Structural Drying >> Ceiling Leak Mold From Pipe Break

However, this relationship could not be proven by experimental investigations on other materials. Scheffler (2008)showed measurement results for a calcium silicate insulation material and a ceramic brick. Both materials have a distinct first drying phase. All results indicated a linear relationship between first drying phase duration Ceiling Leak Mold From Pipe Break and sample height. 

Onechart of these results is shown in Figure 2 at the right. The studywas performed with samples of different diameter and heightand for different vapor transfer conditions to study these influences as well. All results showed a perfectly linear relationship.These discrepancies stipulated an additional study toinvestigate how these differences can occur Ceiling Leak Mold From Pipe Break and understand what influence on the drying process might have caused them. 

ANALYSIS OF THE INFLUENCES ON THE DRYINGThe analyses compared measurement against simulationresults, one-dimensional models against three-dimensionalreality, Ceiling Leak Mold From Pipe Break and different materials with different sample heights.From this, a set of possible influences to investigate wascompiled:1. Influence of heat and vapor transfer coefficients.

Influence of the applied material Ceiling Leak Mold From Pipe Break and simulation model 3. Influence of accounting for or neglecting the threedimensional heat transport 4. Influence of the initial moisture content 5. Influence of the investigated sample heights Investigating these would shed light not only on theparticular discrepancy between measurement and simulation,but also on the influences of the drying experiment in general.

Heat and Vapor Transfer (1)The heat and vapor transfer conditions significantly influence the slope of the drying curve during the first drying phase, Ceiling Leak Mold From Pipe Break and by that also the first drying phase duration. This becomesclear when looking at the left chart of Figure 3, where simulation results of a ceramic brick drying are shown. 

The only changed parameter is the vapor transfer coefficient ß. Not only the first drying phase duration, Ceiling Leak Mold From Pipe Break but also the moisture content at its end are influenced by the transfer conditions at the material surface.

(1)where LE = Lewis number for water vapor given with LE = 0.87 m = dimensionless parameter, Ceiling Leak Mold From Pipe Break according to Baer and Stephan (2003), m = 1/3 = heat transfer coefficient= gas constant for water vapor= Kelvin temperature= specific heat capacity (isobaric condition)= density of air.

The simulation study of Krus et al. (2007) used the analogy between heat and vapor transfer coefficient, Ceiling Leak Mold From Pipe Break also known asthe LEWIS-relation (Equation 1). Evaluation of dryingmeasurements indicated that this relation does not always hold for experiments with higher airflow velocities. However, this is only important if experiment and simulation are compared.

For a simulation study using the same heat and vapor transfercoefficients in all cases, Ceiling Leak Mold From Pipe Break this does not lead to different results.Material and Moisture Transport Model (2)The quality of the applied material functions is an often disputed problem whenever numerical simulations are carriedout. The approximation quality of the material functions iscrucial for any calculation where the results need to be correct.

To exclude any such influences from the discussion, Ceiling Leak Mold From Pipe Break drying simulations were performed with two different material andtransport models according to Krus and Holm (1999) andScheffler and Plagge (2010).The material functions were adjusted according to thesemodels to measured brick data. 

Drying simulations wereperformed while the liquid transport function was slightlyvaried (for both the whole function Ceiling Leak Mold From Pipe Break or only in the lower moisture content range). These calculations produced different but very similar results. All of them showed a linear dependencebetween first drying phase duration and sample height. 

Therefore, the applied model and the approximation quality do notexplain the differences and are of minor importance here.Three-Dimensional Heat Transport (3)Due to the cooling effect of evaporation, Ceiling Leak Mold From Pipe Break the drying surface of a material sample is significantly colder than thesurrounding air. 

As the sample has a finite dimension, heat isnot only transferred from the top (air) and bottom (materialsample) surfaces, but also from the lateral sides of the sample.This leads to a distinct temperature distribution at the drying surface, Ceiling Leak Mold From Pipe Break which in turn causes a vapor pressure distribution there. Consequently, the evaporation rate is not the sameeverywhere at the drying surface.

As the lateral heat flow increases the temperature, thiseffect increases the evaporation rate and, hence, Ceiling Leak Mold From Pipe Break the dryingspeed. This becomes visible in the right-side chart of Figure 3.Here, radial-symmetric three-dimensional simulation resultsfor a ceramic brick drying are displayed. The only variedparameter is the sample diameter, where one-dimensionalcorresponds with an infinite sample diameter.

The influence is clearly visible. This effect is particularlyimportant when comparing experimental data with simulationresults, Ceiling Leak Mold From Pipe Break and the main reason why cylindrical samples should beused for drying experiments (Scheffler and Plagge 2005). The simulation results according to Krus et al. (2007)were done one-dimensionally. 

