lewis number for water vapor given with LE = 0.87 m = dimensionless parameter, Ceiling Leak Mold From Pipe Break according to Baer and Stephan (2003), m = 1/3 = heat transfer coefficient= gas constant for water vapor= Kelvin temperature= specific heat capacity (isobaric condition)= density of air.

The simulation study of Krus et al. (2007) used the analogy between heat and vapor transfer coefficient, Ceiling Leak Mold From Pipe Break also known asthe LEWIS-relation (Equation 1). Evaluation of dryingmeasurements indicated that this relation does not always hold for experiments with higher airflow velocities. However, this is only important if experiment and simulation are compared.

For a simulation study using the same heat and vapor transfercoefficients in all cases, Ceiling Leak Mold From Pipe Break this does not lead to different results.Material and Moisture Transport Model (2)The quality of the applied material functions is an often disputed problem whenever numerical simulations are carriedout. The approximation quality of the material functions iscrucial for any calculation where the results need to be correct.

To exclude any such influences from the discussion, Ceiling Leak Mold From Pipe Break drying simulations were performed with two different material andtransport models according to Krus and Holm (1999) andScheffler and Plagge (2010).The material functions were adjusted according to thesemodels to measured brick data. 

Drying simulations wereperformed while the liquid transport function was slightlyvaried (for both the whole function Ceiling Leak Mold From Pipe Break or only in the lower moisture content range). These calculations produced different but very similar results. All of them showed a linear dependencebetween first drying phase duration and sample height. 

Therefore, the applied model and the approximation quality do notexplain the differences and are of minor importance here.Three-Dimensional Heat Transport (3)Due to the cooling effect of evaporation, Ceiling Leak Mold From Pipe Break the drying surface of a material sample is significantly colder than thesurrounding air. 

As the sample has a finite dimension, heat isnot only transferred from the top (air) and bottom (materialsample) surfaces, but also from the lateral sides of the sample.This leads to a distinct temperature distribution at the drying surface, Ceiling Leak Mold From Pipe Break which in turn causes a vapor pressure distribution there. Consequently, the evaporation rate is not the sameeverywhere at the drying surface.

As the lateral heat flow increases the temperature, thiseffect increases the evaporation rate and, hence, Ceiling Leak Mold From Pipe Break the dryingspeed. This becomes visible in the right-side chart of Figure 3.Here, radial-symmetric three-dimensional simulation resultsfor a ceramic brick drying are displayed. The only variedparameter is the sample diameter, where one-dimensionalcorresponds with an infinite sample diameter.

The influence is clearly visible. This effect is particularlyimportant when comparing experimental data with simulationresults, Ceiling Leak Mold From Pipe Break and the main reason why cylindrical samples should beused for drying experiments (Scheffler and Plagge 2005). The simulation results according to Krus et al. (2007)were done one-dimensionally. 

This might lead to deviationsbetween measured Ceiling Leak Mold From Pipe Break and calculated drying curves, but it doesnot change the relationship between first drying phase duration and sample height from linear to square root. The influence of three-dimensional heat transport is therefore not thereason for the observed deviations. Initial Moisture Content (4)The initial moisture content has a significant influence onthe first drying phase duration. 

The more water needs to beevaporated through a certain surface, the longer it takes.Figure 4 illustrates this with simulation results of a ceramicbrick drying starting from different initial moisture contents.As the initial moisture content is very important for thefirst drying phase duration, Ceiling Leak Mold From Pipe Break it should receive special attention.In order to make results comparable, all investigations shoulduse the same initial moisture content. 

For a simulation, any moisture content can be adjusted and assigned in an even distribution. For an experiment, Ceiling Leak Mold From Pipe Break this is not easily possible. The experimental drying normally starts after a completed water absorption experiment. 

This means that the mean moisture Ceiling Leak Mold From Pipe Break content that is established inside the sample will rangebetween capillary and effective saturation. A drying simulation should therefore start from the moisture content reachedafter a water absorption experiment.

Environmental Effects Of Meth Labs

Meth Production MethodsThere are various methods for making meth in common practice in the U.S. today. Most Kentucky meth"cooks" use variations of the anhydrous ammonia method (also called the Birch Reduction method or"Nazi" method). Kentucky law Meth Lab Cleanup Environmental Effects Of Meth Labs enforcement have also reported discovery of  read more..

Coyote Removal

Coyotes can be a big nuisance, they will prey on household pets if you let them and cause Animal Damage Coyote Removal and other personal property. The use of snares could be a good way to catch these pests and remove them from your property. But first you must check with local authorities on the legalities and   read more..

How To Clean Up Fingerprint Dusting Powder

Sandi's decontamination foam, developed more than a decade ago for remediation of chemical and biological agents and used to decontaminate federal office buildings and mailrooms during the anthrax attacks in 2001,&nbs  read more..

Mold Exposure Symptoms

Remediation can be conducted by the regular building maintenance staff. Such persons should receive training on proper clean-up methods, personal protection, and potential health hazards. This training can be performed as part of a program to comply with the Mold Remediation Mold Exposure Symptoms requirements of the OSHA H  read more..

Mold Testing Kit

How Can I Tell If I Have Mold ? The most practical way to find a mold problem is by using your eyes to look for mold growth and by using your nose to locate the source of a suspicious odor.If you see mold or if there is an earthy or musty smell, you  read more..

Recovering Hurricane Katrina

Attachment of Brick Veneer in High-Wind Regions Hurricane Katrina Recovery Advisory FEMA December 2005 Purpose: To recommend practices for installing brick veneer that will enhance wind resistance in high-wind areas. Key Issues. Brick veneer is frequently blown off Wind Damage Recovering Hurricane Katrina walls of resid  read more..

DIY Removal Of Linoleum With Asbestos

Examination of the equation for asbestos minerals reveals that the visible colors for almost all common asbestos minerals and fiber sizes are shades of gray and black. The eye is relatively poor at Asbestos Abatement DIY Removal Of Linoleum With Asbestos discriminating different shades of gray. 

  read more..

Lead Paint Exposure Registry In California

Legislation in 1986 created a statewide system for tracking lead poisoning cases in children and adults in California (California Health and Safety Code Section 124130). Laboratories are required to report electronically all blood lead levels (BLLs) for persons tested Lead Paint Removal Lead Paint Exposure Registry In California in California to  read more..

Remove Black Toxic Mold From The Attic

Although the level of personal protection suggested in these guidelines is based on the total surface area contaminated and the potential for remediator and/or occupant exposure, professional judgment should always play a part in remediation decisions. These remediation guidelines are based on the s  read more..

How To Remove Protein Smoke Odor From A Home

Fire Victims Help Sheet The Prairie du Chien Fire Department would like to express its sympathy for your property loss because of the fire at your residence.The emotional trauma of a fire is something you never forget. In the days, weeks, and months to come, you face the difficult task of recovering  read more..