Structural Drying >> DIV Carpet Cleaning From Floods

When drying surface, free and bound water: o Two-day duration quantity equals 50% of the day 1 total number of air moverso Three-day duration sum of air movers for day 2 and 3 equals number for day 1 When drying bound water only the number of air movers per day should remain DIV Carpet Cleaning From Floods the same  

In crawlspace areas the number of air movers should be less than in finished living spaces, but at least one air mover per enclosed area; DIV Carpet Cleaning From Floods but the total number of air movers should not be more than 50% of the total number of vented openings. Low amperage axial fans are more effective in moving a greater volume of air. 

Larger high amperage axial fan types are more effective in larger open areas. Centrifugal fans are best for velocity air movement across wet flat surfaces. Plastic Containment barriers if utilized over an existing interior wall or door opening, DIV Carpet Cleaning From Floods or over a porous or poorly sealed interior door, but not over an existing exterior door or window.3. 

When drying services are performed and a properly completed "drying log” is submitted along with the itemized invoice, DIV Carpet Cleaning From Floods the insurer and their claim representative should take into consideration the number of drying equipment units validated by the drying log for the drying duration presented. The following charges can also be considered: 

Supplemental heaters; High-pressure axial fans with ducting when utilizing low controlled heat; DIV Carpet Cleaning From Floods and Labor for initial assessment and setup, daily monitoring, and final takedown;all other labor allowances are considered included What is a drying log? 

It is a record of daily temperature and relative humidity readings of both indoor and outdoor air, plus moisture readings and the recorded location of affected DIV Carpet Cleaning From Floods and unaffected building materials, as well as the drying goal and dry standard for the affected materials. 

The properly completed drying log, an industry standard, should also include a moisture map, the daily operating status of the building's HVAC system and all the instruments DIV Carpet Cleaning From Floods and equipment used by the technician.Water Mitigation Review: In cases where the drying charges submitted with a drying log are beyond the parameters described under Method 2 presented above, the claim review process should include an independent review of the charges by a qualified third party.

However, the reviewer's recommendation should never supersede the terms, conditions and limitations of the SFIP or other FEMA claim guidance.Other related issues:1. Water extraction It is important that the estimated unit price for water extraction reflect what is actually required, such as when extracting water with a pump, DIV Carpet Cleaning From Floods hose and periodic monitoring, as in "pump-out”.

This is a different task with a different cost compared to performing water extraction manually using a wet vacuum or specialized extraction equipment when salvaging structural building material. When flood water is extracted to aid the removal of carpet and padding, it is included in its removal unit price; when it is used during the course of cleanup, DIV Carpet Cleaning From Floods as in the removal of spent cleaning water, it is included in the cleanup unit price.

Other equipment When generators , negative air movers, air filtering equipment, personal protection equipment, and any other equipment and associated labor are needed for the removal of damaged building material, cleaning, DIV Carpet Cleaning From Floods or the application of mildewcide (when it is directly caused by or from flood), they are considered included in the unit price for material removal, cleaning, or mildewcide application.

Sealers and preservat ives When a claim includes drying a salvageable item, the charge to apply a sealer or preservative on the same item is not allowed unless there is documentation that the sealer DIV Carpet Cleaning From Floods or preservative was applied before the loss.4. Temporary power When a building's electrical system is not operable the charge for a generator to power drying equipment is not allowed. 

Generators used to power large desiccant dehumidifiers may be considered when the capacity of dehumidification is validated and a properly completed drying log is provided. When the building's power supply is considered insufficient and a generator and auxiliary distribution equipment is needed to power drying equipment, DIV Carpet Cleaning From Floods a charge may be allowed under specific circumstances. 

In such cases the insurer should be contacted immediately to discuss the circumstances involved DIV Carpet Cleaning From Floods and third-party review should be considered early in these rare commercial claims. 5. Drying prior to building's HVAC restoration Mechanical drying should not be performed prior to tear out, clean up, sanitizing treatment and the full restoration of the HVAC system. 

However, when mechanical drying is performed prior to the full restoration of the HVAC all charges for temporary climate control or any subsequent charges for cleaning, sanitizing, DIV Carpet Cleaning From Floods or drying are not covered and cannot be paid.6. Extraneous equipment charges The cost to clean, sanitize, or maintain equipment after usage is included in its unit price.

