Parts represent inherently high risk or unknown risk because of the lack of formalized reliability assessment, screening and qualification. Also, there is little dependable data or flight history available for them as the continuous changes in design, materials and How To Clean Electronic Switches manufacturing processes may make the data on any particular LDC not applicable to another LDC. 

Level 3 parts are intended for mission applications where the use of high-risk parts is acceptable. Level 3 active parts shall be evaluated for radiation hardness, and How To Clean Electronic Switches radiation testing is required when information is not available. The typical mission duration for level 3 programs varies from less than 1 year to 2 years. 

Parts Control Boards (PCBs)When PCBs are required by the project MAR or implemented by the contractor or developer, the PCBshall review all parts for compliance to established criteria. Review information shall includespecifications, screening How To Clean Electronic Switches and qualification plans, supporting data, and application requirements requiredto determine acceptability. 

Parts shall be selected in accordance with appropriate part type specification andquality level listed in Table 1of each section in this document. Table 1 also indicates when screening(Table 2) and qualification testing (Table 3) are required for each risk level and How To Clean Electronic Switches part designation. Partprocurement methods are discussed below.6.2.2 

Military Drawings (JAN Certified). Parts procured to Military Specifications or Standard Military Drawings (SMDs) usually contain up to three reliability levels. Not all military levels areacceptable "as is" for space applications. For example, How To Clean Electronic Switches monolithic microcircuits offer classes V, Q, andM. Some passive devices such as resistors and capacitors are listed with S, R, or P establishedreliability levels. 

Table 1 of each section documents which levels can be used as is and which requireadditional screening. It is the responsibility of the user to ensure that DSCC drawings and How To Clean Electronic Switches other militaryspecifications satisfy the requirements specified herein, or to perform additional required inspectionsand tests specified in this document.6.2.3 

Developer Controlled Drawings (SCDs). When parts cannot be procured to MilitarySpecifications, How To Clean Electronic Switches a drawing (such as a Source Control Drawing) should be prepared by the developer tocontrol procurement requirements. The drawing shall include the screening and qualificationrequirements specified in Tables 2 and 3 of this document for the applicable part type. 

The drawingshall also include performance parameters, absolute maximum ratings, dimensions, terminaldescriptions, materials, and other unique requirements. Existing developer SCDs proposed for use shallbe evaluated for compliance to Table 2 and 3 How To Clean Electronic Switches requirements.6.2.3.1 Purchase orders for Manufacturer Screened and Qualified Parts. 

With project approval,unique screening and qualification requirements that are not normally performed by the How To Clean Electronic Switches manufacturer as part of their normal production practice may be placed directly in the purchaseorder in lieu of preparation of a developer-controlled drawing. It is the responsibility of the user torequire test data from the manufacturer in order to verify compliance.6.2.3.2 

For level 1 projects, if an acceptable Government-controlled specification is notavailable, an SCD is required. A preliminary copy of new SCDs shall be sent to the manufacturerfor coordination. If procurement of the part through a SCD is not feasible due to cost, schedule orthe availability of a manufacturer wiling to produce the part to the SCD requirements, How To Clean Electronic Switches the part maybe procured through a purchase order specifying the unique screening and qualificationrequirements as detailed in 6.2.3.1.6.2.3.3 

For level 2 projects, project parts engineer and PCB shall determine if an SCD isrequired for a part type or the purchase order as specified in 6.2.3.1 is adequate to meet project'sreliability requirements.6.2.3.4 Level 3 projects do not require SCDs. However, How To Clean Electronic Switches if an existing procurement documentis proposed for use, the SCD must meet level 3 requirements of this document for theapplicable part type. 

Manufacturer High Reliability Parts. The term "MFR HI-REL" applies to parts that areprocured to a manufacturer-controlled flow as described in the manufacturer's catalog. The part flow iscontrolled only by the How To Clean Electronic Switches manufacturer. A certificate of compliance is furnished by the manufacturer thatthey have been tested as advertised. 

These are often referred to as high reliability parts in themanufacturer's catalog. In some cases, manufacturers add very little to their commercial process flows, How To Clean Electronic Switches and yet call their product "high reliability." It is the responsibility of the user to obtain test data toverify that the screening and qualification requirements specified in this document were met.6.2.5 

Commercial Parts. For the purpose of GSFC projects, this part designation represents all partsthat do not conform to the categories defined above. These parts are procured per manufacturer's datasheet specifications. It is the responsibility of the user to assess the part manufacturer's qualitycapability to produce space quality parts How To Clean Electronic Switches and perform additional screening and qualification tests asdefined in this document.6.2.6 

Plastic Encapsulated Microcircuits (PEMs). The use of Plastic Encapsulated Microcircuitsshall be restricted to applications where no similar high reliability hermetically sealed device exists.The use of PEMs is permitted on GSFC space flight applications, provided each use is thoroughlyevaluated for thermal, mechanical, How To Clean Electronic Switches and radiation implications of the specific application and found tomeet mission requirements. 

