Water Extraction >> Clean Up Water Damage Carpet

Installation shall be in accordance with an approved design and plan. Details of construction shown on the drawings but not included herein are considered as a part of this specification. Construction activities shall be in accordance with applicable OSHA regulations.SITE PREPARATION Clearing and Clean Up Water Damage Carpet Stripping. 

Borrow areas andarea to be occupied by the embankment shallbe cleared of all trees, brush, logs, and sod.The ponded area shall be cleared as noted onthe drawings.Embankment Foundation. All channel banksand sharp breaks shall be sloped to no steeperthan 1 horizontal to 1 vertical. All topsoil Clean Up Water Damage Carpet containing excessive amounts of organicmatter shall be removed. 

Loose earth shall not be left on the foundation area to a depthin excess of 6 inches above undisturbed Clean Up Water Damage Carpet foundation material. The surface of thefoundation area shall be thoroughly scarifiedbefore placement of the embankment material.EXCAVATIONCutoff Trench. 

The cutoff trench shall beexcavated to the lines and grades shown onthe drawings or Clean Up Water Damage Carpet as staked in the field. Thetrench shall be kept free of standing waterduring backfill operations.Spillway. The completed spillwayexcavation shall conform to the grades,bottom width and side slopes shown on thedrawings.

Outlet Conduit. Trench excavation forinstallation of an outlet conduit shall be madein original ground or Clean Up Water Damage Carpet in compacted fillprovided the bottom of the trench is at ornear undisturbed foundation.


Excess Material. Excavated material excessto construction requirements may be hauledfrom the site or Clean Up Water Damage Carpet placed and shaped behind aberm width equal to the pond depth, but notless than 12 feet from the edge of the excavation. COMPACTED EARTH FILL AND BACK FILL Fill Material. 

All fill materials shall beobtained from approved borrow areas andfrom excavations required for other parts ofthe work. The selection, blending, routing,and disposition of materials within theembankment shall be subject to the approvalof the technician. Fill materials shall containno sod, brush, roots, or Clean Up Water Damage Carpet other perishable orunsuitable material. 

Cobbles and rockfragments having a maximum dimension ofmore than six inches shall be removed fromthe materials prior to compaction.Placement. The placing and Clean Up Water Damage Carpet spreading of thefill material shall start at the lowest point ofthe foundation. 

The fill shall be brought up in approximately horizontal layers parallel tothe axis of the dam and Clean Up Water Damage Carpet of such thickness thatthe required compaction can be obtained withthe equipment used. Fill placed aroundstructures will be brought up atapproximately uniform height on all sides ofthe structure.

Moisture. The moisture content of fillmaterial shall be maintained within the limitsrequired to prevent the adherence of the fillmaterial to the treads/tracks of equipment andensure the crushing and blending of the soilclods.Generally when soil material is squeezed inthe hand it will retain a ball shape, Clean Up Water Damage Carpet but therewill not be free water on the surface. 

As faras practicable the material shall be brought tothe proper water content in the borrow pitbefore excavation. Supplemental water,when required, may be applied by sprinklingthe materials on the fill. Uniformdistribution of the moisture shall be obtained by discing, Clean Up Water Damage Carpet blading or other approved methodprior to compaction.

COMPACTION METHODSCompaction shall meet the requirements ofthe method designated and described below:1. Sheepsfoot roller - The maximum layerthickness shall be 8 inches beforecompaction. The roller shall havestaggered, Clean Up Water Damage Carpet uniformly spaced tamping feetand be equipped with suitable cleaners.

The weight of the roller shall be not lessthan 2,500 pounds per foot of width. Themaximum speed of the compactionequipment shall be 3 miles per hour. Theentire surface of each layer placed shallreceive six passes of this equipment toattain the necessary compaction.Adjustment in the number of Clean Up Water Damage Carpet passes may benecessary during construction.

Pneumatic tired equipment - Themaximum layer thickness beforecompaction shall be six inches. A loadedscraper or Clean Up Water Damage Carpet wheel tractor maybe considered apneumatic roller. The wheels of thisequipment must pass over 95 percent of thesurface of each lift before a new lift isplaced.3. Track laying equipment (Bulldozer) Themaximum layer thickness compaction shallbe 4 inches. 

The tracks of the equipmentmust pass over 95 percent of the surface ofeach lift before a new lift is placed.Compliance with compaction requirementswill be determined by observation ofperformance for methods 1, 2, and 3. Fill notmeeting the specified requirements shall bereworked or Clean Up Water Damage Carpet removed and replaced withacceptable fill.

