Smoke Damage >> Smoke Damage Cleanup Tips

This report presents a review of smoke production measurement, prediction of smoke impact as part of computer-based fire modeling, and measurement and prediction of the impact of smoke through deposition of soot on and  Smoke Damage Cleanup Tips corrosion of electrical equipment. 

Equipment damage from smoke stems primarily from an increased resistance in circuits and connections by corrosive metal loss, and creating conductive paths for current leakage due to smoke deposition. The former Smoke Damage Cleanup Tips may take hours or days after the fire is extinguished to manifest itself in equipment failure, while the latter may occur at failure levels any time soon after initial smoke exposure. 

The literature review on smoke corrosivity testing and damage due to smoke deposition emphasizes (despite extensive research on smoke corrositity) the lack of validated and widely Smoke Damage Cleanup Tips applicable prescriptive or performance-based methods to assure electrical equipment survivability given exposure to fire smoke. 

Corrosion failures following smoke exposure take days or longer to manifest themselves, and Smoke Damage Cleanup Tips corrective actions in the interim time can take place if the exposure is not too severe and intervention is timely. Circuit bridging via current leakage through deposited smoke was identified as an important mechanism of electronic and electrical equipment failure during NPP fires. 

In order to assess the Smoke Damage Cleanup Tips potential for damage due to smoke exposure, relationships between smoke exposure and the failure of real electronic components need to be established. A smoke damage routine developed for a fire model could then assess the near term (during and soon after exposure) damage potential of electronics and electrical components design fire exposures. 

Understanding of absorption of acid gases by smoke and its deposition on surfaces (as a function of temperature, humidity, and smoke reactivity) would be necessary to develop models that could estimate the Smoke Damage Cleanup Tips deposition behavior of smoke. 

EFFECT OF CORROSION PROBE THICKNESS In the longer term, better understanding of combustion, gas-phase, and liquid chemistry could allow Smoke Damage Cleanup Tips estimates of the formation rate of smoke and acid gases as a function of the ventilation, thermal, and fire environments.

In Part 4 [78] of the PFPC study, it is noted that for the cone corrosimeter that the amount of corrosion lost as measured by the 2500 … probe was always higher than that measured by the 45 000 … probe for the same Smoke Damage Cleanup Tips material. Since corrosion is a localized phenomenon, it is possible for different parts of a conductor to have different amounts of material removed. 

Considering the test probe as a series of resisters with different heights (due to local pitting) but the same width and length, the total Smoke Damage Cleanup Tips resistance of the probe can be quite different than that of a probe of average thickness throughout. 

To show the impact of the thickness of the probe and the local variability of the corrosion, consider Figure B-1. It shows a range of Smoke Damage Cleanup Tips probes with thicknesses from 2500 Å to 40 000 Å exposed to the same test environment. 

The "average loss” numbers are from the original data and are determined by calculation from total probe mass loss assuming mass is lost uniformly across the Smoke Damage Cleanup Tips probes. Modeled measures of metal loss (indicated by resistance change) with pitting. 

To estimate the impact of random pitting of a probe, a hypothetical probe was divided into a number of Smoke Damage Cleanup Tips sections with the same width and height, but with a random variation in section height chosen such that the total mass lost was consistent with the average value. 

As can be seen the thicker the probe, the closer the average of the experiments matches the average mass loss calculation. For thinner probes, this results in individual Smoke Damage Cleanup Tips sections particularly thin with higher resistance values. When the whole probe is considered as resistances in series, this results in a higher overall resistance. 

ANALYSIS OF GAS COLLECTION IN A CORROSION TEST APPARATUS To extend the type of analysis of Gandhi [97,98] to consider the withdrawn ASTM E05 test, this Smoke Damage Cleanup Tips section provides an idealized analysis of the gas volume within an arbitrary test chamber. 

The difficulty modeling the ASTM E05 test is the expansion bag, because that leads to a changing volume. Assuming an idealized expansion bag that keeps the pressure in the Smoke Damage Cleanup Tips chamber constant leaves three state variables to describe the chamber.

Mass in chamber, M, the volume of the chamber V and the temperature in the chamber T. Because the chamber captures and holds all the effluent the change in mass can be described by where mb is the rate of the mass of the Smoke Damage Cleanup Tips sample burning and  is the ratio of mass entrainment rate to mass burned rate as a function of height above the sample and the HRR of the sample. 

An energy balance can be used to calculate the temperature where E is the enthalpy in the chamber, c p is the heat capacity of air at constant pressure and Tin is the temperature of the mass entering the Smoke Damage Cleanup Tips chamber from the burning sample. Solving for rate of change of temperature yields. 

