Asbestos Abatement >> How To Remove Asbestos Siding

The following recount criterion is for a pair of counts that estimate AC in fibers/cc. The criterion is given at the type-I error level. That is, there is 5% maximum risk that we will reject a pair of counts for the reason that one might be biased, when the large How To Remove Asbestos Siding observed difference is really due to chance. 

Reject a pair of counts if: Where: AC1 = lower estimated  airborne fiber concentration AC2 = higher estimated airborne fiber concentration ACavg = average of the two concentration estimates (FB) = for the average of the two   concentration estimates If a pair of counts are rejected by this criterion then, recount the rest of the filters in the How To Remove Asbestos Siding submitted set. 

Apply the test and reject any other pairs  failing the test. Rejection shall include a memo to the industrial hygienist stating that the sample failed a statistical How To Remove Asbestos Siding test for homogeneity and the true air concentration may be significantly different than the reported value. 7.4. Reporting Results Report results to the industrial hygienist as fibers/cc. 

Use two significant figures. If multiple analyses are performed on a How To Remove Asbestos Siding sample, an average of the results is to be reported unless any of the results can be rejected for cause. 8. References 8.1. Dreesen, W.C., et al, U.S. Public Health Service: A Study of Asbestosis in the Asbestos Textile Industry, (Public Health Bulletin No. 241), US Treasury Dept., Washington, DC, 1938. 8.2. 

Asbestos Research Council: The Measurement of Airborne Asbestos Dust by the Membrane Filter How To Remove Asbestos Siding Method (Technical Note). Asbestos Research Council, Rockdale, Lancashire, Great Britain, 1969. 8.3. Bayer, S.G., Zumwalde, R.D., Brown, T.A., 

Equipment and Procedure for Mounting Millipore Filters and Counting Asbestos Fibers by Phase Contrast Microscopy, Bureau of Occupational Health, U.S. Dept. of Health, How To Remove Asbestos Siding Education and Welfare, Cincinnati, OH, 1969. 8.4. NIOSH Manual of Analytical Methods, 2nd ed., Vol. 1 (DHEW/ NIOSH Pub. No. 77-157-A). 

National Institute for Occupational Safety and Health, Cincinnati, OH, 1977. pp. 239-1-239-21. 8.5. Asbestos, Code of Federal Regulations 29 CFR 1910.1001. 1971. 8.6. Occupational Exposure to Asbestos, Tremolite, Anthophyllite, and Actinolite. Final How To Remove Asbestos Siding Rule, Federal Register 51:119 (20 June 1986). pp. 22612-22790. 8.7. 

Asbestos, Tremolite, Anthophyllite, and Actinolite, Code  of Federal Regulations 1910.1001. 1988. pp 711-752. 8.8. How To Remove Asbestos Siding Criteria for a Recommended Standard -- Occupational Exposure to Asbestos (DHEW/NIOSH Pub. No. HSM 72-10267), National Institute for Occupational Safety and Health NIOSH, Cincinnati,OH. 

Leidel, N.A., Bayer,S.G., Zumwalde, R.D.,Busch, K.A., USPHS/NIOSH Membrane Filter How To Remove Asbestos Siding Method for Evaluating Airborne Asbestos Fibers (DHEW/NIOSH Pub. No. 79-127). National Institute for Occupational Safety and Health, Cincinnati, OH.

Applications of Optical Microscopy in Analysis of Asbestos and Quartz, Analytical How To Remove Asbestos Siding Techniques in Occupational Health Chemistry, edited by D.D. Dollberg and A.W. Verstuyft. Wash. D.C.: American Chemical Society, (ACS Symposium Series 120) 1980. pp. 13-41. 

Quality Control The OSHA asbestos regulations require each laboratory to establish a quality control program. The following is presented as an example of how the OSHA-SLTC constructed its internal curve as part of meeting this requirement. Data is from How To Remove Asbestos Siding samples collected during OSHA compliance inspections and analyzed from October 1980 through April 1986. 

Each sample was counted by 2 to 5 different counters independently of one another. The standard deviation and the statistic was calculated for each sample. This How To Remove Asbestos Siding data was then plotted on a graph of vs. fibers/mm(2). A least squares regression was performed using the following equation: where: Application of least squares gave: 

Using these values, the equation becomes: Sampling Pump Flow Rate Corrections This How To Remove Asbestos Siding correction is used if a difference greater than 5% in ambient temperature and/or pressure is noted between calibration and sampling sites and the pump does not compensate for the differences. 

