Structural Drying >> Ceiling Leak Under Bathroom

For constant boundary conditions, a homogeneous material, and a fully developed moisture profile, the signal velocity of this profile inside the material is constant over the square root of time. This is well known and frequently observed for water absorption, Ceiling Leak Under Bathroom but it applies similarly for the drying. The main difference is that the moisture profile does not develop as quickly. 

In fact it is the end of the first drying phase that is characterized by the completed development of a distinct moisture profile. Once this profile is there, Ceiling Leak Under Bathroom the end of the drying processshould only depend on the signal velocity and the height of thematerial sample. 

The duration of the second drying phasemust, therefore, increase quadratically with the sample height,provided that the drying was started at a moisture contentsufficiently high to allow a clear distinction between first andsecond drying phases.This was investigated by a simulation study on drying offour different materials: calcium silicate brick, ceramic brick, aerated autoclaved concrete, Ceiling Leak Under Bathroom and calcium silicate insulation.

The material properties were taken from Scheffler (2008). The drying was calculated one-dimensionally for different sampleheights with constant boundary conditions of 20°C (68°F) and50% RH. It was started at effective saturation. The results are presented in Figure 7. The left chart shows the total dryingduration versus sample height; Ceiling Leak Under Bathroom the right chart shows only thesecond drying phase duration versus sample height.

The results confirm the above reasoning. The duration of the second drying phase increases quadratically with the sample height. In other words, Ceiling Leak Under Bathroom the square root of the second drying phase duration plotted versus sample height gives a linear relation (see right-side chart of Figure 7).

We therefore propose the following relation (Equation 3) as the definition of the new drying coefficient for building Ceiling Leak Under Bathroom materials: (3)where= drying coefficient in = drying time of the second drying phase in = sample height in The second drying phase duration is the timebetween the deviation from the linear drying and the end of thedrying process (see also Figure 1). 

In other words, it is the timebetween the end of the first drying phase and the moment where the equilibrium moisture content is reached everywhere inside the sample. For measured data, Ceiling Leak Under Bathroom this depends on the frequency of measurement as well as the boundary temperature and relative humidity and might, therefore, be susceptibleto error. 

It is proposed to use calculation results of the dryingprocess normalized to standard conditions. From such data, Ceiling Leak Under Bathroom the second drying phase duration can be easily determined. For most materials, the first drying phase duration isnegligible in the overall drying time. This allows simplifyingthe found relationship to be true also for the total drying timeand not only for the second drying phase duration for which itis strictly correct. 

The left-side chart in Figure 7 shows thetotal drying time versus sample height. The linear relationshipholds for all materials except the calcium silicate insulation, Ceiling Leak Under Bathroom which has a very high porosity (90%) and a very long firstdrying phase. This new drying coefficient gives a measure for the timeit takes to one-dimensionally dry out one meter of material. 

Asdiscussed before, Ceiling Leak Under Bathroom for most building materials this is correct forthe total drying time even though it is strictly only valid for thesecond drying phase. Example values for drying coefficientsof typical building materials are given in Table 2.Discussion of the Proposed Drying CoefficientThe drying coefficient gives a measure of the timerequired to dry out 1 m of material. 

By that, it has a particularmeaning and is a practically useful material parameter. Thequestion is now, Ceiling Leak Under Bathroom however, whether this parameter contains additional information in comparison with the other two moisture transport parameters, i.e., vapor diffusion resistance andwater absorption coefficient. 

For that reason, these coefficients were related to each other for numerous building materials (drying coefficient of material A divided by dryingcoefficient of material B and so on, Ceiling Leak Under Bathroom and similarly for vapordiffusion resistance factors and water absorption coefficients).These related coefficients are plotted against each other inFigure 8 in order to visualize any possible correlation.

If the corresponding properties are correlated, the relatedvalues of different building materials should follow some kindof curve. Between drying coefficient and vapor diffusion resistance, Ceiling Leak Under Bathroom a positive linear correlation is observable, though witha lot of scatter. Between drying coefficient and water absorption coefficient, a negative linear correlation can be found,again with significant scatter.

A weak correlation is not a surprise, Ceiling Leak Under Bathroom since all these coefficients are the result of the material’s specific pore structureand pore connectivity. Some kind of distinct correlation between drying coefficient and vapor diffusion resistanceseems to be obvious, since vapor diffusion dominates thedrying process to quite some extent. 