Differentiating the volume using the ideal gas law gives where P0 is the constant pressure in the Smoke Damage Cleanup Tips chamber and R R Mave with R being the ideal gas constant and Mave is the average mass of a molecule of air. 

Notice that the rate of change in the volume is directly proportionally to the rate of change in the enthalpy in the chamber so that Calculating P0 in terms of initial conditions, making the Smoke Damage Cleanup Tips substitution in the previous equation and grouping terms results in which interestingly enough is virtually the nondimensionalized differential equation for the volume. 

The three state equations that govern the gas collection system have now been defined. To understand the Smoke Damage Cleanup Tips impact of a gas collection system on the corrosion test, it is important to look at factors that control corrosion, in this case the products produced by burning a test sample. 

Gandhi’s analysis focuses on the mass fraction, Ya, of a species a given that some fraction, y a, of the mass burned becomes a. While this  Smoke Damage Cleanup Tips  assumption ignores details of any reaction chemistry, it is appropriate for a simple analysis of these gas collection systems. 

For the ASTM E05, test, consider what happens if a constant fraction of the mass burned, mb goes to producing a. That produces the following equation for the mass of a in the chamber, which Smoke Damage Cleanup Tips can be written as M·Ys with Ys being the mass fraction of a Solving forgives Since corrosion is based on the concentration, which can be very different from the mass fraction.

Especially if the volume of the chamber changes, the change in concentration is given by Combining and simplifying gives Gandhi non dimensionalizes the Smoke Damage Cleanup Tips equations using the initial conditions to result in the following equations for the ASTM E05 gas collection system

Animal Control How To Get Rid Of Squirrels In The

Evaluate animal damage management needs and conduct predator control in cooperation with the Forest Service, state agencies, and permittees. Serve as lead agency for preparing Animal Damage Animal Control How To Get Rid Of Squirrels In The environmental documentation on animal damage management activities initiated by APHIS on National Forest System lands.   read more..

Dehumidify A Flooded Home Without A Dehumidifier

As illustrated in Figure 1, the evaporator (c) and the condenser (e) are the most critical components and dominate the system performance. The evaporator is fitted with a porous tower-packing material, in this case HD Q-PAC® structured media (Lantec Products, Inc., Agoura Hills, CA), Dehumidification Dehumidify A Flooded Home Without A Dehumidifier&n  read more..

Freeze Dry Documents For Water Restoration

About 25 Alabama counties are already preparing loose marriage licenses, divorces, estate case files, and Confederate pension records for microfilming by the GSU. Another 15 counties have expressed interest in starting a loose records project. If your county government, historical society or genealo  read more..

Compulsive Hoarding Fire Damage

Because compulsive hoarding is a disease that involves the collection of items that could be considered of little or no value and in most cases a person that is a compulsive hoarder will collect some many items at their homes become a hazard especially when it comes to fire. As the compulsive   read more..

How To Remove Lead Paint From Wood

There are several ways to remove lead-based paints: Wire brushing or wet hand scraping with the aid of a non-flammable solvent or abrasive compound. Liquid paint removers can be used on small areas, such as windowsills, doors and woodwork. Read and follow the manufacturer's instructions and warning   read more..

Safe Ways To Remove Mold

Mold Health Risks Molds are small organisms found almost everywhere, inside and outside, including on plants, foods and dry leaves. Molds are beneficial to the environment and are needed to break down dead material. Very tiny and lightweight, mold spores travel easily through the air. When molds are  read more..

Cleanup After A Tenant Trashes A Rental

Acceptance of rent with knowledge of a default by the tenant or acceptance of performance by the tenant that varies from the terms of the rental agreement or rules or regulations subsequently adopted by the landlord constitutes a waiver of the right of the landlord to terminate the rental agreement   read more..

About Radon Radon Myths

Radon Myths MYTH: Scientists aren't sure radon really is a problem. FACT: Although some scientists dispute the precise number of deaths due to radon, all the major health organizations (like the Centers for Disease Control and Prevention, Radon Mitigation About Radon Radon Myths the American Lung Association and the American  read more..

How To Cure Hoarding

We are anticipating a significant and sustained increase in the number of hoarding cases that will be brought to the attention of community agencies. The increase is in part the result of greater public awareness of the hoarding phenomena through various media efforts and Hoarding How To Cure Hoarding the overall   read more..

Black Mold Regulations

Moisture control is the key to mold control, the Moisture Control Section from Biological Pollutants in Your Home follows:Moisture Control Water in your home can come from many sources. Water can enter your home by leaking or by seeping through basement floors. Showers Mold Remediation Black Mold Regulations or even cooking  read more..