Asbestos Abatement >> How To Remove Asbestos Siding

The following recount criterion is for a pair of counts that estimate AC in fibers/cc. The criterion is given at the type-I error level. That is, there is 5% maximum risk that we will reject a pair of counts for the reason that one might be biased, when the large How To Remove Asbestos Siding observed difference is really due to chance. 

Reject a pair of counts if: Where: AC1 = lower estimated  airborne fiber concentration AC2 = higher estimated airborne fiber concentration ACavg = average of the two concentration estimates (FB) = for the average of the two   concentration estimates If a pair of counts are rejected by this criterion then, recount the rest of the filters in the How To Remove Asbestos Siding submitted set. 

Apply the test and reject any other pairs  failing the test. Rejection shall include a memo to the industrial hygienist stating that the sample failed a statistical How To Remove Asbestos Siding test for homogeneity and the true air concentration may be significantly different than the reported value. 7.4. Reporting Results Report results to the industrial hygienist as fibers/cc. 

Use two significant figures. If multiple analyses are performed on a How To Remove Asbestos Siding sample, an average of the results is to be reported unless any of the results can be rejected for cause. 8. References 8.1. Dreesen, W.C., et al, U.S. Public Health Service: A Study of Asbestosis in the Asbestos Textile Industry, (Public Health Bulletin No. 241), US Treasury Dept., Washington, DC, 1938. 8.2. 

Asbestos Research Council: The Measurement of Airborne Asbestos Dust by the Membrane Filter How To Remove Asbestos Siding Method (Technical Note). Asbestos Research Council, Rockdale, Lancashire, Great Britain, 1969. 8.3. Bayer, S.G., Zumwalde, R.D., Brown, T.A., 

Equipment and Procedure for Mounting Millipore Filters and Counting Asbestos Fibers by Phase Contrast Microscopy, Bureau of Occupational Health, U.S. Dept. of Health, How To Remove Asbestos Siding Education and Welfare, Cincinnati, OH, 1969. 8.4. NIOSH Manual of Analytical Methods, 2nd ed., Vol. 1 (DHEW/ NIOSH Pub. No. 77-157-A). 

National Institute for Occupational Safety and Health, Cincinnati, OH, 1977. pp. 239-1-239-21. 8.5. Asbestos, Code of Federal Regulations 29 CFR 1910.1001. 1971. 8.6. Occupational Exposure to Asbestos, Tremolite, Anthophyllite, and Actinolite. Final How To Remove Asbestos Siding Rule, Federal Register 51:119 (20 June 1986). pp. 22612-22790. 8.7. 

Asbestos, Tremolite, Anthophyllite, and Actinolite, Code  of Federal Regulations 1910.1001. 1988. pp 711-752. 8.8. How To Remove Asbestos Siding Criteria for a Recommended Standard -- Occupational Exposure to Asbestos (DHEW/NIOSH Pub. No. HSM 72-10267), National Institute for Occupational Safety and Health NIOSH, Cincinnati,OH. 

Leidel, N.A., Bayer,S.G., Zumwalde, R.D.,Busch, K.A., USPHS/NIOSH Membrane Filter How To Remove Asbestos Siding Method for Evaluating Airborne Asbestos Fibers (DHEW/NIOSH Pub. No. 79-127). National Institute for Occupational Safety and Health, Cincinnati, OH.

Applications of Optical Microscopy in Analysis of Asbestos and Quartz, Analytical How To Remove Asbestos Siding Techniques in Occupational Health Chemistry, edited by D.D. Dollberg and A.W. Verstuyft. Wash. D.C.: American Chemical Society, (ACS Symposium Series 120) 1980. pp. 13-41. 

Quality Control The OSHA asbestos regulations require each laboratory to establish a quality control program. The following is presented as an example of how the OSHA-SLTC constructed its internal curve as part of meeting this requirement. Data is from How To Remove Asbestos Siding samples collected during OSHA compliance inspections and analyzed from October 1980 through April 1986. 

Each sample was counted by 2 to 5 different counters independently of one another. The standard deviation and the statistic was calculated for each sample. This How To Remove Asbestos Siding data was then plotted on a graph of vs. fibers/mm(2). A least squares regression was performed using the following equation: where: Application of least squares gave: 

Using these values, the equation becomes: Sampling Pump Flow Rate Corrections This How To Remove Asbestos Siding correction is used if a difference greater than 5% in ambient temperature and/or pressure is noted between calibration and sampling sites and the pump does not compensate for the differences. 

