Water Damage >> Leaking Toilet Base

Burst Pipe Floods Basement Areas On the front page...Late Tuesday evening, June 26, the Clinical Center experienced one of the worst floods in its history when a water booster pump vibration eliminator on a chilled- water pipe burst and ran for 40 minutes before it was detected Leaking Toilet Base and stopped. 

The B1 and B2 levels of Bldg. 10 experienced significant flooding, including Medical Arts, the NIH Library lower level, Leaking Toilet Base the CC's materials management department's biomedical engineering and property management section, computer support services and linen service. No one was injured in the incident or in the remediation period in the weeks after the flooding.

A vibration eliminator is a rubber fitting that joins two pipes and keeps water flowing. The broken 8-inch pipe had 140 pounds of pressure on it, Leaking Toilet Base pumping 1,000 gallons of water per minute into the CC. Because the water pressure had backed up, it became so intense that the pipe failed. 

The pipe is fed from a pump sitting on the floor on a concrete slab; Leaking Toilet Base it transfers water to coils in the air-handling unit in the South entrance lobby.Continued...NIH Library The broken pipe was located in a utility room directly adjacent to the lower level of the NIH Library. 

Fortunately, Leaking Toilet Base recently installed compact shelves raised the level of the lowest tier of books and journals to 6 inches more than standard shelving. As a result, none of the 4 inches of standing water reached those items. Because of quick action to remove the soggy carpet and bring in dehumidifiers and fans, mold and mildew did not have time to develop. 

Staff from NLM's preservation section came to the library shortly after the flood to salvage some expensive foreign language dictionaries Leaking Toilet Base and scientific treatises used by the library's translations unit that were literally dripping wet. 

Access to the lower level and the print collections during the recovery process, the only major library service affected was document delivery, Leaking Toilet Base which fills about 500-600 requests each day for articles, primarily from print journals on the B1 level. 

Because of damage Leaking Toilet Base and safety concerns during the first 2 days after the flood, no document requests could be downloaded, let alone filled. However, after the elevator resumed operation, the document delivery team regrouped and was able to obtain articles from other sources until scanners were back in operation and it was safe to again work in the area affected by the flood.

Medical ArtsWater did not accumulate as much in the library because it seeped through the floor of B1 into the ceiling of B2 through the holes and cracks where utilities connect between floors, Leaking Toilet Base severely affecting NIH's Division of Medical Arts and Printing Services. 

About 50 percent of the division's equipment, including cameras, lenses, photography equipment, computers and graphic design supplies was destroyed Leaking Toilet Base and must be replaced. About 35 percent of medical arts staff worked from home in the days following the flood, while others temporarily relocated to offices within Bldg. 10 and 31. 

The TV operations center, which provides cable programming throughout the building, including to patient rooms, was turned off for about 5 hours on June 27 for water clean up, Leaking Toilet Base but sent its first transmission following the flood by 1 p.m. on June 28. The Center for Information Technology on July 2 rewired medical arts' staff phones to the temporary support area on the 14th floor. 

The date for medical arts' return to its B2 area is unknown at this time. BEIP Biomedical Engineering Instrumentation Leaking Toilet Base and Personal Property Management (BEIP) experienced a substantial loss of patient care-related equipment and supplies. 

A remediation crew and BEIP staff cleaned water from Rm. B2S245, removed damaged boxes and supplies, discarded soaked carpeting, installed dehumidifiers and fans Leaking Toilet Base and opened up the walls to allow water to drain. The housekeeping and fabric care department (HFCD) sanitized the floors before the walls were repaired and painted and the carpeting in the reception area replaced. 

Although the flood disrupted BEIP operations, Leaking Toilet Base all services critical to the CC were maintained by activation of the materials management department's emergency management plan and the partnership of all MMD sections.CC Linen ServicesAll linens stored in affected areas were sent out to be cleaned. 

Water was also removed from the scrubs storage area; scrubs contained there were replaced. HFCD estimates that it sustained $5,000 in losses, including sheets, towels, slippers, Leaking Toilet Base two computers with printers and clean-up time.DCRI Computer Support; CC's OFM

The CC department of clinical research informatics' B2L104 location housing several user support staff was practically destroyed. DCRI estimates it has lost more than 50 computers; Leaking Toilet Base the B2 office was a staging area for CC computer deployment, as well as storage for equipment provided to the nursing units. 

