Water Extraction >> Clean Up Water Damage Carpet

Installation shall be in accordance with an approved design and plan. Details of construction shown on the drawings but not included herein are considered as a part of this specification. Construction activities shall be in accordance with applicable OSHA regulations.SITE PREPARATION Clearing and Clean Up Water Damage Carpet Stripping. 

Borrow areas andarea to be occupied by the embankment shallbe cleared of all trees, brush, logs, and sod.The ponded area shall be cleared as noted onthe drawings.Embankment Foundation. All channel banksand sharp breaks shall be sloped to no steeperthan 1 horizontal to 1 vertical. All topsoil Clean Up Water Damage Carpet containing excessive amounts of organicmatter shall be removed. 

Loose earth shall not be left on the foundation area to a depthin excess of 6 inches above undisturbed Clean Up Water Damage Carpet foundation material. The surface of thefoundation area shall be thoroughly scarifiedbefore placement of the embankment material.EXCAVATIONCutoff Trench. 

The cutoff trench shall beexcavated to the lines and grades shown onthe drawings or Clean Up Water Damage Carpet as staked in the field. Thetrench shall be kept free of standing waterduring backfill operations.Spillway. The completed spillwayexcavation shall conform to the grades,bottom width and side slopes shown on thedrawings.

Outlet Conduit. Trench excavation forinstallation of an outlet conduit shall be madein original ground or Clean Up Water Damage Carpet in compacted fillprovided the bottom of the trench is at ornear undisturbed foundation.


Excess Material. Excavated material excessto construction requirements may be hauledfrom the site or Clean Up Water Damage Carpet placed and shaped behind aberm width equal to the pond depth, but notless than 12 feet from the edge of the excavation. COMPACTED EARTH FILL AND BACK FILL Fill Material. 

All fill materials shall beobtained from approved borrow areas andfrom excavations required for other parts ofthe work. The selection, blending, routing,and disposition of materials within theembankment shall be subject to the approvalof the technician. Fill materials shall containno sod, brush, roots, or Clean Up Water Damage Carpet other perishable orunsuitable material. 

Cobbles and rockfragments having a maximum dimension ofmore than six inches shall be removed fromthe materials prior to compaction.Placement. The placing and Clean Up Water Damage Carpet spreading of thefill material shall start at the lowest point ofthe foundation. 

The fill shall be brought up in approximately horizontal layers parallel tothe axis of the dam and Clean Up Water Damage Carpet of such thickness thatthe required compaction can be obtained withthe equipment used. Fill placed aroundstructures will be brought up atapproximately uniform height on all sides ofthe structure.

Moisture. The moisture content of fillmaterial shall be maintained within the limitsrequired to prevent the adherence of the fillmaterial to the treads/tracks of equipment andensure the crushing and blending of the soilclods.Generally when soil material is squeezed inthe hand it will retain a ball shape, Clean Up Water Damage Carpet but therewill not be free water on the surface. 

As faras practicable the material shall be brought tothe proper water content in the borrow pitbefore excavation. Supplemental water,when required, may be applied by sprinklingthe materials on the fill. Uniformdistribution of the moisture shall be obtained by discing, Clean Up Water Damage Carpet blading or other approved methodprior to compaction.

COMPACTION METHODSCompaction shall meet the requirements ofthe method designated and described below:1. Sheepsfoot roller - The maximum layerthickness shall be 8 inches beforecompaction. The roller shall havestaggered, Clean Up Water Damage Carpet uniformly spaced tamping feetand be equipped with suitable cleaners.

The weight of the roller shall be not lessthan 2,500 pounds per foot of width. Themaximum speed of the compactionequipment shall be 3 miles per hour. Theentire surface of each layer placed shallreceive six passes of this equipment toattain the necessary compaction.Adjustment in the number of Clean Up Water Damage Carpet passes may benecessary during construction.

Pneumatic tired equipment - Themaximum layer thickness beforecompaction shall be six inches. A loadedscraper or Clean Up Water Damage Carpet wheel tractor maybe considered apneumatic roller. The wheels of thisequipment must pass over 95 percent of thesurface of each lift before a new lift isplaced.3. Track laying equipment (Bulldozer) Themaximum layer thickness compaction shallbe 4 inches. 

The tracks of the equipmentmust pass over 95 percent of the surface ofeach lift before a new lift is placed.Compliance with compaction requirementswill be determined by observation ofperformance for methods 1, 2, and 3. Fill notmeeting the specified requirements shall bereworked or Clean Up Water Damage Carpet removed and replaced withacceptable fill.