However, the left-sidechart in Figure 8 indicates there is only a weak correlation.Therefore, Ceiling Leak Under Bathroom the drying coefficient cannot contain exactly thesame information as the vapor diffusion resistance. It mustcontain its own, drying-specific information as well. In orderto investigate this further, the sharp-front model according toHall and Hoff (2002) and Hens (2007) is applied as follows. 

The sharp front model distinguishes between two casesthat can be treated in a simplified way. The first case comprisesstages above critical moisture content. Water transport can be Ceiling Leak Under Bathroom described by liquid conduction. The second case comprisesstages below critical moisture content. Water transport isdescribed by vapor diffusion. 

Due to the high permeabilitiesfor liquid conduction, this treatment leads to a small gradientfor liquid transport and a high gradient for vapor transport.This sharp front has given the model its name.Applying this to the drying problem leads to the modelshown in Figure 9. Assuming the drying starts above criticalmoisture content, Ceiling Leak Under Bathroom the drying rate is determined by a constantvapor transfer at the material surface. 

This process—the firstdrying phase—continues until critical moisture content isreached at the material surface. Then the surface dries outentirely and a steep moisture front is established, Ceiling Leak Under Bathroom which movesslowly into the material. The drying rate is now determined bythe vapor diffusion from the moisture front to the materialsurface.

Tax Deduction For Removing Asbestos Siding

Asbestos and lead have specificAsbestos Abatement Tax Deduction For Removing Asbestos Siding requirements from the Department of Natural Resources and the Department of Health Services for their identification and testing on a project site. See the sections on asbestos and lead in this step for those requirements. 

Yo  read more..

How To Remove Asbestos Insulation From The Pipes

Mesothelioma is relatively rare. According to the American Cancer Society, there are about 2,000 – 3,000 new cases per year in this country. It is most common in asbestos related work exposure though it has been observed in certain communities worldwide here people have had lifetime Asbestos Abatement How To Remove Asbestos Insulation From The Pipes&  read more..

How To Clean Up After An Unattended Death

All employees are responsible for reporting suspected hazardous materials, hazardous wastes, industrial wastes, biohazards, sewage, or any unidentified material or waste incidents to the Fire Department. Crime Scene Cleanup How To Clean Up After An Unattended Death If the Fire Department determines there is a possibility that enforcement action   read more..

Should You Install A Dehumidifier In Your Crawl Sp

A building that has been flooded can be a dangerous place. This page will provide you information about cleaning up and making your home safe to live in again. See also Going Back In and Being Safe. Stay Safe while you Work.
Crawl Space Drying Should You Install A Dehumidifier In Your Crawl Sp Wear a hard hat and safety goggles when there is a danger o  read more..

Local Wind Storm Cause Garbage Clean Up

FEMA did not approve debris plans that did not identify a DMS or disposal site. As mentioned previously, FEMA is considering revisions to its regulations to incorporate the increased federal share component of the PA Pilot Program, which would require PA applicants to identify DMS and final disposal  read more..

Biggest Tornado Disasters

A downburst cluster itself is made up of several downbursts. A downburst is an area of strong, often damaging wind produced by a convective downdraft with the overall size of the downburst varying from 4 to 6 miles (8 to 10 kilometers). Within the downbursts are microbursts; Wind Damage Biggest Tornado Disasters smal  read more..

How To Become A Crime Scene Trauma Technician

The Fire Department is first responder to all NPDES related spills and incidents and assumes primary responsibility for all such incidents with the exception of single family or duplex residential sewage spills, which may be handed over to Environmental or Crime Scene Cleanup How To Become A Crime Scene Trauma Technician Building and Safety division  read more..

Blood Cleanup

These are procedures that police officers follow when they arrive at any kind of Crime Scene Cleanup Blood Cleanup. Police officers must follow very stringent guidelines and these are just a few of them. They will obtain the name, unit and telephone numbers of any and all attending medical technicians, and the name and a  read more..

Lead Paint Abatement And Lead Paint Mitigation In

Lead paint removal, lead paint abatement and lead paint mitigation in New York City Rehabilitation, restoration, and maintenance Lead Paint Removal Lead Paint Abatement And Lead Paint Mitigation In projects frequently address old painted surfaces that require preparation and refinishing. In many cases, old lead-based paint is pre  read more..

Meth Lab Cleanup

Methamphetamine, is unlike many drugs, meaning it is manufactured and is not cultivated or derived from a particular plant, such as the case with marijuana, heroin, and cocaine. Meth has to be manufactured from other chemicals and processes, most of which are   read more..