Asbestos Abatement >> Asbestos Removal Specifications In Tennessee

Counting Fibers (1) Place the prepared sample slide on the mechanical stage of the microscope. Position the center of the wedge under the objective lens and focus upon the sample. (2) Start counting from one end of the wedge and Asbestos Removal Specifications In Tennessee progress along a radial line to the other end (count in either direction from perimeter to wedge tip). 

Select fields randomly, without looking into the eyepieces, by slightly advancing the slide in one direction with the mechanical stage control. (3) Continually scan over a range of local planes (generally the upper 10 to 15 um of the filter surface) with the fine focus control during Asbestos Removal Specifications In Tennessee each field count. Spend at least 5 to 15 seconds per field. 

Most samples will contain asbestos fibers with fiber diameters less than 1 um. Look carefully for faint fiber images. The small diameter fibers will be very hard to see. However, Asbestos Removal Specifications In Tennessee they are an important contribution to the total count. (5) Count only fibers equal to or longer than 5 um. Measure the length of curved fibers along the curve. 

Count fibers which have a length to width ratio of 3:1 or greater. (7) Count all the fibers in at least 20 fields. Continue counting until either 100 fibers are counted or 100 fields have been viewed; whichever occurs first. Count all the fibers in the final field. (8) Fibers lying entirely within the boundary of the Walton-Beckett graticule field shall receive a count of Asbestos Removal Specifications In Tennessee.

Fibers crossing the boundary once, having one end within the circle shall receive a count of 1/2. Do not count any fiber that crosses the graticule boundary more than once. Reject and do not count any other fibers even though Asbestos Removal Specifications In Tennessee they may be visible outside the graticule area. If a fiber touches the circle, it is considered to cross the line. 

Count bundles of fibers as one fiber unless individual fibers can be clearly identified and each individual fiber is clearly not connected to another counted fiber. See Figure 1 for counting conventions. (10) Record the number of fibers in each field in a consistent way such that filter non-uniformity can be assessed. (11) Regularly check Asbestos Removal Specifications In Tennessee phase ring alignment. 

When an agglomerate (mass of material) covers more than 25% of the field of view, reject the field and select another. Do not include it in the number of fields counted. (13) Perform a "blind recount" of 1 in every 10 filter wedges (slides). Re-label the slides using a person other than the original Asbestos Removal Specifications In Tennessee counter. 6.7. Fiber Identification 

As previously mentioned in Section 1.3., PCM does not provide positive confirmation of asbestos fibers. Alternate differential counting techniques should be used if discrimination is desirable. Differential Asbestos Removal Specifications In Tennessee counting may include primary discrimination based on morphology.

Polarized light analysis of fibers, or modification of PCM data by Scanning Electron or Transmission Electron Microscopy. A great deal of experience is required to routinely and correctly perform differential counting. It is discouraged unless it is legally necessary. Then, only if a fiber is obviously not asbestos should it be excluded from the Asbestos Removal Specifications In Tennessee count. 

Further discussion of this technique can be found in reference 8.10. If there is a question whether a fiber is asbestos or not, follow the rule: "WHEN IN DOUBT, COUNT." 6.8. Analytical Asbestos Removal Specifications In Tennessee Recommendations -- Quality Control System 6.8.1. 

All individuals performing asbestos analysis must have taken the NIOSH course for sampling and evaluating airborne asbestos or an equivalent course. 6.8.2. Each laboratory engaged in asbestos counting shall set up a slide trading arrangement with at least two other laboratories in order to compare performance Asbestos Removal Specifications In Tennessee and eliminate inbreeding of error. 

The slide exchange occurs at least semiannually. The round robin results shall be posted where all analysts can view individual analyst's results. 6.8.3. Each laboratory engaged in asbestos counting shall participate in the Proficiency Analytical Testing Program, the Asbestos Analyst Registry or equivalent. 
Each analyst shall select Asbestos Removal Specifications In Tennessee and count prepared slides from a "slide bank". 

These are quality assurance counts. The slide bank shall be prepared using uniformly distributed samples taken from the workload. Fiber densities should cover the entire range routinely analyzed by the laboratory. These Asbestos Removal Specifications In Tennessee slides are counted blind by all counters to establish an original standard deviation. This historical distribution is compared with the quality assurance counts. 

A counter must have 95% of all quality control samples counted within three standard deviations of the historical mean. This count is then integrated into a new historical mean and standard deviation for the slide. The Asbestos Removal Specifications In Tennessee analyses done by the counters to establish the slide bank may be used for an interim quality control program if the data are treated in a proper statistical fashion.  