Overhead and profit A contractor's allowance for overhead and profit is applicable only when a properly completed drying log is submitted, the contractor either hired or performed the services, DIV Carpet Cleaning From Floods and it is reasonable that the contractor's responsibility and oversight were necessary with the services.

Non-covered items The SFIP does not cover the cost to dry building material (1) that has been claimed in a removal and replacement allowance, (2) not directly damaged by flood, (3) that is an exterior item in direct contact with the elements, (4) excluded items, DIV Carpet Cleaning From Floods such as those in a basement or below the lowest elevated floor of a Post-FIRM elevated building, or (5) when the cost of drying an item is more than the value of the item.

NOTE: This document is not an industry standard for drying technicians, nor is it a guide to structurally dry a building.Any questions regarding this guidance should be forwarded through the designated point of contact within your organization then directed. Once again we ask for your cooperation. Suggested Routing: WYO Vendors, DIV Carpet Cleaning From Floods Claims, IBHS, Government Technical Representatives, Independent Adjusting Firms.

Asbestos Removal Specifications In Tennessee

Counting Fibers (1) Place the prepared sample slide on the mechanical stage of the microscope. Position the center of the wedge under the objective lens and focus upon the sample. (2) Start counting from one end of the wedge and Asbestos Abatement Asbestos Removal Specifications In Tennessee progress along a radial line to the other end (c  read more..

After Fire Damage

After you have a fire, you ask, why does my house have broken windows and doors, and there are holes in the roof? Fire Damage After Fire Damage can produce temperatures greater than 1200 degrees, along with smoke damage and hot gases. At times, the firefighters must eliminate all of the heat, smoke and hot gases befo  read more..

Know If A Radon Mitigation System Is Working

Administrative Procedures for Mail-In Tests After EPA accepts an Application for a mail-in device, the applicant will be scheduled for his or her device performance test. The RQAC will send a notice to the applicant requesting the appropriate device(s) prior to the performance test date. Applicant f  read more..

How To Keep Animals Out Of Sheds

Trapping and translocation operations. Permittees wishing to trap and translocate Canada geese must comply with the following procedures: a. Permittees must obtain written permission from the biologist responsible for the county in which the trap and translocation operation is proposed for every sit  read more..

Hot Water Extration From Carpet

Benchmark locations were integrated with gener­alized maps of soils and geology covering parts ofOrleans Parish, which lies at the center of the NewOrleans MSA. It is important to note that the soil andgeology data sets were digitized from small-scale,paper, photocopied maps to test the initial con  read more..

Asbestos Pipe Insulation Removal

In February 2001 the. Environmental Protection Agency, as part of a national evaluation of facilities that received ore from the mine in Libby, Montana, collected surface soil, air, and Asbestos Abatement Asbestos Pipe Insulation Removal surface dust samples from this. W.R. Grace Phoenix facility in Phoenix. 

  read more..

Certified In Lead Paint Removal

Is Lead Certification Required for the type of work I do? You may need to be certified! There are some situations in which you are legally required to be CDPH Lead-Related Construction (LRC) certified. Even if certification is not required in your situation, CDPH encourages you to become trained and  read more..

Basement Flood

When there is a flood the ground becomes completely saturated and the water has nowhere to go and winds up in your basement. Until the floodwaters recede there is little you can do, make sure the electricity is shut off and do not enter the basement. After the water level has gone down you ca  read more..

How To Clean Up Blood From A Suicide Clean Up

Guidelines for Trauma Scene Management Introduction These guidelines for Trauma Scene Management can assist property owners and the public in cleaning up trauma scenes contaminated with human blood and Crime Scene Cleanup How To Clean Up Blood From A Suicide Clean Up other bodily fluids. 

Trauma scenes result when pe  read more..

How To Stop Squirrels From Gnawing On A Log Home

The common raven is widely distributed throughout the Holarctic Regions of the world including Europe, Asia, North America and Animal Damage How To Stop Squirrels From Gnawing On A Log Home extends well into Central America. The Chihuahuan raven occurs in portions of Arizona, New Mexico, Texas and throughout Mexico (H  read more..