After about 4 days, all equipment from the area was removed and some salvaged. All furniture, Leaking Toilet Base carpeting and ceiling will be replaced and the walls will be surveyed for water damage - a process that will take at least 6 weeks. 

The CC's Office of Facility Management and the Duke University conference room were also flooded on the B1 level, but staff were able to work in place once the water was cleaned up Leaking Toilet Base and dehumidifiers dried out the area. STUDY FACTS:Power outages were the cause of 18% of water damage incidents involving a sump pump.

Another 40% of incidents were attributedto things such as a clogged inletscreen or a faulty float switch.LOSS PREVENTION AND MAINTENANCE TIPS Follow the manufacturer’s recommendationsfor sump pump Leaking Toilet Base maintenance. These vary from running the sump pump every 2 to 3 months to a yearly cleaning before the rainyseason.

To inspect the sump pump: Open the lid and remove debris that may beblocking the water inlet screen. Pour approximately 5 gallons of water into thepump and watch the float valve rise. As the float valve rises, the pump should turn on Leaking Toilet Base and the water should discharge through theoutlet pipe. Go outside and inspect the outlet pipe. 

Water should be flowing from the pipe and awayfrom the home. If the sump pump fails to operate during this inspection, Leaking Toilet Base contact a plumbing professional. Install a battery backup system. Choose a system with a battery replacement warning. Replace batteries every 2 to 3 years.

Tools For Restoring Fire Damaged Electronics

While the conductivity of some conducting polymers may be as much as 100 times higher than that of MnO2, the improvement in capacitor ESR is not this dramatic. What is typically seen is reduction of capacitor ESR by a factor of between 2 and 4. The discrepancy is due to several factors. First,   read more..

Safely Remove Black Mold

 
The more serious health problems have been associated with the toxic black mold, Stachybotrys atra. The mold is greenish-black and slimy, resembling tar or black paint.  read more..

Storm And High Flood Damage Prevention Plan

Mold, mildew and bacteria are common following floods and other water damage. If unchecked they can lead to sanitation and health problems. The walls, floors, closets, shelves, contents-every flooded part of your house-should be thoroughly washed and disinfected.In most cases, Flood Damage Storm And High Flood Damage Prevention Plan household cleanin  read more..

Health Effects Caused By Lead Poisoning

Health effects caused by lead exposure can be subdivided into five developmental stages: Normal, physiological changes of uncertain significance, pathophysiological changes, overt symptoms (morbidity), and mortality. Within this process there are no sharp distinctions, butrather a continuum [ME  read more..

How To Remove Fire Smoke Smell From Apartment

Proper selection of PPE for individual responders must be based upon a careful assessment of two factors: (1) the hazards anticipated to be present, or are present at the scene and (2) the probable impact of those hazards, based upon the mission role of the individual. The emergency responder must b  read more..

Hoarding Is Also Related To Compulsive Shopping

Collecting is a very common form of a hobby in this country. Many collections are started when people are young children or teenagers and they grow over time.Hoarding behavior is different from collecting behavior and can be distinguished primarily by the following: Excessive acquisition of items, [  read more..

Guidelines For Fire And Smoke Damage Repair

If you suspect someone has heat stroke, follow these instructions: Immediately call for medical attention. Get the person to a cooler area. Cool the person rapidly by immersing him/her in cool water or a cool shower, or spraying or sponging him/her with cool water. If the humidity is low, wrap the p  read more..

How To Dry A Moldy Wet Basement

Molds are fungi that grow best in warm, damp environments – like your flooded basement. If your home has been flooded and has been closed up for several days, you can assume it has been contaminated with Basement Drying How To Dry A Moldy Wet Basement mold. Mold and Health Some people are sensitive to molds – even dead molds. Exposure  read more..

Grants For Lead Paint Removal

Employees, employee representatives, or employers can ask NIOSH to help learn whether health hazards are present at their place of work. NIOSH may provide assistance and information by phone and in writing, or may visit the workplace to assess exposure and employee health. Based on their findings, N  read more..

Protecting Against Hurricanes

Attachment of Brick Veneer in High-Wind Regions Table 1. Brick Veneer Tie Spacing Wind Speed (mph)(3-Second Peak Gust) Maximum Vertical Spacing for Ties 16" stud spacing 24" stud Wind Damage Protecting Against Hurricanes spacing 90 18.0a 16.0a 100 18.0a 16.0a 110 18.0a 14.8 120 18.0a NAb 130 15.9 NAb 140 13.7 NAb 150 10.2 Nab  read more..