Meth Lab Cleanup >> OSHA Requirements For Meth Lab Cleanup

The decontamination standard set by Kentucky’s meth cleanup law is 0.1 micrograms of meth per100 square centimeters (0.1 ug/100 cm2) of surface materials. See Section V. InteriorDecontamination Procedures for the decontamination procedures for each tiered cleanup response.When states originally established cleanup standards for meth, due OSHA Requirements For Meth Lab Cleanup to lack of health effects informationand toxicity data, they were based primarily on the lowest level an analytical laboratory could reliablyachieve. Many states currently use a cleanup standard ranging from 0.05 to 0.5 micrograms ofmethamphetamine per one hundred square centimeters (ug/100 cm2) for meth in surface wipe samples.
 
However, a 2005 study by the Colorado Department for Public Health and the Environment found that thecleanup standards used OSHA Requirements For Meth Lab Cleanup by several states including Kentucky are protective of human health based onexpected child and adult exposure. Furthermore, research from the State of Minnesota has shown that sampling for meth may not be areliable measure of the entire volume of meth in a structure. Therefore, this guidance focuses heavilyon a decontamination process that is practical and can be implemented coupled with thecollection of post-decontamination samples to confirm that the standard has been achieved.
 
The goal of the overall cleanup process is to reduce risk to future occupants by reducing exposure tocontamination, through a combination of cleaning, disposal, decontamination and OSHA Requirements For Meth Lab Cleanup encapsulation activitiesdescribed in this guidance.All contaminated properties that have been posted by the health department or law enforcementshall undergo decontamination actions based on the tiered response level that has been recommendedfor the property by law enforcement in the Clandestine Drug Lab Preliminary Assessment Tier SelectionCriteria, DEP 1016 January 2009.
 
 This is further discussed in Section V. Interior Decontamination.This guidance is based on the presumption that all rooms and all structures on a meth manufacturer’s property are considered potentially contaminated. Therefore, these are the standards set forth by this OSHA Requirements For Meth Lab Cleanup guidance:
• All inhabitable properties containing a meth lab or chemicals shall be decontaminated followingthe procedures in this guidance.
• All non-occupied structures on a property where meth labs or chemicals are found shall beinspected. They shall be decontaminated if necessary. This includes outbuildings, detachedgarages, and sheds. These structures are likely locations of storage of chemicals and finished products.
 
III. CHEMICAL SAMPLING/DECONTAMINATION STANDARDS
A. Meth Wipe Sampling(See Appendix B.1. for sampling procedures)Meth wipe samples are typically collected by wiping a wall or other hard surface with a solventdampened wipe. Gauze pads, sponges or filter paper wetted with methanol are often used for surfacewipes. For many OSHA Requirements For Meth Lab Cleanup building materials, the amount of meth removed by wipe collection from the surface is asmall fraction of the total amount of meth present in the building material due to the material’s surfacetexture and porosity.
 
Meth wipe samples may be taken as part of the Preliminary Assessment conductedby the certified contractor to help determine site conditions before decontamination and to possibly helpin guiding cleanup efforts. However, wipe samples of the surfaces most likely to be contaminated,shall be taken following decontamination activities to demonstrate compliance with thedecontamination standard of 0.1 ug meth per 100 square centimeters (0.1 ug/100 cm2). SeeAppendix B.1 for required procedures for wipe sampling and OSHA Requirements For Meth Lab Cleanup refer to Section VI. Post-DecontaminationSampling of this guidance for specific meth sampling locations, and analytical requirements.
 
Several meth wipe sampling kits are available by a OSHA Requirements For Meth Lab Cleanup number of vendors, and are useful in screening areas todetermine if additional decontamination may be necessary or if one should collect quantitative wipesamples to meet the standard. However, results from wipe sample kits cannot be used for finalpost-decontamination sampling to meet the decontamination standard. Decontamination StandardsIndoor chemical-specific testing and screening recommendations and requirements are listed in Table 1below and described further in the following text.
 
 All areas tested must be photographed to document thelocation of the sampled area. Chemical screening shall be OSHA Requirements For Meth Lab Cleanup conducted during the assessment anddecontamination.Table 1: Decontamination StandardsChemical Decontamination Standard**Methamphetamine 0.1 µg/ 100 cm2(all surface materials)Corrosives(Acids/Bases) pH 6-8Volatile Compounds < 1 ppm total volatiles in air (PID or FID)Lead* Contact KDWM for standards and sampling requirementsMercury* Contact KDWM for standards and sampling requirements*Testing for lead and mercury may only be necessary for P2P (Amalgam) labs.**Testing that is required for all discovered meth labs.
 
Corrosives: Commonly used corrosives include but are not limited to Hydrochloric Acid, Sulfuric Acid,Sodium Hydroxide, Anhydrous Ammonia, Phosphoric Acid and Muriatic Acid. Surface pH testing duringthe assessment and decontamination process may be conducted. See Appendix B.2 for requiredsampling procedure.Volatile Chemicals (VOCs): Commonly used VOCs (solvents) include but are not limited to Acetone,Benzene, Ether, Freon, Hexane, Isopropanol, Methanol, OSHA Requirements For Meth Lab Cleanup Toluene and Xylene. Ammonia also is a volatileinorganic compound that can be detected through screening.
 