EQUIPMENT OPERATIONHeavy equipment shall not be operatedwithin 2 feet of any structure. Hand directedtampers or Clean Up Water Damage Carpet compactors shall be used on areasnot accessible to heavy compactionequipment and within 2 feet of any structure.

Fills compacted in this manner shall beplaced in layers not greater than 4 inches inthickness before compaction and Clean Up Water Damage Carpet shall meetthe same density requirements as for adjacentareas.The passage of heavy equipment will not beallowed over any type of conduit until thecompacted backfill has been placed aminimum of two feet over the top of the pipe. 

Compaction of backfill adjacent to structuresshall not be started for at least the followingminimum time interval after placement ofconcrete:Walls & Counterforts 10 daysAntiseep collars, conduits, and Clean Up Water Damage Carpet cantilever outlet bents 3 daysCONCRETEConcrete work under these specificationsshall be constructed to the dimensions, lines,and grades as shown on the drawings. 

Thesubgrade for concrete shall be prepared asshown on the drawings or as directed by the Clean Up Water Damage Carpet technician.Concrete compressive strength shall be atleast 4000 psi at 28 days. The mix shall be inaccordance with ASTM C 94 and thisspecification. 

When requested by theTechnician the supplier shall furnish design mix and Clean Up Water Damage Carpet cylinder break test data.Cement shall be low alkali Type II Portland cement. Coarse aggregate shall be maximum size of1-1/2 inches per designations of ASTM C 33.

OCD

Treatments OCD is generally treated with psychotherapy, medication, or both. Psychotherapy. A type of psychotherapy called cognitive behavior therapy is especially useful for treating OCD. It teaches a person different ways of thinking, behaving, and reacting to situations that help him or her feel   read more..

Storm Damage

When a storm has moved into an area, whether it's a tornado or hurricane and creates Document restoration Storm Damage to a library, a school or a business that have an extensive amount of document material, and this material has sustained a significant amount of damage it will need to be restored. There is a certain proc  read more..

Symptoms Of Mold Allergy

Follow These Steps To Clean Symptoms of mold allergy: Begin drying all wet materials. As soon as possible, begin drying any materials that are wet. For severe moisture problems, use fans and dehumidifiers and mov  read more..

Blood Cleanup

These are procedures that police officers follow when they arrive at any kind of Crime Scene Cleanup Blood Cleanup. Police officers must follow very stringent guidelines and these are just a few of them. They will obtain the name, unit and telephone numbers of any and all attending medical technicians, and the name and a  read more..

How To Restore Flood Damaged Electronics

This table represents a limited listing of connector types that have been used in space applications with acceptable results, and consequently are known as preferred. The listings in this table are limited and do not encompass the entire spectrum of all military or space grade connectors that are av  read more..

Crime Scene Robbery Cleaner Training

OSHA is concerned that the words "treated to render bloodborne pathogens noninfectious" may present a problem because there is little or no information in the record that deals with such treatment. The standard does recognize that some blood and blood components and blood products present littl  read more..

Water Extraction From Carpet After Pipe Breaks

In addition to the decline in land-surface altitude,the loss of marshes and barrier islands that dampen storm surge and waves during hurricanes increases the risks of flood disaster in New Orleans Water Extraction Water Extraction From Carpet After Pipe Breaks and vicinity.

Since 1940, approximately 1 million acres of c  read more..

Pipe Leaks

Water Damage Pipe Leaks could be called the silent destroyer, there might be a water leak for days that goes unnoticed then squish you step into it with your stocking feet. But, you think, where did it come from, it’s fairly close to the kitchen sink. You open the cabinet and pull everything out from insid  read more..

Test Your Home For Radon

Former EPA National Radon Proficiency Program Note: EPA no longer updates this information, but it may be useful as a reference or resource. Dated: July 30, 1998 RE: The National Radon Proficiency Program (RPP) Dear RPP Participant, Applicant, States, EPA Regions and Radon Mitigation Test Your Home For Radon RPP Stakeholders:  read more..

Cost To Remove Mold From A Basement

Molds are part of the natural environment. Outdoors, molds play a part in nature by breaking down dead organic matter such as fallen leaves and dead trees, but indoors, mold growth should be avoided. Molds reproduce by means of tiny spores; the spores are invisible to the naked eye and float th  read more..