Structural Drying >> Flat Roof Leak Repair

In addition to the general guidance given in BIA Technical Notes 28 and 28B, the following are recommended:Note: In areas that are also susceptible to high seismic loads, brick veneer should be evaluated by an engineer to ensure it can resist seismic Flat Roof Leak Repair and wind design loads.Stud Spacing: For new construction, space studs 16" on center, so that ties can be anchored at this spacing.

Tie Fasteners: Ring-shank nails are recommended in lieu of smooth-shank nails. A minimum embedment of 2" is suggested.Ties: For use with wood studs: two-piece adjustable ties are recommended. However, where corrugated steel ties are used, use 22-gauge minimum, Flat Roof Leak Repair 7/8" wide by 6" long, complying with ASTM A 366 with a zinc coating complying with ASTM A 153 Class B2. 

For ties for use with steel studs, see BIA "Technical Notes 28B – Brick Veneer/Steel Stud Walls." Stainless steel ties should be used in areas within 3,000 feet of the coast.Tie InstallationInstall ties as the brick is laid so that the ties Flat Roof Leak Repair are properly aligned with the mortar joints.Install brick ties spaced per Table 1. Studs should be installed at 16" spacing. 

Veneer tie locations for 24" stud spacing are included for repairing damaged veneer on existing buildings with the wider stud spacing.Locate ties within 8" of door Flat Roof Leak Repair and window openings and within 12" of the top of veneer sections.Bend the ties at a 90-degree angle at the nail head in order to minimize tie flexing when the ties are loaded in tension or compression (Figure 9).Figure 9. Bend ties at nail heads

Embed ties in joints so that mortar completely encapsulates the ties. Embed a minimum of 1.5" into the bed joint, Flat Roof Leak Repair with a minimum mortar cover of 5/8" to the outside face of the wall (Figure 10).Figure 10. Tie embedment Table 1. Brick Veneer Tie Spacing Wind Speed (mph)(3-Second Peak Gust) Maximum Vertical Spacing for Ties 16" stud spacing 24" stud spacing.

Nab Wind Pressure (psf) Maximum Vertical Spacing for Ties16" stud spacing 24" stud spacing. The tie spacing is based on wind loads derived from Method 1 of ASCE 7-02, Flat Roof Leak Repair for the corner area of buildings up to 30' high, located in Exposure B with an importance factor (I) of 1.0 and no topographic influence. 

For other heights, exposure, or importance factor, Flat Roof Leak Repair an engineered design is recommended.2. Fastener strength is for wall framing with a Specific Gravity G=0.55 with moisture contents less than 19% and the following adjustment factors, Ct=0.8; and CD, CM, Ceg, and Ctn=1.0.3. 

Nail embedment depth of 2" for 2.5" long 8d common (0.131" diameter) ring-shank fasteners a Maximum spacing allowed by ACI 530-05b 24" stud spacing exceeds the Flat Roof Leak Repair maximum horizontal tie spacing of ACI 530-05 prescribed for wind speeds over 100 mph[End table]Attachment of Rooftop Equipment in High-Wind Regions

Hurricane Katrina Recovery Advisory May 2006, Revised July 2006 FEMA Purpose: To recommend practices for designing and installing rooftop equipment that will enhance wind resistance in high-wind regions. Note: For attachment of lightning protection systems, Flat Roof Leak Repair see Hurricane Katrina Recovery Advisory on Rooftop Attachment of Lightning Protection Systems in High-Wind Regions. 

Key Issues Rooftop equipment frequently becomes detached from rooftops during hurricanes. Water can enter the building at displaced equipment (see Figure 1); displaced equipment can puncture Flat Roof Leak Repair and tear roof coverings (thus allowing water to leak into the building). Equipment blown from a roof can damage buildings and injure people. 

Damaged equipment may no longer provide service to the building. Figure 1 caption. This gooseneck was attached Flat Roof Leak Repair with only two small screws. A substantial amount of water was able to enter the building during the hurricane. 

Construction Guidance Mechanical Penthouse: By placing equipment in mechanical penthouses rather than being exposed on the roof, equipment within penthouses is shielded from high-wind loads and windborne debris (see Figure 2). Therefore, Flat Roof Leak Repair use of mechanical penthouses designed and constructed in accordance with a current building code are recommended, particularly for critical and essential facilities.

Design Loads and Safety Factors: Loads on rooftop equipment should be determined in accordance with the 2005 edition of ASCE 7.Figure 2 caption. This 30' x 10' x 8' 18,000-pound HVAC unit was attached to its curb with 16 straps (one screw per strap). Although the wind speeds were estimated to be only 85 to 95 miles per hour (3-second peak gust), Flat Roof Leak Repair it blew off the building. 

Note: For guidance on load calculations, see "Calculating Wind Loads and Anchorage Requirements for Rooftop Equipment," ASHRAE Journal, volume 48, number 3, March 2006.A minimum safety factor of 3 is recommended for critical and essential facilities, Flat Roof Leak Repair and a minimum safety factor of 2 is recommended for other buildings. 