A PEM shall not be substituted for a form, fit, and functional equivalent,high reliability, hermetic device in space flight applications. Refer to Section M4 on the detailedinstructions for selection, screening qualification, and derating of these parts. Due to significant lot-tolot variability that can occur in the fabrication processes and technology, How To Clean Electronic Switches each procurement of PEMsrequires a separate evaluation that includes radiation effects. 

The use of Plastic Encapsulated semiconductor devices and hybrids shall follow similar guidelines as for PEMs. Commercial Off-the-Shelf (COTS) Assemblies and Sub-Assemblies. Occasionally it is necessaryto use sensors or other equipment of commercial origin. When commercial units or assemblies arepurchased as off-the-shelf hardware items, How To Clean Electronic Switches PCB shall review their function and reliability for missioncriticality. 

Critical Applications for COTS. When failure of such units represents significantcompromise to mission success, an analysis of the parts for compliance to the requirements of thisdocument shall be performed. Following the results of this analysis, units may be required toundergo modification for use of higher reliability parts, How To Clean Electronic Switches or radiation hardened parts. 

All upgradeparts shall be subject to PCB approval. Modifications such as additional shielding for radiationeffectiveness or replacement of radiation soft parts with radiation hardened parts, How To Clean Electronic Switches may berecommended and may be performed at the user's facility or user-approved facility.

How To Restore Fire Damaged Archive Photos

Designing a preservation program should not be viewed as an arcane process requiring technical expertise in paper chemistry or hands-on conservation skills. It is instead much like other management decision-making: a process for allocating available resources to activities and Document restoration How To Restore Fire Damaged Archive Photos functions impo  read more..

The Best Way To Prepare For A Storm

Lightning's unpredictability increases the risk to individuals and property. Every year, thousands of people are impacted by severe weather threats such as tornadoes and severe thunderstorms. Preliminary data for 2012 shows there were more than 450 weather-related fatalities and nearly 2,600 injurie  read more..

How To Protect A Home In A Flood Plain

Clothing and LinensEven if your washing machine didnot get wet, do not use it untilyou know that the water is safeenough to drink and that yoursewer line works. (Perhaps afriend or relative has a washingmachine you can use until yours isclean and working.) Flood Damage How To Protect A Home In A Flood Plain

Befor  read more..

Flood Damage

Most of the time when there is a tornado or hurricane, there is a certain amount of Emergency Board up Flood Damage, from a long period of rain before, during and after the epicenter of the storm. In order to make preparations for a long duration of steady wind, rain and flying debris, is a good idea to secure your hom  read more..

Health Risks From Lead Paint

Zinc protoporphyrin results from the inhibition of the enzyme ferrochelatase which catalyzes the insertion of an iron molecule into the protoporphyrin molecule, which then becomes heme. If iron is not inserted into the molecule then zinc, having a greater affinity for protoporphyrin, takes the place  read more..

Storm Damage

If your home has sustained a significant amount of Dehumidification Storm Damage because the roof was damaged and the rainwater leaked through. There is a certain procedure that should be followed to minimize the possibility of any other damage like the growth of mold or any other structural damage. Your home should   read more..

Storm Damage Building Demolition Removal Cost

Local governments manage the debris collection process. They can either perform debris collection work with local employees or use debris collection contractors.If contractors are used, their work and charges should be monitored to ensure the contract costs are eligible for FEMA funding and [ME  read more..

Flood Prevention Tips

This is a manual on safe, healthy, green, and affordable rebuilding of water-damaged homes that will: Serve as a workbook for seminars Be distributed to people working on their own homes, volunteers, and other workers as a guide and reference manual Develop work protocols for contractors This manual  read more..

Lead Hazards At Indoor Firing Ranges

Lead Hazards At Indoor Firing Ranges There are approximately 70 commercial indoor firing ranges in California. The majority are small operations, often family-run, that offer instruction and target practice to competitive and Lead Paint Removal Lead Hazards At Indoor Firing Ranges recreational shooters. Many cities also run firing ranges f  read more..

What Is Asbestos

Who is at risk for an what is asbestos-related disease? Everyone is exposed to what is asbestos at some time during their life. Low levels of what is asbestos are present in the air  read more..