Water Extraction >> Clean Up Water Damage Carpet

Installation shall be in accordance with an approved design and plan. Details of construction shown on the drawings but not included herein are considered as a part of this specification. Construction activities shall be in accordance with applicable OSHA regulations.SITE PREPARATION Clearing and Clean Up Water Damage Carpet Stripping. 

Borrow areas andarea to be occupied by the embankment shallbe cleared of all trees, brush, logs, and sod.The ponded area shall be cleared as noted onthe drawings.Embankment Foundation. All channel banksand sharp breaks shall be sloped to no steeperthan 1 horizontal to 1 vertical. All topsoil Clean Up Water Damage Carpet containing excessive amounts of organicmatter shall be removed. 

Loose earth shall not be left on the foundation area to a depthin excess of 6 inches above undisturbed Clean Up Water Damage Carpet foundation material. The surface of thefoundation area shall be thoroughly scarifiedbefore placement of the embankment material.EXCAVATIONCutoff Trench. 

The cutoff trench shall beexcavated to the lines and grades shown onthe drawings or Clean Up Water Damage Carpet as staked in the field. Thetrench shall be kept free of standing waterduring backfill operations.Spillway. The completed spillwayexcavation shall conform to the grades,bottom width and side slopes shown on thedrawings.

Outlet Conduit. Trench excavation forinstallation of an outlet conduit shall be madein original ground or Clean Up Water Damage Carpet in compacted fillprovided the bottom of the trench is at ornear undisturbed foundation.


Excess Material. Excavated material excessto construction requirements may be hauledfrom the site or Clean Up Water Damage Carpet placed and shaped behind aberm width equal to the pond depth, but notless than 12 feet from the edge of the excavation. COMPACTED EARTH FILL AND BACK FILL Fill Material. 

All fill materials shall beobtained from approved borrow areas andfrom excavations required for other parts ofthe work. The selection, blending, routing,and disposition of materials within theembankment shall be subject to the approvalof the technician. Fill materials shall containno sod, brush, roots, or Clean Up Water Damage Carpet other perishable orunsuitable material. 

Cobbles and rockfragments having a maximum dimension ofmore than six inches shall be removed fromthe materials prior to compaction.Placement. The placing and Clean Up Water Damage Carpet spreading of thefill material shall start at the lowest point ofthe foundation. 

The fill shall be brought up in approximately horizontal layers parallel tothe axis of the dam and Clean Up Water Damage Carpet of such thickness thatthe required compaction can be obtained withthe equipment used. Fill placed aroundstructures will be brought up atapproximately uniform height on all sides ofthe structure.

Moisture. The moisture content of fillmaterial shall be maintained within the limitsrequired to prevent the adherence of the fillmaterial to the treads/tracks of equipment andensure the crushing and blending of the soilclods.Generally when soil material is squeezed inthe hand it will retain a ball shape, Clean Up Water Damage Carpet but therewill not be free water on the surface. 

As faras practicable the material shall be brought tothe proper water content in the borrow pitbefore excavation. Supplemental water,when required, may be applied by sprinklingthe materials on the fill. Uniformdistribution of the moisture shall be obtained by discing, Clean Up Water Damage Carpet blading or other approved methodprior to compaction.

COMPACTION METHODSCompaction shall meet the requirements ofthe method designated and described below:1. Sheepsfoot roller - The maximum layerthickness shall be 8 inches beforecompaction. The roller shall havestaggered, Clean Up Water Damage Carpet uniformly spaced tamping feetand be equipped with suitable cleaners.

The weight of the roller shall be not lessthan 2,500 pounds per foot of width. Themaximum speed of the compactionequipment shall be 3 miles per hour. Theentire surface of each layer placed shallreceive six passes of this equipment toattain the necessary compaction.Adjustment in the number of Clean Up Water Damage Carpet passes may benecessary during construction.

Pneumatic tired equipment - Themaximum layer thickness beforecompaction shall be six inches. A loadedscraper or Clean Up Water Damage Carpet wheel tractor maybe considered apneumatic roller. The wheels of thisequipment must pass over 95 percent of thesurface of each lift before a new lift isplaced.3. Track laying equipment (Bulldozer) Themaximum layer thickness compaction shallbe 4 inches. 

The tracks of the equipmentmust pass over 95 percent of the surface ofeach lift before a new lift is placed.Compliance with compaction requirementswill be determined by observation ofperformance for methods 1, 2, and 3. Fill notmeeting the specified requirements shall bereworked or Clean Up Water Damage Carpet removed and replaced withacceptable fill.