EQUIPMENT OPERATIONHeavy equipment shall not be operatedwithin 2 feet of any structure. Hand directedtampers or Clean Up Water Damage Carpet compactors shall be used on areasnot accessible to heavy compactionequipment and within 2 feet of any structure.

Fills compacted in this manner shall beplaced in layers not greater than 4 inches inthickness before compaction and Clean Up Water Damage Carpet shall meetthe same density requirements as for adjacentareas.The passage of heavy equipment will not beallowed over any type of conduit until thecompacted backfill has been placed aminimum of two feet over the top of the pipe. 

Compaction of backfill adjacent to structuresshall not be started for at least the followingminimum time interval after placement ofconcrete:Walls & Counterforts 10 daysAntiseep collars, conduits, and Clean Up Water Damage Carpet cantilever outlet bents 3 daysCONCRETEConcrete work under these specificationsshall be constructed to the dimensions, lines,and grades as shown on the drawings. 

Thesubgrade for concrete shall be prepared asshown on the drawings or as directed by the Clean Up Water Damage Carpet technician.Concrete compressive strength shall be atleast 4000 psi at 28 days. The mix shall be inaccordance with ASTM C 94 and thisspecification. 

When requested by theTechnician the supplier shall furnish design mix and Clean Up Water Damage Carpet cylinder break test data.Cement shall be low alkali Type II Portland cement. Coarse aggregate shall be maximum size of1-1/2 inches per designations of ASTM C 33.

How To Restore Fire Damaged Photos

When reviewing completed work, keep in mind that it is difficult to evaluate technical aspects of a treatment. A good rule of thumb is that all repairs should be discernable to a trained eye, Document restoration How To Restore Fire Damaged Photos  o that those consulting the materials in the future will not be misled about an item's   read more..

Soot

Top of Form RICHLAND, Wash. – Cutting the amount of short-lived, climate-warming emissions such as Fire Damage Soot and methane in our skies won't limit global warming as much as previous studies have suggested, a new analysis shows.

The study also found a comprehensive climate policy (includin  read more..

How To Dehumidify A Water Damaged Basement

Purified water and feed water samples from cooper tubing condenser test was analyzed in Dehumidification How To Dehumidify A Water Damaged Basement this experiment. The ion removal efficiency is defined as ion concentration difference of the feed and purified water versus feed ion concentration. It present as equation as follow: 
  read more..

Wet Carpet From Toilet Overflow

Molds are the most common forms of fungi found on earth. They can grow on almost any material, as long as moisture and oxygen are available. Most molds reproduce through the formation of spores, tiny microscopic cells that are resistant to drying and are released into the air. Airborne spores are [M  read more..

Asbestos Abatement Supplies

Joint compound used on wallboard systems often contains asbestos added during the mixing process to improve the working texture of the material. The asbestos in the joint compound is typically much less than 5 percent by weight and the joint compound makes up a minor fraction of the material in the   read more..

Asbestos Definition

Where asbestos definition can be found In the workplace Asbestos definition can be found in the workplace, particularly if you work or have worked as a(n): Brake repair mechanic Carpenter,  Demolition worker,  Dry wall finisher,  Electrician Insulation installer,  Miner,    read more..

Flood Insurance Rate Map

Zone AO: Areas subject to inundation by 1-percent-annual-chance shallow flood insurance rate map (usually sheet flow on sloping terrain) where average depths are 1–3 feet. Average Flood Damage Flood Insurance Rate Map depths derived from detailed hydraulic analyses are shown within this zone. Mandatory flood insurance rate map ins  read more..

Mold Damage House

Although not captured by the covariates or asthma stratification, it is possible that participants who had been inside but had not participated in clean-up were more susceptible to respiratory symptoms than were Water Damage Mold Damage House others. 

Such susceptible participants m  read more..

Chrysotile

Abstract This review provides a basis for substantiating both kinetically and pathologically the differences between chrysotile and amphibole asbestos. 
Chrysotile, which is rapidly attacked by the acid environment of the macrophage, falls apart in the lung into short fibers and particles  read more..

Mold Cause Problems With Allergies

Though disseminated coccidioidomycosis is uncommon, and symptomatic coccidioidal pneumonia usually resolves without therapy, many of these patients are very ill for weeks to months. Galgiani reported that a group of college students in Tucson who had coccidioidomycosis required an average of six cli  read more..