Meth Lab Cleanup >> Meth Manufacturing Labs

Once decontamination is completed, the certified contractor must perform the post-decontaminationsampling to determine compliance with the decontamination standard. It is also the responsibility of thecertified contractor to arrange for disposal of all waste materials, Meth Manufacturing Labs inspect the dumpster, truck, roll-off boxor other container of structure contents and waste prior to the waste leaving the site. Inspection is doneto ensure that no hazardous chemicals, containers of anhydrous ammonia, or biohazards (sharps, etc.)are improperly disposed.
 
The certified contractor must also ensure that all furniture, clothing, carpeting,and other items disposed have been destroyed Meth Manufacturing Labs or rendered unusable to prevent scavenging of theseitems. All wastes must be disposed of in accordance with state and federal EPA and DOT regulations.A Contractor’s Certificate of Decontamination (CCD) must be submitted to the Kentucky Division ofWaste Management by the certified contractor within sixty (60) days after decontamination services areperformed on a property.
 
 The CCD report, documents the assessment, decontamination, actions taken ata site, and chemical screening results. Electronic Meth Manufacturing Labs version can be requested from KDWM.KDWM reserves the right to conduct oversight, either with its own staff or a qualified contractor,of the meth lab decontamination activities performed by the certified contractor and to collect itsown post-decontamination samples to verify that the decontamination standard was met.
 
The certified contractor and the property owner shall retain all records related to the decontamination ofthe inhabitable property for a period of at least five (5) years after the CCD has been issued. Thisincludes the CCD, preliminary assessment findings, all data and laboratory Meth Manufacturing Labs analytical results of the postdecontamination sampling and quality assurance/quality control records, and field sampling logs.B. Lab Site EntryOnce notified by the local health department, law enforcement shall post signs on the exterior doors ofthe property with Notice of Meth Contamination signs warning of possible chemical contamination.
 
 The notice will remain on the property until it has been decontaminated by a certified contractor in accordancewith the law and this guidance document.Before entering the site, the certified contractor shall carefully consider the hazard potential fromexposure to chemical residues, confined spaces or other physical hazards, and proper Meth Manufacturing Labs personal protective equipment (PPE) to perform the decontamination. It is the contractor’s responsibility to ensurethat all personnel under their supervision have the necessary safety equipment and that their workactivities are conducted safely in accordance with KyOSH regulations in 803 KAR 2:403, and 29 CFR1926.50 to 1926.65, the construction industry standard and the federal HAZWOPER regulations forGeneral Site Worker.
 
 Keep in mind many of the spaces that shall require entry and cleaning could meetthe definition of a Confined Space per 803 Meth Manufacturing Labs KAR 2:200, and may require specialized training. The certified contractor shall always wear the appropriate personal protective equipment (PPE) includingrespiratory protection if needed, based on site conditions and air monitoring data, and based on the typeof work they are performing.
 
Monitoring/sampling equipment should include, but not be limited to:
• A photo-ionization detector (PID), flame ionization detector (FID) or similar device to check for thepresence of organic vapors in the air. The instrument must be properly calibrated and maintained,
• pH paper,
• De-ionized water,
• Camera (for documentation),
• Ruler and masking tape or pre-fabricated 10 cm by Meth Manufacturing Labs 10 cm template,
• Sample collection supplies including gauze pads, methanol, sample containers and cooler.
 
One hazard that shall not be overlooked when assessing or decontaminating a meth lab is hypodermicneedles. Needles can sometimes be mixed in with the trash and other wastes Meth Manufacturing Labs and can be found infurniture or intentionally hidden in unexpected places. The potential for transmission of blood-bornepathogens including HIV/AIDS or hepatitis through needle "sticks” can be a significant hazard for siteswhere "users” were present. Because of the possibility that the needles can penetrate personal protectiveequipment (PPE), extra caution should be taken by the certified contractor and their staff.
 
 Also, somelabs may have "booby traps” in place to make it difficult for law enforcement or others to access parts ofthe property. Caution should be taken when entering or investigating any Meth Manufacturing Labs former meth lab property.C. Preliminary AssessmentThe certified contractor shall conduct a preliminary assessment of the property and all structures onthe property. This information will be critical to how the property should be effectively and safely decontaminated.
 
Pre-decontamination sampling is not required, but samples may be collected ofsuspected cooking areas, spills or stained Meth Manufacturing Labs locations, waste disposal areas, HVAC system, plumbingfixtures, and other locations to determine the most effective plan for decontamination of the property.Once the property is decontaminated, post-decontamination samples are required.
 
The following shallbe collected and documented in the Contractor’s Certificate of Decontamination (CCD), DEP 5035,January 2009:
• Obtain copy of the KDWM Clandestine Drug Lab Meth Manufacturing Labs Preliminary Assessment Tier Selection Criteria,DEP 1016, January 2009 available by open records request to KDWM.
• Property description (i.e., physical address, latitude and longitude, legal description, physicallayout of the property, structural features, etc.)
• Photographic documentation of site
• During the initial walk-through the certified contractor shall note hazardous chemical use orstorage areas, waste disposal areas, cooking areas, chemical stains, fire damage, and otherobservable damage.
 