This might lead to deviationsbetween measured Ceiling Leak Mold From Pipe Break and calculated drying curves, but it doesnot change the relationship between first drying phase duration and sample height from linear to square root. The influence of three-dimensional heat transport is therefore not thereason for the observed deviations. Initial Moisture Content (4)The initial moisture content has a significant influence onthe first drying phase duration. 

The more water needs to beevaporated through a certain surface, the longer it takes.Figure 4 illustrates this with simulation results of a ceramicbrick drying starting from different initial moisture contents.As the initial moisture content is very important for thefirst drying phase duration, Ceiling Leak Mold From Pipe Break it should receive special attention.In order to make results comparable, all investigations shoulduse the same initial moisture content. 

For a simulation, any moisture content can be adjusted and assigned in an even distribution. For an experiment, Ceiling Leak Mold From Pipe Break this is not easily possible. The experimental drying normally starts after a completed water absorption experiment. 

This means that the mean moisture Ceiling Leak Mold From Pipe Break content that is established inside the sample will rangebetween capillary and effective saturation. A drying simulation should therefore start from the moisture content reachedafter a water absorption experiment.

LA Animal Control

HOW CAN I PREVENT WILD ANIMALS FROM FORAGING FOR FOOD IN MY YARD? Skunks, raccoons, opossums, (and in some cases bears) are nocturnal or nighttime active animals and are often attracted to residential areas by the availability of food, water, and shelter. Removing or eliminating the availability of   read more..

Leak In The Ceiling

Protect Your House From Frozen Meters and Pipes Every winter hundreds of water meters and pipes freeze in area homes. You can take easy and inexpensive steps to prevent the damage, expense, and inconvenience associated with freezing pipes Water Damage Leak In The Ceiling and meters.

While   read more..

Mold Inside The Wall From A Plumbing Leak

By The Post-Standard Syracuse, NY -- The daily doses of rain that have fallen on Central New York this spring may have some Syracuse area residents ready to call Noah for a reservation. The region has received at least a trace of rain every day since April 16. Since then, Mold Remediation Mold Inside The Wall From A Plumbing Leak about 8 inch  read more..

Mold Remediation Cost

After cleaning up mold, using a high efficiency (HEPA) vacuum or air cleaner may help to get rid of mold spores in the air. You may be able to borrow a HEPA vacuum. Call your local or state health department to ask. If you find an area of mold greater than 15 square feet, Mold Remediation Mold Remediation Cost   read more..

Coyote Control Skunk Removal

The Eastern coyote is firmly recognized in the U.S. Most Animal Damage Coyote Control Skunk Removal difficulties involve sheep or free ranging chickens and ducks. Most difficulties can be evaded with proper husbandry methods. It is much easier to prevent plunder from happening than it is to stop it once it starts. Below are some step  read more..

File An Insurance Fire Damage Claim

You may be at an even greater risk of flooding due to recent fire that have burned across the region. Large-scale fire dramatically alter the terrain and ground conditions. Normally, Fire Damage File An Insurance Fire Damage Claim vegetation absorbs rainfall, reducing runoff. 

However, fire leave th  read more..

How To Prevent Sewer System Backup

Having sewage back up into the home is an unpleasant and potentially unhealthy experience. The information contained here can help protect you from the hazards of raw sewage in your basement and give you practical methods for proper sanitation of your building should a back-up occur.
Sewers ca  read more..

How To Disinfect After Sewer Problems In A Basemen

It will probably never happen at your home, but in case it does, it's important to have the facts in advance. Remember, if you experience a sewer line blockage, Sewage Cleanup How To Disinfect After Sewer Problems In A Basemen call us first. This could save the unnecessary expense of a plumber. IF AN OVERFLOW OCCURS 1. Discontinue inside water use.2  read more..

Use A Crawlspace Dehumidifier In Your Crawlspace

Select an appropriate winter vacation temperature setting: 37. When leaving your home unoccupied during periods of both mild and severe winter temperatures, finding the right temperature setting can be a challenge. Crawl Space Drying Use A Crawlspace Dehumidifier In Your Crawlspace. It requires balancing the need to minimize the amount of heat added t  read more..

Structural Drying Courses

Hurricanes Ivan (2004) and Katrina (2005) have demonstrated that constructing a building to the minimum National Flood Insurance Program (NFIP) requirements or constructing a building outside the SFHA shown on the FIRMs is no guarantee that the building will not be Structural Drying Structural Drying Courses damaged by floodi  read more..