Electronic Restoration >> How To Clean An Electronic Circuit Board After A F

Collected papers from scientific and technical conferences, symposia, seminars, or other meetings sponsored or cosponsored by NASA. SPECIAL PUBLICATION. Scientific, technical,or historical information from NASA programs,projects, and mission, often concerned with How To Clean An Electronic Circuit Board After A F subjects having substantial public interest. 

TECHNICAL TRANSLATION. English-language translations of foreign scientific and technical material pertinent to NASA’s mission.Specialized services that complement the STI Program Office’s diverse offerings include creating custom thesauri, building customized databases, How To Clean An Electronic Circuit Board After A F organizing and publishing research results . evenproviding videos. 

This section provides a description of the purpose of this document, its scope, and general instructions that apply to each of the 18 electrical, electronic, How To Clean An Electronic Circuit Board After A F and electro mechanical (EEE) partcategories that are covered in this document. An electronic copy of this document can bedownloaded from http://nepp.nasa.gov. 

The electronic copy provides a direct link to themilitary/industry specifications and standard test methods listed in each section. However, usersshall independently verify that the specifications and Test Methods are the latest revisions issued bythe responsible authority.Due to the dynamic nature of this document, How To Clean An Electronic Circuit Board After A F users are advised to check thehttp://nepp.nasa.gov website prior to every usage to obtain the latest document revision.

PURPOSE The purpose of this document is to establish baseline criteria for selection, screening, qualification, How To Clean An Electronic Circuit Board After A F and derating of EEE parts for use on NASA GSFC space flight projects. This document shall provide amechanism to assure that appropriate parts are used in the fabrication of space hardware that will meetmission reliability objectives within budget constraints.

All acronyms used in this document are listed in the acronym table at the end of this section on page11.2.0 SCOPEThis document provides instructions for meeting three reliability levels of EEE parts requirements (see6.0) based on mission needs. The terms "grade" and "level" are considered synonymous; i.e., a grade 1 part is consistent with reliability level 1. Levels of part reliability confidence decrease by reliability level, How To Clean An Electronic Circuit Board After A F with level 1 being the highest reliability and level 3 the lowest. 

A reliability level 1 part has thehighest level of manufacturing control and testing per military or DSCC specifications. Level 2 partshave reduced manufacturing control and How To Clean An Electronic Circuit Board After A F testing. Level 3 Parts have no guaranteed reliability controls inthe manufacturing process and no standardized testing requirements. 

The reliability of level 3 parts canvary significantly with each manufacturer, part type and LDC due to unreported and frequent changes indesign, construction and materials.GSFC projects How To Clean An Electronic Circuit Board After A F and contractors shall incorporate this guideline into their Project EEE Parts Program.3.0 DEFINITIONS Screening. Screening tests are intended to remove nonconforming parts (parts with random defects thatare likely to result in early failures, known as infant mortality) from an otherwise acceptable lot and thusincrease confidence in the reliability of the parts selected for use.

Qualification. Qualification testing consists of mechanical, electrical, and environmental inspections,and is intended to verify that materials, design, performance, How To Clean An Electronic Circuit Board After A F and long-term reliability of the part areconsistent with the specification and intended application, and to assure that manufacturer processes areconsistent from lot to lot.

Derating. Derating is the reduction of electrical and thermal stresses applied to a part during normaloperation in order to decrease the degradation rate and prolong its expected life. Source Control Drawing (SCD)- Provides an engineering description (including configuration, partnumber, marking, reliability, environmental, functional / performance characteristics), How To Clean An Electronic Circuit Board After A F qualification requirements and acceptance criteria for commercial items or vendor developed items procurable from aspecialized segment of industry that provides for application critical or unique characteristics.

Vendor Item Control Drawing (Formerly known as Specification Control Drawing) - Provides anengineering description (including configuration, performance, reliability, environmental, functional characteristics) and How To Clean An Electronic Circuit Board After A F acceptance criteria for commercial or vendor developed items that are procurablefrom a specialized segment of industry. 

The drawing is used to provide an administrative controlnumber, but the item is marked with the vendor's part number.NOTE: For the purposes of this EEE Part Instruction document, in the Screening and Qualification tables, How To Clean An Electronic Circuit Board After A F the term SCD is used to convey any user developed EEE part procurement control documentwhether 

Source Control Drawing or Vendor Item Control Drawing, How To Clean An Electronic Circuit Board After A F regardless of qualification requirement. Part types that do not fall into one of the preceding categories listed in paragraph 5.1 shall be reviewed on a case-by-case basis using the closest NASA, DSCC or government controlled specification as abaseline. 

