Emergency Board up >> Hurricane Safety Procedures

The contractor must submit drawings to DCAM through the Department or Agency for approval of any windows or openings to be sealed by any method other than that shown in sketches listed in number 1 above.9. For windows over 48 inches wide or 96 inches in height, the contractor must submit drawings to DCAM through the Department or Agency for approval showing method of framing the plywood enclosure and Hurricane Safety Procedures the method of securing to the building. 

Such method shall comply with the intent of attached sketches. Doors 1. An emergency access/egress door shall be provided at the front and rear of each building, or Hurricane Safety Procedures as otherwise determined by the local fire and public safety officials inconjunction with DCAM. Each emergency access/egress door shall be installed as perattached sketch #7. 

All locks shall be keyed alike with three (3) keys. Keys shall beturned over to the local fire department one (1) and DCAM Office of Surplus Propertytwo (2).2. Emergency access/egress doors are to be painted fire engine red. The building number Hurricane Safety Procedures and location of the door are to be painted in red on a yellow background as perattached sketch #7.3. 

Doors designated emergency access/egress doors shall be shown on the plot plan, and Hurricane Safety Procedures a copy of this plot plan shall be given to the local fire department.4. Note: Emergency access/egress doors must open without binding or sticking.Contractor shall replace any hinges or hardware on these doors so they shall operateproperly. 

Any doors designated as access/egress doors which cannot be repaired shall be replaced.5. All other exterior doors up Hurricane Safety Procedures to a height (bottom of threshold) less than 12’ above gradeshall be permanently sealed with 3/4” exterior grade plywood, type CDX per below. A. Remove and dispose of all screen doors.B. Remove doorknob.

C. Existing mortised lock to remain and be secured in the locked position.D. Cut plywood to overlap door, hinges and Hurricane Safety Procedures doorjamb.E. Secure plywood with minimum 2" long galvanized screwnails 6" on center aroundthe perimeter of door into the doorjamb and through the center of the door bothhorizontally and vertically.

F. If doorframe is rotted, contractor shall provide new nailing strip (2 x 4s) to replaceframe.6. Plywood shall be stained on all edges and both faces with a combination exteriorgrade stain and Hurricane Safety Procedures sealer. For doors to be permanently sealed, color of stain shall matchthe building exterior. Fire Escapes Remove from all buildings, fire escapes and ladders attached to buildings up to aheight of 12 feet above grade.2. 

Doors and windows above the first floor level shall also be sealed per these procedures if they are accessible from outside stairs and landings or Hurricane Safety Procedures if required by Department of Public Safety or the local Fire Department. Building Interior General Notes For:Electricity/Water/Telephone/Gas:The intent of cold securing a building is to completely discontinue electrical power, water service, telephone service and gas service to the building by terminating the services at the street.

Make arrangements with DCAM to pay all utility bills. All utility bills must be paidin full prior to acceptance of property by DCAM.If unable to comply with this policy based on conditions beyond the control of theDepartment or Agency (due to requirements of the Department of Public Safety orthe local Fire Department), Hurricane Safety Procedures the Department or Agency must notify DCAM and attempt to discontinue, internally, as many service as possible as per below.1. 

Turn off the water supply to the building. Close the shut-off valve located directly outside of the building. If the outside valve does not shut off the water flow completely, Hurricane Safety Procedures install new valve. If no exterior valve exists and electrical power is toremain on, close internal shut off valve, install heat tracing and insulation around thewater main from the inside of the building wall up to and encase the inside shut-offvalve. 

If no electrical power exists, a new exterior shut off valve must be installed.2. Drain all sanitary plumbing systems and pump out by a suction pump or compressedair, Hurricane Safety Procedures all residual water in each plumbing fixture trap. Back fill all traps, includingclean-out traps, with anti-freeze.3. Drain all hot water heaters, water storage tanks and other tanks containing water. 

Donot back fill with anti-freeze any tanks or Hurricane Safety Procedures lines used for domestic water use.4. Turn off the electric service to all electric motors operating HVAC equipment. Drainall HVAC systems of water. Remove all window units and re-seal windows.5. Turn off the electric service to all electric motors operating compressor pumps, etc.

Note: If required, and only after approval by DCAM, do not turn off electric serviceto sump pumps used to keep tunnels, cellars, etc. from flooding. Deactivate electrical systems in the building including lighting, Hurricane Safety Procedures power and electricmotor systems. This can be done by shutting down the main building power circuitand disconnection from the street. 

