Electronic Restoration >> Learn Flood Damage Electronic Restoration

Class T device manufacturers are QML certified and qualified by DSCC, and Class T devices are manufactured on a certified and qualified QML line. Class T flow is developed and approved through the manufacturer's Technology Review Board. Each technology flow ( e.g., wafer fabrication, assembly, screening and qualification, etc.) is developed taking into account application Learn Flood Damage Electronic Restoration requirements of the customers. 

Use of Class T devices in NASA applications requires permission on a case-by-case basis from the NASA Project Office ( i.e., cognizant EEE Parts Authority).(3) MIL-STD-883 Compliant or Class M. This designation includes Learn Flood Damage Electronic Restoration parts that are procured as compliant to Paragraph 1.2.1 of MIL-STD-883. 

The parts may be manufacturer's "Hi-Rel"flow processed parts marked with "/883" or otherwise claim compliance to Paragraph 1.2.1of MIL-STD-883, or parts procured to DSSC drawings that specify "Non-JAN" MIL-STD-883 compliant parts, Learn Flood Damage Electronic Restoration or parts procured to Standard Military Drawings (SMD) quality level"M." 

These parts require that all provisions of Appendix A of MIL-PRF-38535 shall be metby the part manufacturer.(4) Source/ Vendor Control Drawing (SCD). This designation includes parts that are not available to other acceptable procurement methods listed for a specific grade level, Learn Flood Damage Electronic Restoration and must be procured to a user's controlled specification (SCD). 

The SCD shall include screeningand qualification requirements as specified in Tables 2, 3, and 4 herein. The testing requiredby the SCD is performed by the manufacturer and does not have to be performed by theuser. For Program level 1 and level 2 applications, Learn Flood Damage Electronic Restoration an audit/survey of the manufacturer's facility is recommended to verify that their quality and reliability procedures are incompliance with GSFC's requirements.(5) 

Manufacturer High Reliability (Mfr. Hi-Rel). This designation includes parts that areavailable only to a manufacturer's controlled test program as described in themanufacturer's catalog. These parts are controlled only by the manufacturer, Learn Flood Damage Electronic Restoration who assignsthem a special part number and provides a certificate of compliance that they have beentested as advertised. 

This category includes Non-Compliant, Non-JAN parts. It is the responsibility of the user to assure that the parts meet or exceed the testing requirements inTables 2, 3, and 4. For Program level 1 and level 2 applications, an audit/survey of themanufacturer's facility is required to verify that their quality and Learn Flood Damage Electronic Restoration reliability procedures arein compliance with GSFC's requirements.(6) 

Commercial Parts. This designation includes parts that are either hermetic, commercial-offthe-shelf (COTS), or non-hermetic Plastic Encapsulated Microcircuits (PEMs). HermeticCOTS are available only to a manufacturer's specification datasheet and Learn Flood Damage Electronic Restoration are controlled by atest program as described in the manufacturer's catalog. 

It is the responsibility of the user toassure that the parts meet or exceed the testing requirements in Tables 2, 3, and 4 herein.Commercial parts are not approved for Program level 1 applications. For level 2 Learn Flood Damage Electronic Restoration applications, an audit/survey of the manufacturer's facility would be required to verify thattheir quality and reliability procedures are in compliance with GSFC's requirements. 

Nonhermetic PEMs requirements are covered in Section L.(7) Application-Specific Integrated Circuits (ASIC), Highly Complex System-on-Chip (SOC),Semi-Custom, and Masked Gate Arrays. These devices shall meet the requirements of Tables 2, 3, and 4 herein and Learn Flood Damage Electronic Restoration the following:a. For ASICs, additional requirements shall include means of verification of design, simulation, debugging, layout and timing, test pattern generation, and calculation offault coverages. 

All ASICs for Program level 1 and level 2 applications requireSCDs.b. SOC, Semi-Custom, and Masked Gate Array designs that combine multiple technologies, such as analog, digital, and/or RF, Learn Flood Damage Electronic Restoration as well as intellectual property (IP)cores from outside sources, shall require SCDs. Plastic Encapsulated Microcircuits (PEMs) are not covered in this section. 

Refer to Section L for PEMs requirements.2/ Any test required by Tables 2 and 3 that is already performed by the procurement specification (military or SCD) need not be repeated.3/ Class Q (or Class B) microcircuits are acceptable with additional Learn Flood Damage Electronic Restoration testing as level 1 parts only when Class V (or Class S) microcircuits are not available.

Otherwise, the Class V (or Class S) level parts should be used.4/ All microcircuits with a housing cavity (except Class V and Class S) require PIND in accordance with MIL-STD-883, Method 2020, condition A.5/ Class Q or Class B and Learn Flood Damage Electronic Restoration Compliant Non-JAN microcircuits used in level 1 applications require DPA in accordance with S-311-M-70. SCD devices require pre-cap Inspection. 

DPA can be substituted for pre-cap inspection.6/ Class M or Non-JAN Compliant parts (with SMDs) are acceptable as a level 2 part only when a Class Q (or B ) microcircuit is not available. Otherwise, Learn Flood Damage Electronic Restoration the Class Q (or B) level part should be used.7/ Use of Mfr. Hi-Rel and commercial parts in level 1 and 2 applications requires use of SCD (or program specific Parts Procurement Plan) that specifies screening and qualification testing. 

SCD/Parts Procurement Plan shall include audit/survey requirements to ensure the manufacturer's quality/reliability procedures, assembly, and Learn Flood Damage Electronic Restoration testing criteria meets GSFC requirements.8/ Lot specific screening attributes data may be acquired and reviewed for acceptability in lieu of performing the required testing if the data satisfies the requirements of Table 2.9/ 

Lot specific QCI attributes data may be acquired and Learn Flood Damage Electronic Restoration reviewed for acceptability in lieu of performing the required testing if the data satisfies the requirements of Table 3.10/ Level 3 applications parts shall require screening to Table 2. 

