Smoke Damage >> How To Remove Soot Stains From Stucco

In a final report in the series of non-thermal damage experiments, SNL reports on previously unpublished results including tests of conformal coatings, digital throughput, memory chips, hard disk drives, and electrical properties of fire smoke [19].2.1.7.1 Conformal Coatings In order to gauge the ability of conformal coatings to mitigate the effects of smoke exposure, a battery of high smoke load (200 g/m2) exposure tests were performed on functional boards with a variety of How To Remove Soot Stains From Stucco conformal polymer coatings (listed in Table 5, below) [19]. 

The circuits tested were the previously discussed HVLC, HCLV, HSD, HFTL and HFLPF constructed from PTH and SMT components. There were variations in response with different coating chemistries and electrical components, but in general, How To Remove Soot Stains From Stucco coated boards were less susceptible to damage than bare boards. 

When constructed from PTH components, the HVLC circuit maintained its resistance best with parylene or polyurethane coatings and How To Remove Soot Stains From Stucco varied the most (excepting the bare board) with the silicone coating. The SMT components maintained resistance well with parylene, polyurethane and acrylic coatings. Although the expected and most commonly observed degradation mode in the HVLC circuit was a loss of resistance, some PTH components showed increases in resistance during the burn phase of testing. 

It should also be noted that the epoxy coated SMT board did not recover appreciably after smoke was vented from the chamber, a behavior which was not observed in any other configurations (including bare boards).In the HCLV tests, How To Remove Soot Stains From Stucco only the bare SMT board showed a noticeable change. After the burn began,the resistance of the circuit rose from 1.46 Ω to 1.49 Ω. 

Resistance continued to increase slowly until the chamber was vented, at which point it remained constant. The bare SMT board showed no signs of recovery. With such a small change in resistance, How To Remove Soot Stains From Stucco it is not clear that this is a significant result. The HSD was protected very well by all conformal coatings. Of the 18 bare boards (9 SMT and9 PTH), 7 PTH boards and one SMT board experienced momentary transmission failures at some time after testing. 

Also, post test measurements showed that fall time response on the bare PTH increased from 1.6 ns to 2.2 ns, while SMT and How To Remove Soot Stains From Stucco all coated boards remained unchanged. As observed in previous tests, the bare transmission line circuits showed increased forward coupling at 50 MHz and decreased forward coupling at 500 MHz and 1 GHz while smoke was present. 

Coated boards showed no coupling response to smoke.The bare HFLPF circuits were mildly affected by smoke exposure, How To Remove Soot Stains From Stucco while coated boards showed almost no response.2.1.7.2 Digital Through put Smoke exposure tests were performed with a variety of fuels to determine the impact of smoke exposure on digital cable connectors [19]. 

A circuit board with linked pairs of D-sub miniature 9-pin (DB-9), D-sub miniature 25-pin (DB-25) and How To Remove Soot Stains From Stucco network modular (RJ-45) connectors was placed in the exposure chamber. Digital signals from a personal computer outside of the chamber were routed through this board in order to determine the impact of smoke upon these connectors. 

PVC, Douglas fir and jet fuel were used as fuels for these tests, rather than the standard cable mixture.DB-9, DB-25 and RJ-45 connectors were tested simultaneously in 19 tests and How To Remove Soot Stains From Stucco showed no signs of failure. Subsequent tests performed by intentionally bridging signal lines with a variable resistance indicate that conductance between pins on a connector must closely approach the conductance of the cables themselves before there is a significant risk of failure.2.1.7.3 

Memory Chips Smoke exposure tests were performed on memory chips to determine functionality and How To Remove Soot Stains From Stucco attempt to isolate physical parameters that can predict chip failure [19]. The standard exposure method and fuel mixture were used, with additional electrical testing continuing for one hour after venting the chamber. 

Smoke loads of 30 g/m3, 35 g/m3, 50-60 g/m3, and How To Remove Soot Stains From Stucco 150 g/m3were used.The five types tested were 3.3 V volatile Static Random-Access Memory (SRAM), 5 V volatile SRAM, DIP Erasable Programmable Read-Only Memory (EPROM), plastic-leadless chip carrier(PLCC) EPROM and 5V non-volatile SRAM.

Functional testing of the chip consisted of repeatedly writing data to the chips and reading it back. The response time of the chips and How To Remove Soot Stains From Stucco the error rate of read/write operations were recorded.The parametric measurements monitored leakage current behavior. 

The current drawn when the chip was powered but not operating, current when a standard voltage is applied to a given pin and How To Remove Soot Stains From Stucco the voltage required to maintain a particular current were measured repeatedly at 30 s intervals. The exposure tests for electronic memory determined both functionality and the electrical parameters (voltage, current etc.) of the chips during and after smoke exposure. 

Functionality was determined by the ability of the chip to be accurately written to and read from. Table 6 indicates success and failure rates. The non-volatile SRAM suffered no failures even at higher (150 g/m3) fuel loads. Comparison of failures to the parametric data showed no consistent correlation between leakage current and How To Remove Soot Stains From Stucco failure. 

