Structural Drying >> Ceiling Leak Mold From Pipe Break

However, this relationship could not be proven by experimental investigations on other materials. Scheffler (2008)showed measurement results for a calcium silicate insulation material and a ceramic brick. Both materials have a distinct first drying phase. All results indicated a linear relationship between first drying phase duration Ceiling Leak Mold From Pipe Break and sample height. 

Onechart of these results is shown in Figure 2 at the right. The studywas performed with samples of different diameter and heightand for different vapor transfer conditions to study these influences as well. All results showed a perfectly linear relationship.These discrepancies stipulated an additional study toinvestigate how these differences can occur Ceiling Leak Mold From Pipe Break and understand what influence on the drying process might have caused them. 

ANALYSIS OF THE INFLUENCES ON THE DRYINGThe analyses compared measurement against simulationresults, one-dimensional models against three-dimensionalreality, Ceiling Leak Mold From Pipe Break and different materials with different sample heights.From this, a set of possible influences to investigate wascompiled:1. Influence of heat and vapor transfer coefficients.

Influence of the applied material Ceiling Leak Mold From Pipe Break and simulation model 3. Influence of accounting for or neglecting the threedimensional heat transport 4. Influence of the initial moisture content 5. Influence of the investigated sample heights Investigating these would shed light not only on theparticular discrepancy between measurement and simulation,but also on the influences of the drying experiment in general.

Heat and Vapor Transfer (1)The heat and vapor transfer conditions significantly influence the slope of the drying curve during the first drying phase, Ceiling Leak Mold From Pipe Break and by that also the first drying phase duration. This becomesclear when looking at the left chart of Figure 3, where simulation results of a ceramic brick drying are shown. 

The only changed parameter is the vapor transfer coefficient ß. Not only the first drying phase duration, Ceiling Leak Mold From Pipe Break but also the moisture content at its end are influenced by the transfer conditions at the material surface.

(1)where LE = Lewis number for water vapor given with LE = 0.87 m = dimensionless parameter, Ceiling Leak Mold From Pipe Break according to Baer and Stephan (2003), m = 1/3 = heat transfer coefficient= gas constant for water vapor= Kelvin temperature= specific heat capacity (isobaric condition)= density of air.

The simulation study of Krus et al. (2007) used the analogy between heat and vapor transfer coefficient, Ceiling Leak Mold From Pipe Break also known asthe LEWIS-relation (Equation 1). Evaluation of dryingmeasurements indicated that this relation does not always hold for experiments with higher airflow velocities. However, this is only important if experiment and simulation are compared.

For a simulation study using the same heat and vapor transfercoefficients in all cases, Ceiling Leak Mold From Pipe Break this does not lead to different results.Material and Moisture Transport Model (2)The quality of the applied material functions is an often disputed problem whenever numerical simulations are carriedout. The approximation quality of the material functions iscrucial for any calculation where the results need to be correct.

To exclude any such influences from the discussion, Ceiling Leak Mold From Pipe Break drying simulations were performed with two different material andtransport models according to Krus and Holm (1999) andScheffler and Plagge (2010).The material functions were adjusted according to thesemodels to measured brick data. 

Drying simulations wereperformed while the liquid transport function was slightlyvaried (for both the whole function Ceiling Leak Mold From Pipe Break or only in the lower moisture content range). These calculations produced different but very similar results. All of them showed a linear dependencebetween first drying phase duration and sample height. 

Therefore, the applied model and the approximation quality do notexplain the differences and are of minor importance here.Three-Dimensional Heat Transport (3)Due to the cooling effect of evaporation, Ceiling Leak Mold From Pipe Break the drying surface of a material sample is significantly colder than thesurrounding air. 

As the sample has a finite dimension, heat isnot only transferred from the top (air) and bottom (materialsample) surfaces, but also from the lateral sides of the sample.This leads to a distinct temperature distribution at the drying surface, Ceiling Leak Mold From Pipe Break which in turn causes a vapor pressure distribution there. Consequently, the evaporation rate is not the sameeverywhere at the drying surface.

As the lateral heat flow increases the temperature, thiseffect increases the evaporation rate and, hence, Ceiling Leak Mold From Pipe Break the dryingspeed. This becomes visible in the right-side chart of Figure 3.Here, radial-symmetric three-dimensional simulation resultsfor a ceramic brick drying are displayed. The only variedparameter is the sample diameter, where one-dimensionalcorresponds with an infinite sample diameter.