EQUIPMENT OPERATIONHeavy equipment shall not be operatedwithin 2 feet of any structure. Hand directedtampers or Clean Up Water Damage Carpet compactors shall be used on areasnot accessible to heavy compactionequipment and within 2 feet of any structure.

Fills compacted in this manner shall beplaced in layers not greater than 4 inches inthickness before compaction and Clean Up Water Damage Carpet shall meetthe same density requirements as for adjacentareas.The passage of heavy equipment will not beallowed over any type of conduit until thecompacted backfill has been placed aminimum of two feet over the top of the pipe. 

Compaction of backfill adjacent to structuresshall not be started for at least the followingminimum time interval after placement ofconcrete:Walls & Counterforts 10 daysAntiseep collars, conduits, and Clean Up Water Damage Carpet cantilever outlet bents 3 daysCONCRETEConcrete work under these specificationsshall be constructed to the dimensions, lines,and grades as shown on the drawings. 

Thesubgrade for concrete shall be prepared asshown on the drawings or as directed by the Clean Up Water Damage Carpet technician.Concrete compressive strength shall be atleast 4000 psi at 28 days. The mix shall be inaccordance with ASTM C 94 and thisspecification. 

When requested by theTechnician the supplier shall furnish design mix and Clean Up Water Damage Carpet cylinder break test data.Cement shall be low alkali Type II Portland cement. Coarse aggregate shall be maximum size of1-1/2 inches per designations of ASTM C 33.

How To Clean Up After Fire Damage

The correlation is even stronger than just by the day of test. Because each test had a 250 nm probe and a 4500 nm probe, the test-to-test correlation was strong as seen in Figure 11. The strength of the correlation seems to reinforce the variability in the performance of the material and not just un  read more..

After Your Flood Damaged House

If the above options are not possible, in emergency conditions, you may be able touse insulin that is available without a prescription on a temporary basis. These insulins include Humulin R, Novolin R, Humulin N and Novolin N. Switchinginsulin should always be done in consultation with a physician [  read more..

How To Paint Concrete In Basements For A Moisture

The optimal method to enhance the hygrothermal performance of basement walls is to apply exterior waterproofing and insulation extending the full depth of the foundation wall, and ensure proper drainage Basement Drying How To Paint Concrete In Basements For A Moisture at the bottom (footing) of the foundation. Such an approach can be very costly and disr  read more..

Mold Treatment For A Flooded Basement

Because dealing with a flooded area can be dangerous, extra safety precautions should be taken.When in doubt, contact the City of Columbus Health Department.Please follow these safety tips: Because electrocution is always a danger in a flooded basement, Basement Drying Mold Treatment For A Flooded Basement wait until the water recede  read more..

Water Damage Electronic Restoration Classes

When candidate plug or receptacle D-subminiature, microminiature or printed circuit connectors are submitted for qualification, completely assembled mated pairs shall be used. Connectors shall have a full complement of contacts. For Level 1 qualification, three mated pairs shall be prepared. For Lev  read more..

Asbestos Abatement

If you are reading this article, it is most likely that an Tenant Move Out Cleanup Asbestos Abatement will be performed nearby to your home or office in the future. While not inclusive, this article will try to answer many of the usual inquiries that most people might have under these conditions. Asbestos-containing building mater  read more..

About Crime Scene Cleanup Companies In California

Medical/Infectious/Regulated Waste Operations: Although OSHA is not aware of any documented cases of HBV or HIV infection associated with the collection, transportation, and final disposal of "regulated" waste, Crime Scene Cleanup About Crime Scene Cleanup Companies In California the potential for such an infection prior to final disposal of the was  read more..

Things You Should Know About Floods

FLOOD OR DISASTER SANITATION INFORMATION The attached information will be of assistance to homeowners and citizens both during and after a flood or other disaster which effects private residences, water supplies, Flood Damage Things You Should Know About Floods and other facilities. 

The following information   read more..

Safely Remove Lead Paint

What is lead and why is it harmful? Lead is a soft, bluish-gray metal that is highly toxic and all around us. It is an element that occurs naturally. It has a centuries-old history of many commercial and industrial uses. There is no known need for lead in human nutrition and Lead Paint Removal Safely Remove Lead Paint even rela  read more..

Storm Wind Damage Scale

Area affected by the July 4, 1969 derecho (outlined in blue), with the approximate hourly positions of the leading edge of derecho winds (gust front) indicated by curved purple lines. Arrows indicate direction of storm winds. During the afternoon of Friday, July 4, 1969, Wind Damage Storm Wind Damage Scale thunderstorms  read more..