Power systems shall be left in a condition thatthey can easily be restarted.7. Notify local Telephone Company to disconnect phone service. 8. Turn off the main gas shut-off inside the building and the individual shut-offs to each appliance. For safety reasons, Hurricane Safety Procedures the local Gas Company must turn off the gas at thestreet.9. 

Remove all trash and Hurricane Safety Procedures debris and all personal property which has been declared worthless. Follow Department of Procurement and General Services Regulations.10. Properly archive all pertinent records. Notify the Secretary of the Commonwealth,Archives Division, 220 Morrissey Boulevard, Boston, MA 02125, telephone number(617) 727-2816. 

Do not leave any records stored within building.11. Remove all locksets and latching devices from interior doors, Hurricane Safety Procedures which may hinderaccess/egress. This is a Fire Department requirement.Elevator Shutdown 1. Provide for elevator shutdown in accordance with 524 CMR 11.00 Elevators Placed Out of Service.Elevators Placed Out of Service

All elevators and dumbwaiters placed out of active service for a period exceeding one year shall comply with the following:1) The owner or his agent shall notify the authorized elevator inspector in writing, Hurricane Safety Procedures giving the date when the elevator or dumbwaiter will be placed out of service.2) If the out of service period exceeds one year from the date of notice received,the complete installation shall be subject to a complete inspection and safetytest before again being placed in service.

Hoarding Is Defined As Compulsive Gathering

Your loved one keeps parts of the home off-limits and the curtains always drawn. People with a hoarding problem often try to hide it. They may close off areas of their home or try to keep others out of their home altogether. They may fear that if you   read more..

Facts About Hoarding

Hoarding is often a hidden issue in family medicine. Patients with hoarding problems often present with a sentinel event such as a fall or residential fire. Although hoarding is traditionally associated with obsessive-compulsive disorder, Hoarding Facts About Hoarding patients more commonly have secondary organic   read more..

Types Of Security For Fenced Yards

Storm surge levels on Galveston Island and on the west side of Galveston Bay are estimated to be between 10 and 15 ft. Here, too, several NOS tide gauges failed, although the gauge at Eagle Point on the west side of Galveston Bay recorded a maximum surge of 11.48 ft.The highest inundation, of at lea  read more..

Microburst Vs Tornado

Major wind damage In Albemarle, Stanly County caused by a Microburst National Weather Service, Raleigh, NC Report prepared on June 14, 2013 A microburst caused by a severe thunderstorm impacted Stanly County, including the city of Albemarle and surrounding areas, Wind Damage Microburst Vs Tornado on Thursday, June 13,  read more..

Can Carpet In A Flooded Basement Be Salvaged

Also, review the work of the Pat Huelman and the folks of the Cold Climate Housing Center. Pat and his peoplehave done a lot of work in this area. And he and Dick Stone do a lot of training -- Affordable Comfort, the Duluth EDC conference, etc. I don't believe any oftheir workcontradicts the in  read more..

Fire Damage Electronic Restoration Classes

Some Micro-miniature and Nano-miniature type connectors have the option of pre-terminated cross linked ETFE (TefzelTM) insulated wire pigtails. Users are advised that some ETFE insulations are known to out-gas trace amounts of corrosive fluorine over time. When this wire is used with nickel coated m  read more..

Cleanup Trauma And Accident Cleanup

Workers exposure to blood borne pathogens can be considerably reduced through a good housekeeping plan which results in a clean and healthy workplace. The following Crime Scene Cleanup Cleanup Trauma And Accident Cleanup processes are taken from the Occupational Safety and Health Administration (OSHA) and the Centers for Disease Control and   read more..

Compulsive Hoarding Elderly

As the population in the United States of older citizens increases, then also the amount of older adults that hoard. The impact of the Hoarding Compulsive Hoarding Elderly behavior on the health and safety of older people and the community could be significant, so are we ready? Hoarding can be defined as the collecting of a  read more..

Sewage And Floodwaters Contains Bacteria

Sewage and floodwaters contains bacteria, fecal material, viruses and other hazardous microorganisms, which can cause disease. These "germs" can be transmitted by touching contaminated items or by tracking them into uncontaminated areas on shoes. Children and pets are especially vulnerable. Odors fr  read more..

Asbestos Abatement Contractors

Aggressive sampling. "Aggressive sampling" shall mean a method of sampling in which the individual collecting the air sample creates activity by the use of mechanical equipment during the sampling period to stir up settled dust and simulate activity in that area of the building. AHERA. "AHER" shall   read more..