 VOC screening should be conducted in allrooms of OSHA Requirements For Meth Lab Cleanup the structure, for the safety of workers as well as for assessment purposes and to verifydecontamination. VOC screening can also be used to detect sources of residual organic vaporcontamination, such as in heating vents, plumbing and sewers. See Appendix B.2 for required samplingprocedurePhosphorus and Iodine: Removal of stained materials is the best means of remediating contaminationinvolving red phosphorus, iodine crystals, and tincture of iodine. Spray starch can be used as a screenfor the presence of iodine residues.
 
 When removal of stained material is not a reasonable option (such ason a concrete floor), the surface can be power-washed, allowed to dry, and then sealed.Mercury and Lead: P2P (Amalgam) meth labs involve the use of lead acetate and mercuric chloride.Typically, the processes (methods using phenyl-2-propanine (P2P) precursor) that used lead andmercuric compounds have been abandoned in favor of simpler methods using lithium or sodium metal, orred phosphorus and OSHA Requirements For Meth Lab Cleanup iodine. Decontamination of an inhabitable property in Kentucky shall be completed by a contractor certified bythe Energy and Environment Cabinet.
 
 The certified contractor shall conduct meth lab assessment,sampling and decontamination using the procedures of this guidance, and in accordance with KRS224.01-410. In addition to OSHA Requirements For Meth Lab Cleanup other requirements, the certified contractor is required to attend KyOSHrequired HAZWOPER safety training. A number of states including Tennessee and Indiana, as well asprivate vendors offer meth lab cleanup training that would be beneficial in developing an understanding ofthe issues affecting meth lab sites and decontamination. See KDWM’s webpage for links to other states’ programs for information on upcoming training classes.

Termites And Pest Control

PESTS SEEK PLACES TO LIVE that satisfy basic needs for air, moisture, food, and shelter. The best way to control pests is to try to prevent them from entering your home or garden in the first place. You can do this by removing the elements that they need to survive.Remove water. All living things, i  read more..

How To Use A Tarp To Repair A Roof

Hurricane Rita 2005 Rita, the third Category 5 hurricane of the season, was a destructive and deadly hurricane that devastated portions of southeastern Texas and southwestern Louisiana and significantly impacted the Florida Keys.A tropical wave and the remnants of an old front combined to produ  read more..

Floods Are The 1 Natural Disaster In The United S

Flood Facts WARNING: How Flood Smart are YOU? Floods are the #1 natural disaster in the United States. Why Care About Flooding Floods are the most common natural disaster in the United States. From 2003 to 2012, total flood insurance claims averaged more than $3.0 billion per year. In high-risk area  read more..

Document Scanning And Restoration Software

Because books differ in value and in the way they are used, it is important to select an appropriate type of rebinding when they become damaged. Library binding, one type of rebinding, is probably chosen for more books than any other type. Library binding is a good choice where economy Document restoration Document Scanning And Restoration Software and dura  read more..

Compulsive Hoarding Debris Hauling

There was one woman that was found, for example, living in among stacks of Tupperware containers, while another home was piled with trash that “an adult person can walk across the top of the trash and drag his hands along the ceiling.” Things collected might range from items that are valuabl  read more..

How Does A Radon Test Work

The meanings of these terms apply specifically to the RPP. The specialized definitions noted here are used in place of those found in standard dictionaries.Accepted application: An Application that has been entered into the Program database. Acceptance date: The Radon Mitigation How Does A Radon Test Work date on which EPA comp  read more..

What Is Needed To Be A Crime Scene Technician

Sometimes total electrical isolation is a good thing— and that's the idea behind a power-over-fiber (PoF) communications cable being developed by Sandia engineers. "It's common to isolate communications between systems or devices by using fiber optic cables, but if power is required, Crime Scene Cleanup What Is Needed To Be A Crime Scene Technician   read more..

Where Do Hurricane Come From

Charlotte Harbor, Florida Hurricane Charley came to Charlotte Harbor one Friday, with winds up to 114 mph, leaving the community stunned. Buildings were destroyed, and streets were filled with debris and downed power lines. While the storm was swirling through town, Wind Damage Where Do Hurricane Come From  30 newspaper  read more..

Asbestos Removal Disposal In Ohio

This section applies to all occupational exposures to asbestos in all industries covered by the Occupational Safety and Health Act, except as provided in paragraph (a)(2) and (3) of this section. This section does not apply to  Asbestos Abatement Asbestos Removal Disposal In Ohio construction work as defined in 29 CFR 1910.12(b).    read more..

Flooding Garbage Cleanup

Recommendation #8: Modify disaster assistance employee deployment processes to ensure that Incident Management Assistance Teams and Flood Damage Flooding Garbage Cleanup other FEMA first responders include one or more debris specialists with the experience and managementskills to assist communities in the crucial early st  read more..