(For Equation D, ) Where: Q(act) = actual flow rate Q(cal) = calibrated flow rate (if a rotameter was used, the rotameter value) P(cal) = uncorrected air pressure at calibration P(act) = uncorrected air pressure at sampling site T(act) = temperature at How To Remove Asbestos Siding sampling site (K) T(cal) = temperature at calibration 

Graticule When ordering the Graticule for asbestos counting, specify the exact disc diameter needed to fit the ocular of the microscope and the diameter (mm) of the circular counting area. Instructions for measuring the How To Remove Asbestos Siding dimensions necessary are listed: (1) 

Insert any available graticule into the focusing eyepiece and focus so that the graticule lines are sharp and clear. (2) Align the microscope. (3) Place a stage micrometer on the microscope How To Remove Asbestos Siding object stage and focus the microscope on the graduated lines. (4) Measure the magnified grid length, PL (um), using the stage micrometer. 

Remove the graticule from the microscope and measure its actual grid length, AL (mm).  This can be accomplished by using a mechanical stage fitted with verniers, or a jeweler's loupe with a direct reading scale. (6) Let D = 100 um. Calculate the  How To Remove Asbestos Sidingcircle diameter, d(c)(mm), for the Walton-Beckett graticule and specify the diameter when making a purchase.

Each eyepiece-objective-reticle combination on the microscope must be calibrated. Should any of the three be changed (by zoom adjustment, disassembly, replacement, etc.), the  How To Remove Asbestos Siding combination must be recalibrated. Calibration may change if interpupillary distance is changed. 

Measure the field diameter.acceptable range: 100 plus or minus 2 um) with a stage micrometer upon receipt of the graticule from the manufacturer. Determine the How To Remove Asbestos Siding field area. The Graticule is available from: Graticules Ltd., Morley Road, Tonbridge TN9 IRN, Kent, England (Telephone 011-44-732-359061). 

Also available from PTR Optics Ltd., 145 Newton Street, Waltham, MA 02154 [telephone (617) 891-6000] or McCrone Accessories and How To Remove Asbestos Siding Components, 2506 S. Michigan Ave., Chicago, IL 60616 [phone (312)-842-7100]. The graticule is custom made for each microscope. Counts for the Fibers in the Figure.

How To Clean Smoke Damaged Houses

In a secondary test procedure, the smoke-contaminated electronic counters were subjected to high humidity while powered. The less contaminated of the two exhibited no loss of functionality, while the other failed after an unknown amount of time in a 95 % humidity environment. It was determined that   read more..

Meth Lab Cleanup

Methamphetamine, is unlike many drugs, meaning it is manufactured and is not cultivated or derived from a particular plant, such as the case with marijuana, heroin, and cocaine. Meth has to be manufactured from other chemicals and processes, most of which are   read more..

LA Animal Control

HOW CAN I PREVENT WILD ANIMALS FROM FORAGING FOR FOOD IN MY YARD? Skunks, raccoons, opossums, (and in some cases bears) are nocturnal or nighttime active animals and are often attracted to residential areas by the availability of food, water, and shelter. Removing or eliminating the availability of   read more..

Certified In Lead Paint Removal

Is Lead Certification Required for the type of work I do? You may need to be certified! There are some situations in which you are legally required to be CDPH Lead-Related Construction (LRC) certified. Even if certification is not required in your situation, CDPH encourages you to become trained and  read more..

Mold And Mildew From Flash Floods

Following a widespread flooding disaster, many questions arise from citizens within the communities affected and from the many volunteers and organizations that are working in the devastated area. Personal health and safety is a priority for everyone. The following information is aimed at preventing  read more..

The Cost To Remove Lead Paint

How Are Workers Exposed to Lead?Workers can be exposed to lead by creating dust or fumes during everyday work activities. Fumes are easier to breathe in and therefore may be more dangerous than dust. These are some of the most common ways to be exposed. LEAD DUST is produced in Lead Paint Removal The Cost To Remove Lead Paint many ways i  read more..

Asbestos Removal Specifications In Tennessee

Counting Fibers (1) Place the prepared sample slide on the mechanical stage of the microscope. Position the center of the wedge under the objective lens and focus upon the sample. (2) Start counting from one end of the wedge and Asbestos Abatement Asbestos Removal Specifications In Tennessee progress along a radial line to the other end (c  read more..

Structural Drying

There are lots of reasons that water may get into your electronic components, causing damage. If the component is powered up at the time the water is introduced to the electronic component, it may not be repairable. This is something that needs to be determined by a professional Electronic Restoration Structural Drying technici  read more..

Crime Scene Robbery Cleaner Training

OSHA is concerned that the words "treated to render bloodborne pathogens noninfectious" may present a problem because there is little or no information in the record that deals with such treatment. The standard does recognize that some blood and blood components and blood products present littl  read more..

Sewer Backup Caused Black Mold

The Community Folk Art Center, 805 E. Genesee St., will remain closed this week as officials continue to clean up. Water leaked through the ceiling and the sewer backed up, said Kevin Leonardi, its marketing specialist. Staff members quickly moved art and equipment to safety, but repairs were n  read more..