The review shall ensure that parts meet the reliability requirements of its intended space flightapplication and shall cover the selection, screening, qualification and applicable derating. In the event asuitable government baseline specification does not exist, How To Clean An Electronic Circuit Board After A F the user shall approach the project partsengineer to identify the parts expert who can provide information on the best available industry standards to develop procurement specifications that meet the reliability goals.6.0 

INSTRUCTIONS EEE parts shall be processed in accordance with the detailed requirements for the applicable part typesand quality levels specified in Sections C1 through W1. Each section contains selection, How To Clean An Electronic Circuit Board After A F screening,qualification, and derating tables. All tests shall be performed in the order shown unless otherwiseapproved by the project. 

Exceptions or additions to the requirements specified in any section shall bedefined in the project MARs document. Applicable part quality levels shall be as defined by the projectin the MARs. As a How To Clean An Electronic Circuit Board After A F guide to project managers, design leads, and System Assurance Managers (SAMs),the following are typical mission characteristics applicable to each quality level:

Level 1: Parts shall be selected and processed to this level for missions requiring the highestreliability and lowest level of risk. Level 1 active parts shall be reviewed for radiation hardness, and How To Clean An Electronic Circuit Board After A F radiation testing is required when information is not available. The typical mission duration for Level 1programs is 5 years or greater.

Level 2: Parts shall be selected and processed to this level for missions with low to moderate risk, How To Clean An Electronic Circuit Board After A F balanced by cost constraints and mission objectives. Level 2 active parts shall be reviewed for radiationhardness, and radiation testing is required when information is not available. The typical missionduration for level 2 programs varies from 1 to 5 years.

Radon Testing

Heat Recovery Ventilation (HRV) systems shall not be installed in rooms that contain friable asbestos. 14.8.4 In HRV installations, supply and exhaust ports in the interior shall be located a minimum of 12 feet apart. The exterior supply and exhaust ports shall be positioned to avoid blockage by sno  read more..

Nashville Flooding And Trash Clean Up

Nashville flooding, FEMA Disaster No. DR 1909 TN (Source: FEMA) Some contractors, in order to increase their payments under their debris removal contract, will collect ineligible debris, such as debris not located on the right-of-way, Flood Damage Nashville Flooding And Trash Clean Up and haul it to the collection site for payment.&nb  read more..

First Steps During A Sewage Back up Into Your Home

First Steps During a Sewage Back-up Into Your Home. Call DPW Customer Service (864-7428) to report the back up. Your call will be logged in our tracking system. The City will dispatch crews to check the public sewer line. Although the City is not usually responsible for the back-up into private prop  read more..

Companies That Clean Rentals

Landlord's noncompliance as defense to action for possession or rent. (a) In an action for possession based upon nonpayment of the rent or in an action for rent when the tenant is in possession, the tenant may counterclaim for any amount recoverable under the rental agreement or this chapter. If a c  read more..

Cleaning Up Water In Carpet

Daily wear and tear means that materials, furniture and furnishings require periodic replacement.Following are Sustainable Strategies to consider as you replace MATERIALS, FURNITURE AND FURNISHINGS. Refer to the Share Section for a representative project Case Study to discover key practices, benefit  read more..

Fix A High Level Of Radon In A House

Application and Instructions: Instructions and forms to be completed by an applicant to the RPP. Included in this Handbook as Appendix F.Application Device Checklists: Lists of detectors and devices, by method, which have been used successfully by listed participants in the RPP. Included in this [ME  read more..

The Dangers Of Raw Sewage

Establish temperature control to enhance the evaporation rate and effectiveness of ventilation or dehumidification systems in use. All solid waste must be collected and discarded. Use dehumidifiers, fans, window air conditioners and open windows to aid in the drying process when available. Exchange   read more..

Radon Gas

What is Radon gas? Radon gas is a gas produced by the radioactive decay of the element radium. Radioactive decay is a natural, spontaneous process in which an atom of one element decays or breaks down to form another element by losing atomic particles (protons, neutrons, or electrons). When solid ra  read more..

How To Make A Dry Basement Waterproofing

The results reported in Appendix B for the modeled energy savings show the same patterns as those for a foundation wall with no rim joist and no above-grade exposure. Specifically, the first R-5 of insulation produces a significant basement energy savings of 52% with only an additional 12 % of   read more..

DIV Carpet Cleaning From Floods

When drying surface, free and bound water: o Two-day duration quantity equals 50% of the day 1 total number of air moverso Three-day duration sum of air movers for day 2 and 3 equals number for day 1 When drying bound water only the number of air movers per day should remain Structural Drying DIV Carpet Cleaning From Floods the sa  read more..