When the 3.3 V SRAM chips failed, How To Remove Soot Stains From Stucco their operating current roughly doubled,while the operating current of the 5 V SRAM dropped to half of normal during failure. Although some of the recorded failures occurred shortly after the smoke chamber vented, all chips functioned properly when tested several weeks later, indicating recovery after exposure.2.1.7.4 

Hard Disk Drives Hard disk drives (HDD) isolated from other computer components were tested for read/write functionality during and after exposure and How To Remove Soot Stains From Stucco were scanned for corrupted data sites after exposure[19]. Five drives were tested six times. In the first test the drives were oriented as they would be in normal use. 

In all subsequent tests, How To Remove Soot Stains From Stucco the drives were inverted to increase soot deposition onto exposed circuit boards on the underside of the drives. The standard smoke exposure method was used with fuel loads of 15 g and 30 g. In two of the tests, the nitrogen purge protecting the optics was deactivated, to prevent the dry nitrogen from lowering the humidity of the chamber. 

All drives passed the in situ functionality tests. One of the 5 disks showed signs of corrupted data,but the cause was not identified.2.1.7.5 Electrical Measurements Two important electrical properties of smoke are conductivity in the gas phase and How To Remove Soot Stains From Stucco conductivity on surfaces. Surface conductivity measurements were performed with the previously described interdigitated comb and a specialized low-mass comb board. 

Gas conductivity was measured with pairs of freestanding, parallel perforated stainless steel plates. Masses of fuel between 1.5 g and 19 g were used.The comb patterns were biased with 5 V, 50 V and 500 V during exposure. Current flow was measured continually during and How To Remove Soot Stains From Stucco after exposure. The boards were weighted and visually inspected after exposure, to identify the mass and physical distribution of the deposited smoke.

Tenant Right Eviction

TENANT OBLIGATIONS Sec. 34.03.120. Tenant obligations.(a) The tenant(1) shall keep that part of the premises occupied and used by the tenant as clean and safe as the condition of the premises permit;(2) shall dispose all ashes, rubbish, garbage, and Tenant Move Out Cleanup Tenant Right Eviction other waste from the dwelling unit   read more..

Tree Removal From Flood Damage

Monitoring costs in operations we reviewed ranged from 20% to 33% of the total cost of debris operations. Other reviews have reported monitoring costs of as FEMA's Oversight and Management of Debris Removal Operations Page 23 much as 50% of total debris costs. Having enough FEMA, state, or local off  read more..

Certified To Do Lead Removal

If you wish to become certified to do lead-related construction work in California, you must take training from one of the Department of Public Health's (CDPH) accredited training providers. To find out where you can take the this training, go to this link to see the list of approved lead-related co  read more..

Water Damage

Following any kind of water damage, whether it's from a ruptured water heater or from a flood, there will need to be Dehumidification Water Damage. Of course, the amount of water will make the water extraction procedures drastically different but the cleanup in some ways will be the same. Before any water damage clea  read more..

Clear Your House Of Radon

EPA's Assessment of Risks from Radon in Homes In 2003 the Agency updated the estimates of lung cancer risks from indoor radon based on the National Academy of Sciences' (NAS) latest report on radon, the Biological Effects of Ionizing Radiation (BEIR) VI Report(1999). EPA worked Radon Mitigation Clear Your House Of Radon closely wit  read more..

OSHA Lead Paint In Construction Standard

In the OSHA Lead in Construction Standard, manual sanding is listed as a work method that, in the absence of previous exposure data, is initially presumed to expose employees to lead in excess of 50 mg/m3 but not in excess of 500 mg/m3 . However, the arithmetic mean for the nine 30-min exposures in   read more..

Dispose Of Lead Paint Chips

The permissible exposure limit(PEL) set by the standard is 50 micrograms of lead per cubic meter of air (50 µg/m3), averaged over an 8-hour workday. E. Action level: The interim final standard establishes an action level of 30 micrograms of lead per cubic meter of air(30 µg/m3), averaged   read more..

Mold Treatment For A Flooded Basement

Because dealing with a flooded area can be dangerous, extra safety precautions should be taken.When in doubt, contact the City of Columbus Health Department.Please follow these safety tips: Because electrocution is always a danger in a flooded basement, Basement Drying Mold Treatment For A Flooded Basement wait until the water recede  read more..

Metal Roof Leak From Hail Damage

Design and Construction in Coastal A Zones Hurricane Katrina Recovery Advisory FEMA December 2005 Purpose: To recommend design and construction practices in coastal areas where wave and flood conditions during the base flood will be less severe than in V Zones, Structural Drying Metal Roof Leak From Hail Damage but still cause signifi  read more..

Water Damage Restoration For Electronics

Second, although self-healing does occur in the conductive polymer due to degradation of the polymer's conductivity at high temperatures, this self-healing mechanism is not thought to be as effective as the self healing mechanism of MnO2-based tantalum capacitors. Decomposition of the conductive pol  read more..