Smoke Damage >> Effects Of Smoke On Electronic Equipment

In the United States, flammability requirements for electrical equipment are most commonly specified in the National Electrical Code (NEC) [12]. Specific testing requirements are then defined by testing laboratory standards (e.g., Underwriters Laboratories, Canadian Standards Association, etc.). Such standards are essentially voluntary until required by a building code,regulatory agency, Effects Of Smoke On Electronic Equipment or by the building owner as part of the bid process for construction of a facility. 

Such requirements are included in the specifications of various organizations such as the U.S. Nuclear Regulatory Commission (NRC), the Department of Defense, transportation authorities, and other large organizations. These specifications include requirements governing the allowable ignition, Effects Of Smoke On Electronic Equipment flame spread, and smoke production of materials, along with the design,installation, and use of electrical devices and systems.

In addition to direct regulation of the flammability and smoke generation properties of materials and Effects Of Smoke On Electronic Equipment equipment, there is also interest in indirect effects on the operational capabilities of personnel and equipment that may be exposed to a fire environment resulting from a fire. 

In NPP applications, Effects Of Smoke On Electronic Equipment operators must be able to perform appropriate safe shutdown operations and equipment may be critical to plant monitoring or to safe shutdown procedures so that both the direct effects of fire and indirect effects of fire generated smoke are of interest to ensure safe plant shutdown.

Considerable research has been conducted on the direct effects of fire in NPP applications [11].Recent studies have reviewed potential sub lethal effects of fire effluent [13]. A review of both direct and Effects Of Smoke On Electronic Equipment indirect effects of fire on electrical equipment [7] was also a resource for this report.

This chapter provides a review of Effects Of Smoke On Electronic Equipment studies of indirect fire effects on electrical equipment including studies specific to NPPs plus a significant base of research related to telecommunications equipment.2.1 Nuclear Power Plant Equipment 2.1.1 Susceptible Components in NPP Applications The earliest treatment of indirect fire damage to nuclear power facilities is a report prepared for the NRC by the NUS Corporation in 1985 [14]. 

The report evaluates the damaging aspects of fire environments, Effects Of Smoke On Electronic Equipment the susceptibility of various components to damage and the importance of those components to plant safety. Of particular interest was the impact of conditions associated with suppression activities (high humidity or liquid water effects).

Elevated temperatures below ignition temperatures of typical materials, and corrosion due to products from cable fire or Effects Of Smoke On Electronic Equipment gaseous suppression agents.Components were selected for evaluation based on the Fire Hazards Analysis (FHA) reports from four NPPs. Those components necessary to achieve and maintain safe-shutdown were evaluated based on Environmental Qualification (EQ) test reports and hydrogen burn tests. 

The EQ reports were used to judge resistance to elevated temperatures and high humidity or liquid water effects. The hydrogen burn tests and Effects Of Smoke On Electronic Equipment numerical simulations subjected a variety of electrical and electromechanical components to elevated temperatures, pressures and humidity caused by hydrogen fires in confined spaces. 

The hydrogen burn results indicated functionality of specific components and likely causes of failure. Based on the sources above and extensive use of engineering judgment, Effects Of Smoke On Electronic Equipment components were assigned ratings in a number of distinct categories describing damage ability and significance to plant operability. 

These ratings were weighted according to relative importance and Effects Of Smoke On Electronic Equipment combined into a single value to describe the overall hazard produced by exposing a given component to adverse environmental conditions. The primary result of these experiments is a relative ranking of components by both importance and susceptibility to fire damage. 

This information, shown in Table 1, is expressed for each component as a single number ranging from 0 to 1, Effects Of Smoke On Electronic Equipment with higher values indicating greater importance and risk of damage. Because the tests used clean burning hydrogen, the applicability of these results is limited with respect to smoke damage, but does provide guidance for identifying components that are both important to plant operation and sensitive to environmental conditions. 

It is also worth noting that this assessment applies almost exclusively to analog technology. Equipment Exposure to Full-Scale Fire Environments In response to reports of significant damage caused by so called "secondary environments”created by fires in NPP and other applications, Effects Of Smoke On Electronic Equipment Sandia National Laboratories (SNL) performed a number of cabinet burn tests aimed to better understand the safety issues associated with fires in NPPs. 

These environments include elevated temperatures and humidity and the presence of particulates and Effects Of Smoke On Electronic Equipment corrosive gases. The primary goal was to determine functionality of components when exposed to these environments. Data were also collected to characterize the environments to which those components were exposed. In addition to the burn tests, a small number of thermal failure and long term corrosion tests were included.

The components used in the tests were selected to represent the most easily damaged NPP electrical components, as identified in Ref. [14]. Some of these were powered during the test and subject to active monitoring, while others were unpowered and Effects Of Smoke On Electronic Equipment evaluated for functionality after the test was complete. 