CALCULATIONS Calculate the estimated airborne asbestos fiber concentration on the filter sample using the following formula: Where: AC = Airborne fiber concentration (For Equation A, ) FB = Total number of fibers greater than 5 um counted FL = Total number of fields counted on the filter BFB = Total number of fibers greater than 5 um counted in the blank BFL = 

Total number of fields counted on the blank ECA = Effective collecting area of filter (385 mm(2) nominal for a 25-mm filter.) FR = Pump flow rate (L/min) MFA = Microscope count field area (mm(2)). This Asbestos Removal Specifications In Tennessee is 0.00785 mm(2) for a Walton-Beckett Graticule. 

T = Sample collection time (min) 1,000 = Conversion of L to cc Note: The collection area of a filter is seldom equal to 385 mm(2). It is appropriate for laboratories to routinely monitor the exact diameter using an inside micrometer. The collection area is calculated according to the Asbestos Removal Specifications In Tennessee formula: 

Short-cut Calculation Since a given analyst always has the same interpupillary distance, the number of fields per filter for a particular analyst will remain constant for a given size filter. The field size for that analyst is constant (i.e. the Asbestos Removal Specifications In Tennessee analyst is using an assigned microscope and is not changing the reticle). 

For example, if the exposed area of the filter is always 385 mm(2) and the size of the field is always 0.00785 mm(2), the number of fields per filter will always be 49,000. In addition it is necessary to convert liters of air to cc. 
These three constants can then be combined such that Asbestos Removal Specifications In Tennessee. 

The previous equation simplifies to: (For Equation B, ) 7.3. Recount Calculations As mentioned in step 13 of Section 6.6.2., a "blind recount" of 10% of the slides is performed. In all Asbestos Removal Specifications In Tennessee cases, differences will be observed between the first and second counts of the same filter wedge. 

Most of these differences will be due to chance alone, that is, due to the random variability (precision) of the count method. Statistical recount  criteria enables one to decide whether observed differences can be explained due to chance alone or are probably due to systematic differences between Asbestos Removal Specifications In Tennessee analysts, microscopes, or other biasing factors.

Removing Smoke Odors From Fire damaged Furniture

The nonprofit NFPA's (National Fire Protection Association) Fire Safety Educational Memorial Fund Committee last month named the Seattle Hazmat Response Team, Seattle, Fire Damage Removing Smoke Odors From Fire damaged Furniture Washington as the 2004 recipient of the Warren E. Isman Educational Grant.

The team will use the grant to atten  read more..

Crawl Space Drying

Places that are often or always damp can be hard to maintain completely free of mold. If there's some mold in the shower or elsewhere in the bathroom that seems to reappear, increasing ventilation (running a fan or opening a window) and cleaning more frequently will usually prevent mold from   read more..

Emergency Board Up

Plywood shutters that you create yourself, if placed correctly, could provide a high degree of Wind Damage Emergency Board Up coverage from flying debris during a storm. Plywood shutters could be placed on all kinds of houses. Measure every window and every door that has glass, and add 8 inches to all the height and w  read more..

Carpet Cleaning Tips With Vinegar

GENERAL INFORMATION ON DRYING THE ENVIRONMENT AND WET MATERIALS Many criteria affect the choice of a drying method during recovery efforts. Among these are: Ability to appropriately stabilize the environment in order to begin recovery efforts Scale of damage Structural Drying Carpet Cleaning Tips With Vinegar and number of items affected   read more..

Tenant Rights Security Deposit

The tenant should itemize all problems or damage found in the rental unit within five days after they receive the list and return the list to the landlord. Tenants should look for faded paint, carpet that is worn or has visible furniture marks, dirty blinds, faded curtains, holes in walls, carpet o  read more..

Local Wind Storm Cause Garbage Clean Up

FEMA did not approve debris plans that did not identify a DMS or disposal site. As mentioned previously, FEMA is considering revisions to its regulations to incorporate the increased federal share component of the PA Pilot Program, which would require PA applicants to identify DMS and final disposal  read more..

Water Structural Drying

What is needed to thoroughly extract the adulteration and repair the damage? Shall the entire edifice or a portion of the edifice be evacuated and, if so, for how long? Could semi porous materials be sanitized, or shall they be replaced? What are the costs of using inadequate measures to extr  read more..

Cleanup A Trashed Repo

The service of a notice to quit upon a tenant or person in possession does not authorize an action to be maintained against the tenant or person for the possession of the premises until the expiration of the period for which that tenant or person may have paid rent Tenant Move Out Cleanup Cleanup A Trashed Repo for the premises in  read more..

Flooded Basement

Sanitation & Hygiene in a Flood It is critical for you to remember to practice basic hygiene during the emergency period. Always wash your hands with soap and water that has been boiled or disinfected: before preparing or eating food; after toilet use; Flood Damage Flooded Basement after participating in flood  read more..

Enzyme Odor Removal

Reducing Urine-Marking Behavior in Dogs and Cats MUCH LIKE THE MINERS DURING THE GOLD RUSH, dogs and cats are territorial animals. They "stake a claim to a particular space, area, or object. They let other people and animals know about their claim by marking it using a variety of methods at diff  read more..