Crawl Space Drying >> Water Mitigation

Insulation is one of the most important parts of trying to keep your Water Mitigation. Here are some useful tips, always install rigid or insulation that comes in batts using one of three different methods either use exterior foam, interior foam, or interior batt to create complete insulation coverage. Be sure to insulate the band joist with batt insulation, and possibly the most importantly insulate the crawlspace access if it is located in the exterior wall.

  1. Install a one-piece termite shield between your band joist and the masonry Water Mitigation foundation wall that will cover the wall insulation and will also extend completely outside, or leave at least a 2- to 4-inch insulation gap at the top for later termite inspection. Install an air supply outlet in the crawlspace, depending on the leakiness of the floor to provide a good return air path. During the early steps of your home’s construction, meet with your mechanical subcontractors, the plumbing, electrical, and heating/cooling contractors to remind them of the importance of keeping this between the floor joists as clear as possible.
  2. Run your Water Mitigation plumbing drain lines, the electrical wiring, and the heating and air ductwork below the bottom of the insulation so that an endless layer of insulation could be installed. For added protection against freezing, supply plumbing could be installed within the insulation. The best method is to run your water supply plumbing together in a few joist cavities. The insulation could be split and run around your plumbing piping, seal any air leaks between the conditioned space of your home and the Water Mitigation. These high-priority air leaks will include the holes around your bathtub drains and other plumbing drain lines, plenums for air ductwork.
  3. Take the other penetrations like for your electrical wiring, plumbing, and ductwork including the duct boot connections at your floor. Select the correct insulation levels of batts with an attached vapor/moisture barrier that are usually used to insulate your framed floors. Get the insulation with the proper width for the correct joist spacing of the floor being insulated. Complete insulation coverage is imperative, do not leave any Water Mitigation insulation voids. The batts must be installed up against the subfloor to remove any gaps that may act as passageways for cold air to flow between the insulation and the subfloor.
The batts need to be cut to the full length of the floor joist being insulated and cut to fit around your wiring and plumbing. Insulate around the band joist area and between the air ducts and your sub floor as the space permits. Use the correct insulation hangers or wire staves that are spaced every 12-18 inches to hold up the floor insulation in place without squeezing the insulation more than 1 inch. The location of the Water Mitigation vapor barrier will depend on your home’s location. In most parts of the country, the vapor/moisture barrier should face upward. Although, in certain areas of the Gulf states and other regions with mild winters and hot summers, it.

Mold Removal

Mold usually grows in extremely damp and humid areas such as basements and bathrooms. Mold Remediation Mold Removal from the caulking around your bathtub or shower is very common problem. First, there are different kinds of caulking, the caulking needs to be a mold and mildew resistant type and there's no way to know  read more..

Removing The Smoke Odor

If aerial fire retardant or firefighting foam residue is present on the house or automobiles, use a mild detergent and brushes to scrub and dilute the dried residue and flush it from the surfaces and rinse with clean water. Persons engaged in these cleaning activities may wish to wear respiratory pr  read more..

Painters Exposure To Lead Paint

The California Painters Project was a 2-year intervention research project aimed at preventing lead poisoning among a group of residential and commercial painters in San Francisco, Calif. As part of this project 12 contractors invited project staff to conduct employee Lead Paint Removal Painters Exposure To Lead Paint exposure monitor  read more..

Cleanup A Trashed Repo

The service of a notice to quit upon a tenant or person in possession does not authorize an action to be maintained against the tenant or person for the possession of the premises until the expiration of the period for which that tenant or person may have paid rent Tenant Move Out Cleanup Cleanup A Trashed Repo for the premises in  read more..

Hurricane Safety Procedures

The contractor must submit drawings to DCAM through the Department or Agency for approval of any windows or openings to be sealed by any method other than that shown in sketches listed in number 1 above.9. For windows over 48 inches wide or 96 inches in height, the contractor must submit drawings to  read more..

Use A Foundation Drainage System To Remove Radon G

Check the following to make sure that you have enclosed the necessary attachments to the Application forms you are submitting.For Residential Measurement and Mitigation Services Providers A copy of either your CBT or paper-and-pencil official exam results. (Do not submit your Radon Mitigation Use A Foundation Drainage System To Remove Radon G application until   read more..

Prevention And Control Of Wildlife Damage

The Forest Service gives notice of and requests comment on proposed revisions to its policy on animal damage management to be published in the Forest Service Manual Chapter 2650. This Animal Damage Prevention And Control Of Wildlife Damage direction would replace current agency procedures for im  read more..

Black Mold Exposure

Although the largest group of patients had diffuse pulmonary infiltrates, a significant fraction had focal pulmonary disease, meningitis, Mold Remediation Black Mold Exposure or other extrapulmonary disease. Six patients had only a positive serologic test with no other evidence of infection. Excluding the patients who ha  read more..

Cleanup After Hurricane Damage

Health Effects of Exposure to Water-Damaged New Orleans Homes Six Months After Hurricanes Katrina and Rita Objectives.We investigated the relation between respiratory symptoms and exposure to water-damaged homes and Water Damage Cleanup After Hurricane Damage the effect of respirator use in post hurricane New Orleans, Louisiana  read more..

How To Choose A Professional Dehumidifier

Flat-plate heat exchangers consist of a series of flat Dehumidification How To Choose A Professional Dehumidifier or nearly flat heat exchange surfaces arranged in such a way that alternating air passages are connected to one air stream with remaining passages connected to the second air stream. the recuperative application of the air-to-air   read more..