Meth Lab Cleanup >> Meth Manufacturing Labs

Once decontamination is completed, the certified contractor must perform the post-decontaminationsampling to determine compliance with the decontamination standard. It is also the responsibility of thecertified contractor to arrange for disposal of all waste materials, Meth Manufacturing Labs inspect the dumpster, truck, roll-off boxor other container of structure contents and waste prior to the waste leaving the site. Inspection is doneto ensure that no hazardous chemicals, containers of anhydrous ammonia, or biohazards (sharps, etc.)are improperly disposed.
 
The certified contractor must also ensure that all furniture, clothing, carpeting,and other items disposed have been destroyed Meth Manufacturing Labs or rendered unusable to prevent scavenging of theseitems. All wastes must be disposed of in accordance with state and federal EPA and DOT regulations.A Contractor’s Certificate of Decontamination (CCD) must be submitted to the Kentucky Division ofWaste Management by the certified contractor within sixty (60) days after decontamination services areperformed on a property.
 
 The CCD report, documents the assessment, decontamination, actions taken ata site, and chemical screening results. Electronic Meth Manufacturing Labs version can be requested from KDWM.KDWM reserves the right to conduct oversight, either with its own staff or a qualified contractor,of the meth lab decontamination activities performed by the certified contractor and to collect itsown post-decontamination samples to verify that the decontamination standard was met.
 
The certified contractor and the property owner shall retain all records related to the decontamination ofthe inhabitable property for a period of at least five (5) years after the CCD has been issued. Thisincludes the CCD, preliminary assessment findings, all data and laboratory Meth Manufacturing Labs analytical results of the postdecontamination sampling and quality assurance/quality control records, and field sampling logs.B. Lab Site EntryOnce notified by the local health department, law enforcement shall post signs on the exterior doors ofthe property with Notice of Meth Contamination signs warning of possible chemical contamination.
 
 The notice will remain on the property until it has been decontaminated by a certified contractor in accordancewith the law and this guidance document.Before entering the site, the certified contractor shall carefully consider the hazard potential fromexposure to chemical residues, confined spaces or other physical hazards, and proper Meth Manufacturing Labs personal protective equipment (PPE) to perform the decontamination. It is the contractor’s responsibility to ensurethat all personnel under their supervision have the necessary safety equipment and that their workactivities are conducted safely in accordance with KyOSH regulations in 803 KAR 2:403, and 29 CFR1926.50 to 1926.65, the construction industry standard and the federal HAZWOPER regulations forGeneral Site Worker.
 
 Keep in mind many of the spaces that shall require entry and cleaning could meetthe definition of a Confined Space per 803 Meth Manufacturing Labs KAR 2:200, and may require specialized training. The certified contractor shall always wear the appropriate personal protective equipment (PPE) includingrespiratory protection if needed, based on site conditions and air monitoring data, and based on the typeof work they are performing.
 
Monitoring/sampling equipment should include, but not be limited to:
• A photo-ionization detector (PID), flame ionization detector (FID) or similar device to check for thepresence of organic vapors in the air. The instrument must be properly calibrated and maintained,
• pH paper,
• De-ionized water,
• Camera (for documentation),
• Ruler and masking tape or pre-fabricated 10 cm by Meth Manufacturing Labs 10 cm template,
• Sample collection supplies including gauze pads, methanol, sample containers and cooler.
 
One hazard that shall not be overlooked when assessing or decontaminating a meth lab is hypodermicneedles. Needles can sometimes be mixed in with the trash and other wastes Meth Manufacturing Labs and can be found infurniture or intentionally hidden in unexpected places. The potential for transmission of blood-bornepathogens including HIV/AIDS or hepatitis through needle "sticks” can be a significant hazard for siteswhere "users” were present. Because of the possibility that the needles can penetrate personal protectiveequipment (PPE), extra caution should be taken by the certified contractor and their staff.
 
 Also, somelabs may have "booby traps” in place to make it difficult for law enforcement or others to access parts ofthe property. Caution should be taken when entering or investigating any Meth Manufacturing Labs former meth lab property.C. Preliminary AssessmentThe certified contractor shall conduct a preliminary assessment of the property and all structures onthe property. This information will be critical to how the property should be effectively and safely decontaminated.
 
Pre-decontamination sampling is not required, but samples may be collected ofsuspected cooking areas, spills or stained Meth Manufacturing Labs locations, waste disposal areas, HVAC system, plumbingfixtures, and other locations to determine the most effective plan for decontamination of the property.Once the property is decontaminated, post-decontamination samples are required.
 