The influence is clearly visible. This effect is particularlyimportant when comparing experimental data with simulationresults, Ceiling Leak Mold From Pipe Break and the main reason why cylindrical samples should beused for drying experiments (Scheffler and Plagge 2005). The simulation results according to Krus et al. (2007)were done one-dimensionally. 

This might lead to deviationsbetween measured Ceiling Leak Mold From Pipe Break and calculated drying curves, but it doesnot change the relationship between first drying phase duration and sample height from linear to square root. The influence of three-dimensional heat transport is therefore not thereason for the observed deviations. Initial Moisture Content (4)The initial moisture content has a significant influence onthe first drying phase duration. 

The more water needs to beevaporated through a certain surface, the longer it takes.Figure 4 illustrates this with simulation results of a ceramicbrick drying starting from different initial moisture contents.As the initial moisture content is very important for thefirst drying phase duration, Ceiling Leak Mold From Pipe Break it should receive special attention.In order to make results comparable, all investigations shoulduse the same initial moisture content. 

For a simulation, any moisture content can be adjusted and assigned in an even distribution. For an experiment, Ceiling Leak Mold From Pipe Break this is not easily possible. The experimental drying normally starts after a completed water absorption experiment. 

This means that the mean moisture Ceiling Leak Mold From Pipe Break content that is established inside the sample will rangebetween capillary and effective saturation. A drying simulation should therefore start from the moisture content reachedafter a water absorption experiment.

How To Clean A Dirt Basement After Flooding

In Two Harbors, the owners of a home built in 1920 and added on to in 1988 decided to fix their cold basement with an exterior insulation retrofit. The house is located in a rural area with clay/gravel Basement Drying How To Clean A Dirt Basement After Flooding soils, and the basement had no evidence of moisture intrusion from groundwater. Physical  read more..

Cleaning Water Out Of Carpet

Air entrainment conforming to the requirements of ASTM C 260, shall be used.The air content shall be 5 to 7 percent.Forms shall conform to the shapes, lines, and dimensions as shown on the drawings. They shall be braced and/or tied together so as to maintain position and shape and; Water Extraction Cleaning Water Out Of Carpet be  read more..

Compulsive Hoarding Debris Removal

Although it seems like hoarding has only recently received attention from certain academic studies, it is now considered to be a form of self-neglect. Despite all of the limited data on the scope of the problem, it is thought that as many as one in twenty Americans could have this serious hoa  read more..

Put A Moisture Barrier In The Crawl Space Under A

To further separate the conditions in the crawl space from those of the outside, mechanical drying systems such as a stand-alone dehumidifier should be used (Dastur et al. 2005). All water discharge from appliances should be terminated to the outside or to a sealed sump. Crawl Space Drying Put A Moisture Barrier In The Crawl Space Under A All kitchen a  read more..

How To Remove Asbestos Flooring

Asbestos has been located in the home, there are two options: hire a professional abatement team, or remove the asbestos yourself. Although removing the asbestos without a specialized Asbestos Abatement How To Remove Asbestos Flooring company often brings further complications and is costly, some  homeowners feel as tho  read more..

File An Insurance Fire Damage Claim

You may be at an even greater risk of flooding due to recent fire that have burned across the region. Large-scale fire dramatically alter the terrain and ground conditions. Normally, Fire Damage File An Insurance Fire Damage Claim vegetation absorbs rainfall, reducing runoff. 

However, fire leave th  read more..

How To Restore Water Damaged Pictures

Libraries, archives, museums, and historical societies are responsible not only for collecting, interpreting, and exhibiting significant materials that document history, but also for the long-term preservation, security, and accessibility of these Document restoration How To Restore Water Damaged Pictures materials.

The American Associa  read more..

Radon Test

Radon is a highly radioactive, colorless, odorless, and tasteless gaseous substance, it is formed as the natural deposits of thorium and uranium throughout the earth’s crust decaying process. As the Radon Mitigation Radon Test decay products are unknowingly inhaled, they could alter the cells in your lungs. T  read more..

About Smoke Damage Restoration Process

Restoration Process Step 1 It takes approximately four days and a team of three cleaning experts to clean a unit of this size. These four days includes a complete cleaning from ceiling to floor and includes cabinets, bathrooms and other rooms. This can be referred to as basic overall cleaning. When   read more..

How To Help A Hoarder

In some cases, the best option would be to put the property into a receivership under Health & The City would ask the court to appoint a receiver who would take over the property and would have the power to make arrangements for repairs, cleanup, or sale. The receiver would work with the Hoarding How To Help A Hoarder in  read more..