No qualification testing per Table 3 is mandatory; however, it is strongly recommendedthat all non-QPL/QML devices have life test in accordance with MIL-STD-883, Method 1005, conditions A-D (as appropriate for device type), Learn Flood Damage Electronic Restoration for 1,000 hours at 125 oC (or equivalent time/temperature per Method 1005, Table 1). 

Tests that are performed as part of manufacturer's normalpractice do not need to be repeated if the test conditions are equal or better than the conditionsimposed by Table 2A, and Lot specific data is available that demonstrates acceptable results.2/ In lieu of pre-cap source inspection or internal visual, Learn Flood Damage Electronic Restoration DPA shall be performed to the requirements of S-311-M-70 specification. 

No failures are permitted.3/ PIND testing need not be repeated if it has been performed by the manufacturer as part of the Learn Flood Damage Electronic Restoration process flow. For level 3, lot jeopardy shall not be required.4/ X-ray can be performed at any sequence after PIND.5/ Read and record (as a minimum) delta parameters listed in Table 2A . 

The non-delta parameters may be tested "go/no-go."6/ For one-time programmable read-only memories (PROMs) and programmable logic devices/arrays (PLDs/PLAs), steps 9 through 11, shall be performedafter the programming, even if they were performed on the blank devices.7/ If more than one burn-in type is required per Table 2A, Learn Flood Damage Electronic Restoration the delta parameters shall be measured after each required burn-in step. 

Also, the deltacalculations shall be made after each burn-in step.8/ See Table 2A and notes 6/ and 7/ therein. The burn-in duration specified herein indicated as "Static/Dynamic" or "Static or Dynamic." Examples: 72/240 requires 72 hours of static burn-in (if applicable) and 240 hours of dynamic burn-in (if applicable), whereas 160 requires 160 hours of either static ofdynamic burn-in, Learn Flood Damage Electronic Restoration as specified in Table 2.

Limit Burn-in temperature to the maximum operating temperature of diode as specified by the Learn Flood Damage Electronic Restoration manufacturer. This temperature may be lower than 125 for commercial or manufacturer's in house Hi- REL parts.10/ Minimum and maximum application temperatures may be used when measuring electrical parameters.

For delta failures greater than 10%, lot data shall be reviewed for acceptance. 12/ PDA applies to cumulative failures during all burn-in steps. The cumulative failures for all Learn Flood Damage Electronic Restoration levels shall include functional/DC parametrics (excluding deltas) for the lot to be accepted.13/ Pure Tin plating is prohibited as a final finish in EEE parts.

Blood Spill From Murder Cleanup Procedures

San Antonio The San Antonio Metropolitan Health District offers the following information as a service to the public when confronted with the unfortunate situation of cleaning up a crime scene in your home or business. Crime Scene Cleanup Blood Spill From Murder Cleanup Procedures This brochure provides guidance for biological crime scenes.

  read more..

Earthquakes

Recent earthquakes around the world show a pattern of steadily increasing damages and losses that are due primarily to two factors: (1) significant growth in earthquake-prone urban areas and (2) vulnerability of the older building stock, Flood Damage Earthquakes including buildings constructed within the past 20 yea  read more..

Mold Mitigation

If there has been a lot of water damage, and/or mold growth covers more than 10 square feet, consult EPA's Mold Remediation in Schools and Commercial Buildings. Although focused on schools and commercial buildings, this Water Damage Mold Mitigation document is applicable to other building types. If you choose to hire  read more..

Tools For Restoring Fire Damaged Electronics

While the conductivity of some conducting polymers may be as much as 100 times higher than that of MnO2, the improvement in capacitor ESR is not this dramatic. What is typically seen is reduction of capacitor ESR by a factor of between 2 and 4. The discrepancy is due to several factors. First,   read more..

How To Prevent Basement Condensation

Perlite is a mined volcanic glass material. When heated, water trapped in the glass matrix vaporizes. As it does so, it expands the heat-softened glass Basement Drying How To Prevent Basement Condensation material, creating a particle with a rough outer surface and an interior composed of closed-cell glass bubbles. He recommends use of this   read more..

Flood Insurance Rates

What is the maximum that can be collected for a loss under the NFIP policy? An insured will never be paid more than the value of the covered loss, less deductible, up to the amounts of insurance purchased. Therefore, purchasing insurance to value is an important consideration. The amount of insuranc  read more..

Recover Documents From Smoke Damage

Because refrigeration may cause the paste to lose its tack, keep it at room temperature. It is best to make small batches, since the paste does not usually keep for more than a week. A preservative can be added, Document restoration Recover Documents From Smoke Damage but these chemicals are toxic and not recommended.

Microwave Wheat   read more..

How To Restore Flood Damaged Photos

The first formulation of standards of practice and professional relations by any group of art conservators was produced by the IIC-American Group (now AIC) Committee on Professional Standards and Procedures. Document restoration How To Restore Flood Damaged Photos

Formed at the second regular meeting of the IIC-AG, in  read more..

Asbestos Removal Specifications In Tennessee

Counting Fibers (1) Place the prepared sample slide on the mechanical stage of the microscope. Position the center of the wedge under the objective lens and focus upon the sample. (2) Start counting from one end of the wedge and Asbestos Abatement Asbestos Removal Specifications In Tennessee progress along a radial line to the other end (c  read more..

Bomb Cleanup

Regardless of meaningfully improved authority and state efforts to make sure that local administration are prepared for Debris Removal Bomb Cleanup processes, most local administrations are not well informed concerning the techniques they must follow to establish economical and guideline-compliant debris removal pr  read more..