 
• Information about surfaces, furnishings, appliances, and other Meth Manufacturing Labs features
• Inspection of HVAC system
• Inspection of plumbing, septic system, sewer system
• Inspection of garages, barns, and other outbuildings on the property
• Identification of adjacent areas/units in multiple dwellings that may require cleaning
• Identification and documentation of areas of contamination
• Outdoor inspection for evidence of burn or trash pits, discolored soil, or dead vegetation,indicating possible contamination of water and/or soil.
 
 Site-Type Considerations
The layout of the lab, its structural characteristics and potential future use shall be considered whendesigning a decontamination plan. Lab sites may be loosely categorized as follows:
• Private occupancy structure, e.g., single family home and attached garage, apartment ormultiple dwelling
• Mobile residence, e.g., motor home, camper or manufactured Meth Manufacturing Labs home
• Non-occupancy structure, e.g., detached garage, barn, tool shed, etc.8) Articles of clothing and toys have the potential to be heavily contaminated withcontaminants of concern (COC), therefore they shall not be reused.
 
KDWM recommends that the certified contractor remove any clothing, children’s toysor other items left behind by the meth lab operator or their families, render themunusable, properly dispose of them, Meth Manufacturing Labs and provide disposal receipts. This step shall bephoto documented. Since removal and replacement of appliances is not anticipatedwith a Tier 1 Response, wash and clean all appliances thoroughly. For evaluatingpersonal items and contents of the structure, see Section L of this guidance.9) Please note all contaminated properties shall require at least a Tier 1 cleanupresponse.

Complete Remodal From Tenant Trash

Landlords have the right to copies of all keys, as well as instructions on how to operate burglary or fire prevention devices added by the tenant. Before changing or adding locks or installing any devices, tenants should get the landlord's written permission Tenant Move Out Cleanup Complete Remodal From Tenant Trash and approval. 
  read more..

Tenant Trash Haul Away

Repair items that affect the safety and health of the tenant, the tenant may issue what is known as a 21-30 day notice. The tenant must serve the landlord with a written notice of the breach or action affecting the health and safety of the tenant and Tenant Move Out Cleanup Tenant Trash Haul Away request that the landlord correct   read more..

Prevention And Control Of Wildlife Damage

The Forest Service gives notice of and requests comment on proposed revisions to its policy on animal damage management to be published in the Forest Service Manual Chapter 2650. This Animal Damage Prevention And Control Of Wildlife Damage direction would replace current agency procedures for im  read more..

Providing Residential Mitigation Services

For Individuals Providing Residential Mitigation Services). Please check the box to indicate that you have taken and passed EPA's Radon Mitigation Exam. You are required to take and pass the mitigation exam prior to submitting an Radon Mitigation Providing Residential Mitigation Services application to be listed as a residential mitigation se  read more..

Mold Symptoms

Kern County, in the San Joaquin Valley, California, is one of the most highly coccidioidomycosis-endemic regions. The number of new cases of coccidioidomycosis in the area has varied widely from year to year; a low incidence of coccidioidomycosis from 1987 to 1990 (<500 reported cases a year in K  read more..

Local Wind Storm Cause Garbage Clean Up

FEMA did not approve debris plans that did not identify a DMS or disposal site. As mentioned previously, FEMA is considering revisions to its regulations to incorporate the increased federal share component of the PA Pilot Program, which would require PA applicants to identify DMS and final disposal  read more..

How To Clean After A Demolition

This plan has been developed to provide the framework for County government and other entities to clear and remove debris generated by a natural or human made event. This Debris Management Plan focuses on the types of activities that are likely to be required during a disruption or emergency, withou  read more..

How To Remove Storm Damage Debris

When soliciting for debris monitoring contracts, the advertisement should outline the required qualifications of the debris monitors. The Debris Removal How To Remove Storm Damage Debris qualifications should be appropriate for the individual responsibilities and duties. Debris monitors should have experience working on construction sites and  read more..

Withstanding Wind And Lightning

Rooftop Attachment of Lightning Protection Systems in High-Wind Regions Hurricane Katrina Recovery AdvisoryFEMA May 2006, Revised July 2006 Purpose: To recommend practices for installing lightning protection systems (LPS) that will enhance Wind Damage Withstanding Wind And Lightning wind resistance in high-wind regions. Key Iss  read more..

Contract With FEMA For Debris Removal

Lessons Learned: Plan for Managing Disaster Debris
The following suggestions for disaster debris planning are based on insights from community officials who recently have experienced a major natural disaster. Make a Long-term Debris Management Plan Every community consulted sugge  read more..