The following shallbe collected and documented in the Contractor’s Certificate of Decontamination (CCD), DEP 5035,January 2009:
• Obtain copy of the KDWM Clandestine Drug Lab Meth Manufacturing Labs Preliminary Assessment Tier Selection Criteria,DEP 1016, January 2009 available by open records request to KDWM.
• Property description (i.e., physical address, latitude and longitude, legal description, physicallayout of the property, structural features, etc.)
• Photographic documentation of site
• During the initial walk-through the certified contractor shall note hazardous chemical use orstorage areas, waste disposal areas, cooking areas, chemical stains, fire damage, and otherobservable damage.
 
 
• Information about surfaces, furnishings, appliances, and other Meth Manufacturing Labs features
• Inspection of HVAC system
• Inspection of plumbing, septic system, sewer system
• Inspection of garages, barns, and other outbuildings on the property
• Identification of adjacent areas/units in multiple dwellings that may require cleaning
• Identification and documentation of areas of contamination
• Outdoor inspection for evidence of burn or trash pits, discolored soil, or dead vegetation,indicating possible contamination of water and/or soil.
 
 Site-Type Considerations
The layout of the lab, its structural characteristics and potential future use shall be considered whendesigning a decontamination plan. Lab sites may be loosely categorized as follows:
• Private occupancy structure, e.g., single family home and attached garage, apartment ormultiple dwelling
• Mobile residence, e.g., motor home, camper or manufactured Meth Manufacturing Labs home
• Non-occupancy structure, e.g., detached garage, barn, tool shed, etc.8) Articles of clothing and toys have the potential to be heavily contaminated withcontaminants of concern (COC), therefore they shall not be reused.
 
KDWM recommends that the certified contractor remove any clothing, children’s toysor other items left behind by the meth lab operator or their families, render themunusable, properly dispose of them, Meth Manufacturing Labs and provide disposal receipts. This step shall bephoto documented. Since removal and replacement of appliances is not anticipatedwith a Tier 1 Response, wash and clean all appliances thoroughly. For evaluatingpersonal items and contents of the structure, see Section L of this guidance.9) Please note all contaminated properties shall require at least a Tier 1 cleanupresponse.

Tenant Eviction Letter

Any person entitled to occupy the rental unit with the consent of the landlord, but has not signed the rental agreement. This occupant does not have the rights and obligations as a tenant under the rental agreement. This may include a spouse, family member, relative, Tenant Move Out Cleanup Tenant Eviction Letter or others who mov  read more..

Carpet Water Damage

Can I save my Christmas or other holiday decorations?It depends on how quickly you can dry them out and how easy they are to clean. For example,tinsel and Water Extraction Carpet Water Damage paper items that were flooded should probably be discarded. Flood damaged electriclights should be discarded unless they were kept  read more..

Clean Up After Fire Damage

During disasters, there are many community volunteers, who emerge with a lot of enthusiasm,some expertise, Fire Damage Clean Up After Fire Damage  and some tools appropriate to the fire tasks at hand but no connection to any organized planned response group. Unified Command's fire challenge is to marshal these spontan  read more..

Compulsive Hoarding Restoration

As a technician from a local water restoration company I have seen many Hoarding Compulsive Hoarding Restoration situations, some of them I am sure could classify as utterly amazing. Sometimes I think how can people live this way, but I obviously do not understand the way their mind thinks and how it processes the ability to ha  read more..

Drug Lab Clean Up

Burning a meth-contaminated structure in lieu of decontamination is prohibited, unless priorapproval has been granted. Approval shall be obtained from the Kentucky Division for Air Quality Meth Lab Cleanup Drug Lab Clean Up prior to a training or practice burn. Safety of firefighter entry into a former meth lab structu  read more..

Lead Paint Abatement Training

The standard requires that hand washing facilities be provided where occupational exposure to lead occurs. In addition, change areas, showers (where feasible), and lunchrooms or eating areas are to be made available to workers exposed to lead above Lead Paint Removal Lead Paint Abatement Training the PEL. 

  read more..

How To Remove Soot From A Painted Mantle

The results showed that when conditions were varied, different materials tested as the most corrosive. While all materials tested had a corrosive effect on the targets, there was not a consistent pattern in the reaction of the steel coupons to the test conditions. Enhancing condensation with ice typ  read more..

Dehumidification

After the flood, before you start doing anything, does an outside inspection to show if the Water Extraction Dehumidification edifice is safe? Check for physical water damage to see if it is safe to enter the edifice. Look for electrical shorts and live power wires. Electrical safety is the most important issue in floods.  read more..

Removing Lead Pipes

Lead can enter drinking water through corrosion of plumbing materials, especially where the water has high acidity or low mineral content that corrodes pipes and fixtures. Homes built before 1986 are more likely to have lead pipes, fixtures and solder. However, new homes are also at risk: Lead Paint Removal Removing Lead Pipes even   read more..

Fire Damage

When a fire breaks out, it almost every incident there'll be some kind of water damaged associated with the fire. Whether the fire was hot enough to set off the fire sprinklers or if the fire department was called, the employment of water will most certainly be used in an attempt to control a  read more..