Loads and resistance should also be calculated for heavy pieces of equipment (see Figure 2).Simplified Attachment Table: To anchor fans, small HVAC units, and relief air hoods, Flat Roof Leak Repair the following minimum attachment schedule is recommended (see Table 1) (note: the attachment of the curb to the roof deck also needs to be designed to resist the design loads):

Number of #12 Screws for Base Case Attachment of Rooftop EquipmentCase No.: 1Curb Size Flat Roof Leak Repair and Equipment Type: 12"x 12" Curb with Gooseneck Relief Air HoodEquipment Attachment: Hood Screwed to Curb Fastener Factor for Each Side of Curb or Flange: 1.6Case No.: 2

Curb Size and Equipment Type: 12"x 12" Gooseneck Relief Air Hood with Flange Equipment Attachment: Flange Screwed to 22 Gauge Steel Roof Deck Fastener Factor for Each Side Flat Roof Leak Repair of Curb or Flange: 2.8Case No.: 3Curb Size and Equipment Type: 12"x 12" Gooseneck Relief Air Hood with FlangeEquipment Attachment: Flange Screwed to 15/32" OSB 

Roof Deck Fastener Factor for Each Side of Curb or Flange: 2.9Case No.: 4Curb Size and Equipment Type: 24"x 24" Curb with Gooseneck Relief Air Hood Flat Roof Leak Repair Equipment Attachment: Hood Screwed to Curb Fastener Factor for Each Side of Curb or Flange: 4.6Case No.: 5Curb Size and Equipment Type: 24"x 24" 

Gooseneck Relief Air Hood Flat Roof Leak Repair with Flange Equipment Attachment: Flange Screwed to 22 Gauge Steel Roof Deck Fastener Factor for Each Side of Curb or Flange: 8.1 Case No.: 6 Curb Size and Equipment Type: 24"x 24" Gooseneck Relief Air Hood with Flange Equipment Attachment: Flange Screwed to 15/32" OSB 

Roof Deck Fastener Factor Flat Roof Leak Repair for Each Side of Curb or Flange: 8.2 Case No.: 7 Curb Size and Equipment Type: 24"x 24" Curb with Exhaust Fan Equipment Attachment: Fan Screwed to Curb Fastener Factor for Each Side of Curb or Flange: 2.5 Case No.: 8 Curb Size and Equipment Type: 36"x 36" 

Curb with Exhaust Fan Equipment Attachment: Fan Screwed to Curb Fastener Factor for Each Side of Curb or Flange: 3.3 Case No.: 9 Curb Size and Equipment Type: 5'-9"x 3'- 8" Curb with 2'- 8" high HVAC Unit Equipment Attachment: HVAC Unit Screwed to Curb Fastener Factor for Each Side of Curb Flat Roof Leak Repair or Flange: 4.5*Case No.: 10

Curb Size and Equipment Type: 5'-9"x 3'- 8" Curb with 2'- 8" high Relief Air Hood Equipment Attachment: Hood Screwed to Curb Fastener Factor for Each Side of Curb Flat Roof Leak Repair or Flange: 35.6*

How To Do Flood Remediation

Disease Risks and Sewage Exposure Flood water often contains raw sewage. Raw sewage can contain certain germs such as bacteria, viruses, and parasites. The risk of illness depends on how you were exposed to the flood water or sewage and how long you were exposed. The most common mode of infection i  read more..

Cigarette Smoke Cleaning

The test procedure is to place the sample in the cuvette and place the cuvette in the quartz tube so that the first 100 mm (3.9 in) is in the exposure zone of the furnace. Using room air, Smoke Damage Cigarette Smoke Cleaning a flow through the tube of at 100 L/h 5 L/h is established. The furnace is set at 600 C 20 C us  read more..

Effects Of Overexposure To Lead

Effects of overexposure to lead. (1) Short-term (acute) overexposure. Lead is a potent, systemic poison that serves no known useful function once absorbed by your body. Taken in large enough doses, lead can kill you in a matter of days. A condition affecting the brain called acute encephalopathy may  read more..

Flood Prevention Tips

This is a manual on safe, healthy, green, and affordable rebuilding of water-damaged homes that will: Serve as a workbook for seminars Be distributed to people working on their own homes, volunteers, and other workers as a guide and reference manual Develop work protocols for contractors This manual  read more..

Calculate Dehumidification For A Flooded Building

Run-around coils for enhanced dehumidification systems are not a new technology. They are well-described in texts from as long ago as 1939.1, 2, 3, 4 The psychrometric-chart analysis of run-around coils for precooling and reheating is identical to that for ordinary reheat (see sidebar) with one Dehumidification Calculate Dehumidification For A Flooded Building  read more..

How Do I Restore Old Documents And Pictures

Although it is neither necessary nor desirable to remove all dirt or discoloration from old papers, surface cleaning sometimes improves the appearance of an artifact. Surface cleaning can also remove substances that might eventually damage paper, Document restoration How Do I Restore Old Documents And Pictures  r that could be transferred to o  read more..

How To Remove Hurricane Damage Debris

More advanced tracking tools have been developed and used in the field to reduce human error and expedite funding. These computer-based systems often include the same information as a traditional load ticket. Each monitor is responsible for populating specific areas of the load ticket. The following  read more..

Roof Damage Insurance Claim In North Carolina

The primary key to good shingle performance is the use of self-seal adhesive, coupled with correct application of fasteners (Smith, 1994). With an adequate number of fasteners, the pull-through resistance of the shingle will determine whether the loss of adhesive seal leads to the shingle being lost  read more..

Will Acrylic Primer Seal Lead Paint

The engineering controls and work practices associated with the employee's job assignment including training of employees to follow relevant good work practices described in Appendix B of this section; The contents of any compliance plan and Lead Paint Removal Will Acrylic Primer Seal Lead Paint the location of regulated areas in effect.   read more..

Withstanding Wind And Lightning

Rooftop Attachment of Lightning Protection Systems in High-Wind Regions Hurricane Katrina Recovery AdvisoryFEMA May 2006, Revised July 2006 Purpose: To recommend practices for installing lightning protection systems (LPS) that will enhance Wind Damage Withstanding Wind And Lightning wind resistance in high-wind regions. Key Iss  read more..