In order to add conservatism and represent a wider variety of designs, Effects Of Smoke On Electronic Equipment some components were placed in non-standard orientations or modified (such as by removal of protective cases) to increase susceptibility to expected causes of failure.Five burn tests were performed, all using unqualified 1 polyvinyl chloride (PVC)-insulated cable as the fuel package. 

Room size and cabinet configuration were varied as was the arrangement of components. The fires lasted between 15 minutes and 40 minutes, Effects Of Smoke On Electronic Equipment and exhibited peak heat release rates between 185 kW and 995 kW. The fires were allowed to burn completely; no suppression was used. Component failures and degradation due to the room-scale burn test were as follows: Switches exhibited slight sensitivity to fire exposure. 

For some, a small number of voltage stresses (at most 15 Vac) were required to resume conduction while others had only slight increases in contact resistance. Fire size and Effects Of Smoke On Electronic Equipment exposure were seen as the most significant factors contributing to degradation. Overall, fire exposure did not impede normal operation of the switches tested. 

Relays (powered and unpowered) showed minor signs of corrosion after testing but did not suffer any loss of functionality. Meters did not suffer any loss of functionality. It is noted that these are generally well sealed, Effects Of Smoke On Electronic Equipment making them less susceptible to infiltration by products of combustion. Pen-based chart recorders suffered mechanical failure due to particulate deposition. 

There was no indication of electrical failure. Electronic counters did not fail during the burn test, Effects Of Smoke On Electronic Equipment despite significant particulate deposition. Some power supply and amplifiers responded adversely to increased temperatures, but were not affected by the products of combustion and functioned properly after the test. 

Cost Of Removing Vinyl Asbestos Floor Tile

Certification of individuals required; exemptions; qualifications; application; fee; renewal. (a) Except as otherwise provided in this act, no individual person shall engage in an asbestos project unless the person holds a Asbestos Abatement Cost Of Removing Vinyl Asbestos Floor Tile certificate issued by the secretary for that purpose.Â&nb  read more..

Trauma Scene Management Biohazard Remediation

Law enforcement officers and correctional officers may face a number of situations where there is occupational exposure to blood and other potentially infectious materials. In its publication "Guidelines for Prevention of  Crime Scene Cleanup Trauma Scene Management Biohazard Remediation Transmission of Human Immunodeficiency Virus and Hepatitis B Virus   read more..

Water Damage

Often, following some sort of water damage like a burst pipe or a thunderstorm that has caused damage to a house or business allowing water to enter creating a Electronic Restoration Water Damage. This will require the restoration of the electronic equipment that's in the building back to its original state. There are certa  read more..

Telltale Signs Of People Making Meth

This guidance is based on many other states’ intensive studies, technical guidance documents and pastexperiences with clandestine drug lab cleanups over the last several years including the states ofMinnesota, Tennessee, North Carolina, Colorado, Washington, Missouri Meth Lab Cleanup Telltale Signs Of People Making Meth and Indiana. The  read more..

California Asbestos Tile Removal Requirements

Identifying hazardous materials before starting work on a project site protects worker health and safety, building occupants, and the financial viability of the project. Doing this up front can help you choose the appropriate inspectors, consultants and contractors and avoid costly change orders or  read more..

What Is FE6 Security Fencing

Hurricane Ike 2008 Ike was a long-lived and major Cape Verde hurricane that caused extensive damage and many deaths across portions of the Caribbean and along the coasts of Texas and Louisiana. It originated from a well-defined tropical wave that moved off the west coast of Africa on August 28 and t  read more..

Grants For Hurricane Damage Tree Removal

Metro-Dade County used different communications strategies for each stage of the debris management effort. In the days following the hurricane, city officials gave about 10 television and radio interviews each day, in which they asked residents to carry their garbage to the nearest cleared stre  read more..

Flooded Areas With Lead based Paint Tennessee

(ATLANTA – May 26, 2010) – Due to recent flooding in western and central Tennessee, the U.S. Environmental Protection Agency (EPA) in Region 4 wants to ensure that families are not at increased risk for lead poisoning, because of clean up and/or Flood Damage Flooded Areas With Lead based Paint Tennessee repair work. 

  read more..

Tenant Move Out

So, any relation between narrow rates, such as those in the normal, and any principal level of tolerance has been unclear. It is significant that some air unceasingly enters buildings through unseen openings, like doors and windows. Such penetration raises the actual aeration rate by a slight, bu  read more..

Call A Lead Paint Removal Specialist

Paint or varnish peeling, chipping or flaking? Mop floors to clean instead of sweeping. Carpets are good to cover painted wood floors. Wet scrape or wet sand to avoid creating dust: repaint surface with two coats of paint; encapsulant paint is the best. Painted Furniture & toys have paint chi  read more..