(For Equation D, ) Where: Q(act) = actual flow rate Q(cal) = calibrated flow rate (if a rotameter was used, the rotameter value) P(cal) = uncorrected air pressure at calibration P(act) = uncorrected air pressure at sampling site T(act) = temperature at How To Remove Asbestos Siding sampling site (K) T(cal) = temperature at calibration 

Graticule When ordering the Graticule for asbestos counting, specify the exact disc diameter needed to fit the ocular of the microscope and the diameter (mm) of the circular counting area. Instructions for measuring the How To Remove Asbestos Siding dimensions necessary are listed: (1) 

Insert any available graticule into the focusing eyepiece and focus so that the graticule lines are sharp and clear. (2) Align the microscope. (3) Place a stage micrometer on the microscope How To Remove Asbestos Siding object stage and focus the microscope on the graduated lines. (4) Measure the magnified grid length, PL (um), using the stage micrometer. 

Remove the graticule from the microscope and measure its actual grid length, AL (mm).  This can be accomplished by using a mechanical stage fitted with verniers, or a jeweler's loupe with a direct reading scale. (6) Let D = 100 um. Calculate the  How To Remove Asbestos Sidingcircle diameter, d(c)(mm), for the Walton-Beckett graticule and specify the diameter when making a purchase.

Each eyepiece-objective-reticle combination on the microscope must be calibrated. Should any of the three be changed (by zoom adjustment, disassembly, replacement, etc.), the  How To Remove Asbestos Siding combination must be recalibrated. Calibration may change if interpupillary distance is changed. 

Measure the field diameter.acceptable range: 100 plus or minus 2 um) with a stage micrometer upon receipt of the graticule from the manufacturer. Determine the How To Remove Asbestos Siding field area. The Graticule is available from: Graticules Ltd., Morley Road, Tonbridge TN9 IRN, Kent, England (Telephone 011-44-732-359061). 

Also available from PTR Optics Ltd., 145 Newton Street, Waltham, MA 02154 [telephone (617) 891-6000] or McCrone Accessories and How To Remove Asbestos Siding Components, 2506 S. Michigan Ave., Chicago, IL 60616 [phone (312)-842-7100]. The graticule is custom made for each microscope. Counts for the Fibers in the Figure.

Hurricane Katrina Flooding

FLOODED SEPTIC SYSTEMS What should I do if my septic system was flooded or damaged? Don’t use the system if the soil around the system is wet and flooded. The waste water will not be treated and will become a source of pollution.Once floodwaters have receded, Water Damage Hurricane Katrina Flooding there are several things  read more..

Odor Control

To maintain standard performance conditions for Sewage Cleanup Odor Control technicians that cleanup cleanups that involve raw sewage. To make sure that appropriate sewage clean-up processes and personal protection processes are followed during the sewage cleanup, and to protect the technicians, the community, and   read more..

How To Dehumidify A Flooded House

Dehumidifier Basics Capacity Dehumidifier capacity is usually measured in pints per 24 hours and is determined by two factors: the size of the space that needs to Dehumidification How To Dehumidify A Flooded House be dehumidified and the conditions that exist in the space before dehumidification. Use the chart below to estimate the ca  read more..

How To Clean Up Smoke Damage To Drywall

Smoke Production and Transport Butler and Mulholland give a very good synopsis of the generation and transport of smoke components [112]. They present the current state of knowledge about smoke aerosol phenomena that affect smoke toxicity: soot generation, fractal structure of soot, agglomerate tran  read more..

Carpet Cleaning After Water Damage

The Federal Emergency Management Agency and the city of New Orleans recently announced additional Katrina-related grants totaling nearly $7 million that will directly benefit two recovery projects within the city – the Joe Brown Center in New Orleans East and Water Extraction Carpet Cleaning After Water Damage the Municipal Yacht Harb  read more..

Black Mold

Skin and Eye Protection Gloves are required to protect the skin from contact with mold allergens (and in some cases black mold toxins) Mold Remediation Black Mold and from potentially irritating cleaning solutions. Long gloves that extend to the middle of the forearm are recommended. The glove material shou  read more..

Finger Print Dust Cleanup And Hazard Cleanup

Testimony from other lifeguards pointed out other conditions that injure swimmers or other beach patrons and require the assistance of the lifeguard, thereby resulting in occupational exposure to the lifeguard. Patrons suffer lacerations from rocks, shells, broken glass, fish hooks, Crime Scene Cleanup Finger Print Dust Cleanup And Hazard Cleanup o  read more..

How To Cure Hoarding

We are anticipating a significant and sustained increase in the number of hoarding cases that will be brought to the attention of community agencies. The increase is in part the result of greater public awareness of the hoarding phenomena through various media efforts and Hoarding How To Cure Hoarding the overall   read more..

Flood Prevention Tips

This is a manual on safe, healthy, green, and affordable rebuilding of water-damaged homes that will: Serve as a workbook for seminars Be distributed to people working on their own homes, volunteers, and other workers as a guide and reference manual Develop work protocols for contractors This manual  read more..

Hurricane Safety Procedures

The contractor must submit drawings to DCAM through the Department or Agency for approval of any windows or openings to be sealed by any method other than that shown in sketches listed in number 1 above.9. For windows over 48 inches wide or 96 inches in height, the contractor must submit drawings to  read more..